[4] |
TERZAGHI K. Rock defects and loads in tunnel supports[C]// Rock Tunneling With Steel Supports. Youngstown,Ohio:The Commercial Shearing and Stamping Co.,2004:17-99.
|
[1] |
李国良,李 宁. 挤压性围岩隧道若干基本问题探讨[J]. 现代隧道技术,2018,55(1):1-6.(LI Guoliang,LI Ning. Discussion of tunnelling in squeezed surrounding rock[J]. Modern Tunnelling Technology,2018,55(1):1-6.(in Chinese))
|
[11] |
宋金贵. 横洞进正洞交叉口设计优化方案研究[J]. 隧道建设,2017,37(增1):168-173.(SONG Jingui. Study of optimization scheme of design of connection section between horizontal gallery and main tunnel[J]. Tunnel Construction,2017,37(Supp.1):168-173.(in Chinese))
|
[21] |
尉洪利,吴立辉,邵宏杰. 狮子坪隧道交叉断面结构安全研究[J]. 公路,2020,65(10):355-360.(WEI Hongli,WU Lihui,SHAO Hongjie. Study on the safety of Shiziping tunnel cross section structure[J]. Highway,2020,65(10):355-360.(in Chinese))
|
[2] |
白雅伟,李梦瑶,邵 帅,等. 深埋公路隧道复杂断面十字交叉施工稳定性数值分析[J]. 水利与建筑工程学报,2020,18(6):128-134.(BAI Yawei,LI Mengyao,SHAO Shuai,et al. Numerical analysis of the stability of deep-buried highway tunnels with complex cross sections[J]. Journal of Water Resources and Architectural Engineering,2020,18(6):128-134.(in Chinese))
|
[6] |
王成虎,沙 鹏,胡元芳,等. 隧道围岩挤压变形问题探究[J]. 岩土力学,2011,32(增2):143-147.(WANG Chenghu,SHA Peng,HU Yuanfang,et al. Study of squeezing deformation problems during tunneling[J]. Rock and Soil Mechanics,2011,32(Supp.2):143-147.(in Chinese))
|
[9] |
李术才,徐 飞,李利平,等. 隧道工程大变形研究现状、问题与对策及新型支护体系应用介绍[J]. 岩石力学与工程学报,2016,35(7):1 366-1 376.(LI Shucai,XU Fei,LI Liping,et al. State of the art:challenge and methods on large deformation in tunnel engineering and introduction of a new type supporting system[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(7):1 366-1 376.(in Chinese))
|
[12] |
钱玉佳,乔海洋,江志鹏,等. 隧道横洞进双线正洞交叉口导洞法施工研究[J]. 建筑结构,2021,51(增1):2 340-2 345.(QIAN Yujia,QIAO Haiyang,JIANG Zhipeng,et al. Research on the construction of roof raising at cross tunnel into double main tunnel intersection[J]. Building Structure,2021,51(Supp.1):2 340-2 345.(in Chinese))
|
[14] |
王 玥,史继尧. 大断面黄土隧道三岔口区域前期变形分析及开挖优化[J]. 隧道建设,2015,35(1):83-88.(WANG Yue,SHI Jiyao. Early deformation analysis and excavation optimization of junction sections of large cross-section loess tunnels[J]. Tunnel Construction,2015,35(1):83-88.(in Chinese))
|
[16] |
HSIAO F Y,WANG C,CHERN J. Numerical simulation of rock deformation for support design in tunnel intersection area[J]. Tunnelling and Underground Space Technology,2009,24(1):14-21.
