Citation Search Quick Search
  2012, Vol. 31 Issue (6): 1184-1191    DOI:
Artiles Current Issue | Archive | Adv Search |
CONSTRUCTION SCHEME CHOICE OF LARGE-SPAN TUNNELS UNDER-PASSING HIGH VOLTAGE TRANSMISSION TOWER AND ITS APPLICATION
YANG Junsheng1,YANG Yuanhong1,2,YAN Li3,ZHANG Hualin1,3,HU Xin1,TANG Peng1
(1. School of Civil Engineering,Central South University,Changsha,Hunan 410075,China;2. China Forest Exploration and
Design Institute On Kunming,Kunming,Yunnan 650216,China;3. School of Civil Engineering and Architecture,Changsha University of Science and Technology,Changsha,Hunan 410076,China)
Copyright © 2005-2015 Edited and Published by Editorial Office for Chinese Journal of Rock Mechanics and Engineering
Sponsored by : Chinese Society for Rock Mechanics and Engineering 
Published by : Science Press 
Address: Wuhan 430071, China  Tel: (027)87199250  Fax: (027)87199250  Email: rock@whrsm.ac.cn
DESIGNED BY: Beijing Magtech Science & Technolgy Development Co.,Ltd.
鄂公网安备 42010602003581号