Citation Search Quick Search
Artiles Current Issue | Archive | Adv Search |
STUDY OF FEEDBACK ANALYSIS AND SAFETY CONTROL OF LARGE-SECTION TUNNEL EXCAVATION UNDER INTENSIVE BUILDINGS
YANG Ping1,2,QIN Weimin3,YANG Yu4,WANG Tao5
(1. Faculty of Engineering,China University of Geosciences,Wuhan,Hubei 430074,China;2. China Soilbase Engineering Co.,Ltd.,Beijing 100022,China;3. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;4. China Xiamen Road and Bridge Construction
Group Co.,Ltd.,Xiamen,Fujian 361026,China;5. Key Laboratory of Geotechnical Mechanics and Engineering of Ministry
of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号