PREDICTION AND MONITORING ANALYSIS OF IMMERSION EFFECTS OF CHAOZHOU CITY ZONE
STABILITY ANALYSIS AND CONSIDERATIONS OF UNDERGROUND POWERHOUSE CAVERNS GROUP OF JINPING I HYDROPOWER STATION
DEVELOPMENT OF A DOUBLE LINKAGE TRIAXIAL TESTING MACHINE FOR HYDRO-MECHANICAL COUPLING IN SOFT ROCK
MATERIAL FORCE METHOD FOR SIMULATING SECONDARY STRUCTURES IN ROCK MASSES AND ITS FINITE ELEMENT IMPLEMENTATION AND APPLICATION
METHOD FOR CALCULATING SETTLEMENT OF RIGID-PILE COMPOSITE FOUNDATION
STABILITY ANALYSIS AND TREATMENT OF GUANGHUI OIL DEPOT SLOPE IN SHENZHEN
ELASTIC CALCULATION MODEL FOR DYNAMIC ADDITIONAL STRESSES IN LAYERED SUBGRADE UNDER TRAFFIC LOAD
TEST RESEARCH ON TYPICAL MECHANICAL CHARACTERISTICSOF SOFT CLAY UNDER LATERAL UNLOADING CONDITION
EXPERIMENTAL RESEARCH ON SATURATED MUCKY FOUNDATION TREATMENT WITH WELL-POINT DEWATERING COMBINED WITH DYNAMIC COMPACTION METHOD
EFFECT OF STRESS PATH ON SURROUNDING ROCK PRESSURE OF SUPER LARGE-SECTION TUNNEL
EFFECT ANALYSIS OF PREVENTING SEEPAGE ENGINEERING IN SHIJIAO SEGMENT OF NORTH RIVER LEVEE
DESIGN AND MONITORING OF STEEL SHEET PILE COFFERDAMS OF LIEDE BRIDGE IN GUANGZHOU
TEST AND THEORETICAL RESEARCH ON PERMEABILITY CHARACTERISTICS OF SHEAR FRACTURE IN ROCK MASS
TEST STUDY OF DEFORMATION AND DAMAGE MECHANISM OF HORSESHOE-SHAPED TUNNEL CROSSING GROUND FISSURE WITH 40°
IMPROVED METHOD FOR CALCULATING NONLINEAR SETTLEMENTS OF STRIP FOUNDATION
EXPERIMENTAL ANALYSIS OF INFLUENCE OF CREEP ON PERMEABILITY OF GAS-BERING COAL
STUDY OF DEFORMATION AND FAILURE LAWS OF DEEP ROADWAY AND COUNTERMEASURES IN JINING COAL MINE NO.2
GEOSTRESS CHARACTERISTIC AND SIMULATION EXPERIMENT OF ROCKBURST OF A DEEP-BURIED TUNNEL IN GAOLIGONG MOUNTAIN
IN-SITU TEST OF FRACTURED ROCK MASS WITH HIGH PRESSURE SEEPAGE IN DAM FOUNDATION
TEST STUDY OF INFLUENCE OF BRINE ON TENSILE STRENGTH OF MUDDY INTERCALATION
A MESO-MECHANICAL COUPLING CONSTITUTIVE MODEL OF DAMAGE AND PERMEABILITY IN ROCK-LIKE MATERIALS UNDER TRIAXIAL COMPRESSION
STUDY OF CONTROL CAVING METHODS AND REASONABLE HANGING ROOF LENGTH ON HARD ROOF
Based on the characteristic of large primary bestraddle distance,long periodic fracture hanging roof and serious threaten to mine safety in hard roof long working face,three control caving methods of the primary fracture and the reasonable hanging roof length of periodic fracture are studied systematically. Three caving methods controlled by blast such as cycle shallow kerve,middle kerve and tip kerve are used to shorten the primary fracture distance of hard roof working face,of which the kerve depth and blasting quantities are analyzed and contrasted by establishing mechanical model of rock embedded beam at both ends. The results show that side kerve is the least,middle kerve is followed and cycle shallow kerve is the largest on the part of blasting quantities. By establishing and analyzing the model of cantilever rock beam,the reasonable overhanging length and face support strength are ascertained on the basis of designed resistance of face support. Additionally,the relation between overlying strata load and the working face controlling roof distance is deduced. This study has a successful application to working face 15102 of Qiling mine in Jincheng;and it can provide theoretical support and application guidance to control caving in hard roof under the corresponding conditions.
MODEL TEST STUDY OF DEEP-HOLE INDUCED CAVING IN MINING ENVIRONMENT REGENERATION
STUDY OF IN-SITU DATA OF PILE-SUPPORTED EMBANKMENT WITH PILE PARTIALLY PENETRATED IN SOFT SOILS
PERMEABILITY CHARACTERISTICS OF ROCK AND SOIL AGGREGATE OF BACKFILLING OPEN-PIT AND PARTICLE ELEMENT NUMERICAL ANALYSIS
STUDY OF STABILITY OF REMNANT MOUNTAIN BODY IN BACK SCARP OF TANGJIASHAN LANDSLIDE AFTER “5.12” WENCHUAN EARTHQUAKE
STUDY OF FORMATION CONDITIONS AND TOSS MOTION PROGRAM OF HIGH LANDSLIDES INDUCED BY EARTHQUAKE
ANALYSIS OF LANDSLIDE INDUCED BY WENCHUAN EARTHQUAKE BY STRONG MOTION RECORDS