[4] |
马 银,赵兴东,姬 祥,等. 思山岭铁矿深井工作面预注浆技术[J]. 现代矿业,2015,31(10):30-32.(MA Yin,ZHAO Xingdong,JI Xiang,et.al,Pre-grouting at working face of shaft sinking at Sisanling iron mine[J]. Modern Mine,2015,31(10):30-32.(in Chinese))
|
[24] |
孟 强,赵洪波,茹忠亮,等. 锚杆支护圆形隧洞弹塑性解[J]. 工程力学,2015,32(7):17-25.(MENG Qiang,ZHAO Hongbo,RU Zhongliang,et al. Elastic-plastic solution of rock bolt supporting circular tunnel[J]. Engineering mechanics,2015,32(7):17-25.(in Chinese))
|
[2] |
刘 晗. 超深竖井快速施工[J]. 建井技术,2019,40(1):1-4.(LIU Han. Rapid construction of ultra deep vertical shaft. mine construction technology[J]. Mine Construction Technology,2019,40(1):1-4.(in Chinese))
|
[5] |
周新勍. 新城金矿立井含水层破碎带综合治理施工方法[J]. 现代矿业,2016,32(8):250-252.(ZHOU Xinqing. Construction method for comprehensive treatment of aquifer fracture zone in vertical shaft of xincheng gold mine[J]. Modern Mining,2016,32(8):250-252.(in Chinese))
|
[9] |
中华人民共和国国家标准编写组. GB 50384-2016 煤矿立井井筒及硐室设计规范[S]. 北京:中国计划出版社,2016.(The National Standards Compilation Group of People¢s Republic of China. GB 50384-2016 Code for design of shaft and chamber in coal mine[S]. Beijing:China Planning Publishing House,2016.(in Chinese))
|
[11] |
中华人民共和国国家标准编写组. GB50108-2008地下工程防水规范[S]. 北京:中国计划出版社,2008.(The National Standards Compilation Group of People¢s Republic of China. GB50108-2008 Code for waterproofing of underground works[S]. Beijing:China Planning Press,2008.(in Chinese))
|
[12] |
赵长春,孔令芝,崔秋波,等. 山东黄金矿业股份有限公司新城金矿采选10000t/d扩建工程主井工程地质勘察报告[R]. 济南:中国冶金地质总局山东正元地质勘查院,2012.(ZHAO Changchun,KONG Lingzhi,CUI Qiubo,et al. Engineering geological investigation report of main shaft of 10000t/d expansion project of Xincheng gold mine,Shandong gold mining co.,ltd.[R]. Jinan:China Metallurgical Geology General Administration,Shandong Zhengyuan Geological Exploration Institute,2012.(in Chinese))
|
[25] |
徐芝纶. 弹性力学(上册)[M]. 北京:高等教育出版社,2006:7-8.(XU Z L. Elasticity(vol. I)[M]. Beijing:Higher Education Press,2006:7-8.(in Chinese))
|
[1] |
周晓敏,谢琰珂,李德春,等. 磁西副立井超千米单层井壁受力变形实测与分析[J]. 煤炭学报,2015,40(5):1 015-1 020.(ZHOU Xiaomin,XIE Yanke,LI Dechun,et al. Field monitoring and analysis on the stressing deformation of single layer lining of auxiliary shaft over 1 000 m deep in Cixi Colliery[J]. Journal of China Coal Society,2015,40(5):1 015-1 020.(in Chinese))
|
[6] |
中华人民共和国国家标准编写组. GB50915-2013有色金属矿山井巷工程设计规范[S]. 北京:中国计划出版社,2013.(The National Standards Compilation Group of People¢s Republic of China. GB50915-2013 Code for design of shaft and roadway engineering in non-ferrous metal mines[S]. Beijing:China Planning Publishing House,2013.(in Chinese))
|
[7] |
中华人民共和国国家标准编写组. GB 50213-2010煤矿井巷工程质量验收规范[S]. 北京:中国计划出版社,2011.(The National Standards Compilation Group of People¢s Republic of China. GB 50213-2010 Code for quality acceptance of coal mine shaft and roadway engineering[S]. Beijing:China Planning Publishing House,2011.(in Chinese))
|
[17] |
李忠华,潘一山. 有渗流作用的油井井壁稳定性的解析分析[J]. 工程力学,2002,19(3):105-108.(LI Zhonghua,PAN Yishan. Analytical analysis of wellbore stability with seepage[J]. Engineering Mechanics,2002,19(3):105-108.(in Chinese))
|
[3] |
彭铁红,刘连合. 中国华冶攻克深井开采施工技术难题“1 500 m以上超深竖井安全高效施工关键技术研究”项目顺利通过国家有关部委验收[EB/OL]. 北京:中冶集团,中国华冶集团.(2016-06-29) [2020-03-26].(PENG Tiehong,LIU Lianhe. China Huaye has overcome technical difficulties in deep-well mining and construction,and the project of "Research on key technologies for safe and efficient construction of ultra-deep shaft above 1500m" has passed the acceptance inspection of relevant national ministries and departments [EB/OL]. Beijing:Metallurgical Corporation of China Ltd.,China Huaye Group Company Ltd..(2016-06-29)[2020-03-26]. http://www.mccchina.com/mcc/_132162/_132877/_132881/404557/index.html.(in Chinese))
|
[10] |
中华人民共和国国家标准编写组. GB50164-2011 混凝土质量控制标准[S]. 北京:中国建筑工业出版社,2011.(The National Standards Compilation Group of People¢s Republic of China. GB50164-2011 Concrete quality control standard [S]. Beijing:China Construction Industry Press,2011.(in Chinese))
|
[13] |
ZHOU X M,XU Y,HE X N,et al. Comparative study on mechanical prorerties of concrete and surrounding rock in xincheng gold mine shaft based on unified standard[C]// SDC 2019 4th international conference on shaft design and construction. Toronto:Canadian Institute of Mining,Metallurgy and Petroleum,2019:372-384.
