Citation Search Quick Search
Artiles Current Issue | Archive | Adv Search |
REINFORCEMENT STRATEGIES OF CONSTRUCTION IN SHALLOW-HURIED TUNNEL ENTRANCE USING PIPE-ROOFING METHOD IN VALLEY

WANG Shihhui1,2,WANG Cheinlee1,HSIEH Chitai1

(1. Department of Resources Engineering,Cheng Kung University,Tainan,Taiwan 70101,China;
2. Raito Engineering Consultant Corporation,Taipei,Taiwan 10047,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号