Citation Search Quick Search
Artiles Current Issue | Archive | Adv Search |
STUDY OF UNLOADING ROCK MASS DEFORMATION PARAMETERS FOR HIGH ARCH DAM FOUNDATION BASE OF GOUPITAN HYDROPOWER STATION
LI Weishu1,ZHOU Huoming1,CHEN Hua2,LIU Yang1,LING Wei2
(1. Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China;2. Wuhan Yangtze River Engineering Geophysical Surveys Co.,Ltd.,Wuhan,Hubei
430010,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号