|
[15] |
陈 梁,茅献彪,李 明,等. 基于Drucker-Prager准则的深部巷道破裂围岩弹塑性分析[J]. 煤炭学报,2017,42(2):484-491. (CHEN Liang,MAO Xianbiao,LI Ming,et al. Elastic-plastic analysis of deep roadway fracture surrounding rock based on drucker-prager criterion[J]. Chinese Journal of Coal,2017,42(2):484-491.(in Chinese))
|
[8] |
中华人民共和国国家标准编写组. GB 50215-2005煤炭工业矿井设计规范[S]. 北京:中国计划出版社,2005.(The National Standards Compilation Group of People¢s Republic of China. GB 50215-2005 Code for design of coal mines in coal industry[S]. Beijing:China Planning Publishing House,2005.(in Chinese))
|
[18] |
王秀英,谭忠盛,王梦恕,等. 山岭隧道堵水限排围岩力学特性分析[J]. 岩土力学,2008,29(1):75-80.(WANG Xiuying,TAN Zhongsheng,WANG Mengsu,et al. Analysis on mechanical properties of surrounding rock for water plugging and drainage limitation in shanling tunnel[J]. Rock and soil mechanics,2008,29(1):75-80.(in Chinese))
|
[20] |
LEE I M,NAN S W . The study of seepage forces acting on the tunnel lining and tunnel face in shallow tunnels[J]. Tunnelling and Underground Space Technology,2001,16(1):31-40.
|
[23] |
CARRANZA-TORRES C,FAIRHURST C. Application of the Convergence- Confinement method of tunnel design to rock masses that satisfy the Hoek-Brown failure criterion[J]. Tunnelling and Underground Space Technology,2000,15(2):187-213.
|
[27] |
陈崇希. 地下水动力学[M]. 五版. 北京:地质出版社,2011:32-36.(Chen Chongxi. Groundwater dynamics[M]. fifth ed. Beijing:geological Publishing House,2011:32-36.(in Chinese))
|
[28] |
周晓敏,陈建华,罗晓青. 孔隙型含水基岩段竖井井壁厚度拟订设计研究[J]. 煤炭学报,2009,34(9):1 174-1 178.(ZHOU Xiaoming,CHEN Jianhua,LUO Xiaoqing. Study on shaft lining thickness formulation and design of pore type water-bearing bedrock section[J]. Journal of Coal,2009,34(9):1 174-1 178. (in Chinese))
|
[14] |
侯公羽,牛晓松. 基于Levy-Mises本构关系及D-P屈服准则的轴对称圆巷理想弹塑性解[J]. 岩土力学,2009,30(6):1 555-1 562. (HOU Gongyu,NIU Xiaosong. An ideal elastoplastic solution of axisymmetric circular roadway based on the Levy-Mises constitutive relationship and D-P yield criterion[J]. Rock and Soil Mechanics,2009,30(6):1 555-1 562.(in Chinese))
|
[16] |
李宗利,任青文,王亚红. 考虑渗流场影响深埋圆形隧洞的弹塑性解[J]. 岩石力学与工程学报,2004,23(8):1 291-1 295.(LI Zongli,REN Qingwen,WANG Yahong. Considering the influence of seepage field on the elastic-plastic solution of deep buried circular tunnel[J]. Journal of Rock Mechanics and Engineering,2004,23(8):1 291- 1 295.(in Chinese))
|
[26] |
张丙强,王启云,臧万军. 非达西渗流效应对深埋圆形隧洞弹塑性解的影响[J]. 铁道学报,2018,40(8):139-145.(ZHANG Bingqiang,WANG Qiyun,ZANG Wanjun. Influence of non-darcy seepage flow effect on elastic-plastic solution of deep buried circular tunnel[J]. Journal of Railway Engineering,2008,40(8):139-145.(in Chinese))
|
[19] |
许 渊,李 亮,邹金锋,等. 考虑轴向力和渗透力时圆形隧道广义Hoek-Brown解[J]. 岩土力学,2015,36(10):2 837-2 846.(XU Yuan,LI Liang,ZOU Jinfeng,et al. Generalized Hoek-Brown solution for circular tunnel with axial and osmotic forces considered[J]. Rock and Soil Mechanics,2015,36(10):2 837-2 846.(in Chinese))
|
[21] |
CARRANZA-TORRES C,ZHAO J. Analytical and numerical study of the effect of water pressure on the mechanical response of cylindrical lined tunnels in elastic and elasto-plastic porous media[J]. International Journal of Rock Mechanics and Mining Sciences,2009,46(3):531-547.
|
[22] |
王秀英,王梦恕,张 弥. 山岭隧道堵水限排衬砌外水压力研究[J]. 岩土工程学报,2005,27(1):125-127.(WANG Xiuying,WANG Mengsu,ZHANG Mi. Study on the external water pressure of lining for water blocking and drainage in Shanling tunnel[J]. Journal of geotechnical engineering,2005,27(1):125-127.(in Chinese))
|