|
[7] |
李 磊,谭忠盛. 挤压性破碎软岩隧道大变形特征及机制研究[J]. 岩石力学与工程学报,2018,37(增1):3 593-3 603.(LI Lei,TAN Zhongsheng. Characteristic and mechanism research for large deformation problem in squeezing-shattered soft rock tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2018,37(Supp.1):3 593-3 603.(in Chinese))
|
[17] |
梁桥欣. 特长公路隧道空间交叉结构及地下洞群施工力学特征研究[硕士学位论文][D]. 成都:西南交通大学,2013.(LIANG Qiaoxin. Study on the construction mechanics characteristics of space cross structure and underground tunnel group of long highway tunnels[M. S. Thesis][D]. Chengdu:Southwest Jiaotong University,2013.(in Chinese))
|
[19] |
靳晓光,李晓红. 深埋交叉隧道动态施工力学行为研究[J]. 重庆建筑大学学报,2008,30(2):32-36.(JIN Xiaoguang,LI Xiaohong. Dynamic construction mechanical behavior of a deeply-buried intersection tunnel[J]. Journal of Chongqing Jianzhu University,2008,30(2):32-36.(in Chinese))
|
[22] |
汪勤民,何国辉,汪 飞. 隧道复杂结构受力变形特征及加固效果研究[J]. 公路,2023,68(8):406-410.(WANG Qinmin,HE Guohui,WANG Fei. Study on mechanical deformation characteristics and reinforcement effect of complex tunnel structures[J]. Highway,2023,68(8):406-410.(in Chinese))
|
[24] |
张志强,许 江,万晓燕. 公路长隧道与横通道空间斜交结构施工力学研究[J]. 岩土力学,2007,28(2):247-252.(ZHANG Zhiqiang,XU Jiang,WAN Xiaoyan. Study on tunnel construction mechanics at intersection of horizontal adit and major tunnel in highway[J]. Rock and Soil Mechanics,2007,28(2):247-252.(in Chinese))
|
[27] |
罗彦斌,陈建勋,王梦恕. 隧道斜交横通道施工对主隧道衬砌结构的影响研究[J]. 岩石力学与工程学报,2010,29(增2):3 792- 3 798.(LUO Yanbin,CHEN Jianxun,WANG Mengshu. Study of influence of skew horizontal adit tunnel construction on main tunnel lining structure[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(Supp.2):3 792-3 798.(in Chinese))
|
[29] |
杨林霖,杨文波,田浩晟,等. 考虑围岩短期蠕变效应的隧道双层初期支护变形控制研究[J]. 岩石力学与工程学报,2023,42(7): 1 731-1 742.(YANG Linlin,YANG Wenbo,TIAN haosheng,et al. Study on deformation control of double-layered initial support in tunnels considering short-term creep effects of surrounding rock[J]. Chinese Journal of Rock Mechanics and Engineering,2023,42(7):1 731-1 742.(in Chinese))
|
[5] |
BARLA G. Squeezing rocks in tunnels[J]. International Society for Rock Mechanics News Journal,1995,2(3/4):44-49.
|
[15] |
游步上,陈尧中. 隧道交叉段变形机制之探讨[J]. 隧道建设,2007,27(增2):109-113.(YOU Bushang,CHEN Yaozhong. The deformation mechanism of tunnel intersection[J]. Tunnel Construction,2007,27(Supp.2):109-113.(in Chinese))
|
[25] |
张志强,苏江川,姜元俊. 马王槽主隧道与横通道交叉部施工受力特征数值模拟分析[J]. 公路交通科技,2007,24(1):109-113. (ZHANG Zhiqiang,SU Jiangchuan,JIANG Yuanjun. Three-dimensional fem simulation analysis of construction of intersection of transverse gallery and main tunnel[J]. Journal of Highway and Transportation Research and Development,2007,24(1):109-113.(in Chinese))
|
[3] |
杜广印,武 军,夏 涵,等. 黄土十字交叉隧道开挖下支护结构变形特性研究[J]. 工程地质学报,2022,30(2):475-483.(DU Guangyin,WU Jun,XIA Han,et al. Study on deformation characteristics of supporting structure under loess criss-cross tunnel excavation[J]. Journal of Engineering Geology,2022,30(2):475-483.(in Chinese))
|
[13] |
彭 波. 大跨隧道交叉口开挖方法及力学行为研究[硕士学位论文][D]. 重庆:重庆交通大学,2013.(PENG Bo. Research on excavation method and mechanical behavior of large span tunnel intersection[M. S. Thesis][D]. Chongqing:Chongqing Jiaotong University,2013.(in Chinese))
|
[23] |
LI Y,JIN X,LV Z,et al. Deformation and mechanical characteristics of tunnel lining in tunnel inter-section between subway station tunnel and construction tunnel[J]. Tunnelling Underground Space Technology Incorporating Trenchless Technology Research,2016,56(Jun.):22-33.
|
[10] |
胡春停,刘艳仓. 三联隧道软弱围岩条件下横洞与正洞交岔段施工技术[J]. 隧道建设,2012,32(2):218-222.(HU Chunting,LIU Yancang. Construction technology for junction section between horizontal adit and main tunnel in soft ground:Case study on Sanlian tunnel[J]. Tunnel Construction,2012,32(2):218-222.(in Chinese))
|
[20] |
赵 文,王 鑫,柏 谦. 原位扩建既有隧道竖井与主洞交叉段施工力学[J]. 东北大学学报:自然科学版,2021,42(5):713-719. (ZHAO Wen,WANG Xin,BAI Qian. Construction mechanics of in-situ expansion of the intersection of existing tunnel shaft and main tunnel[J]. Journal of Northeastern University:Natural Science,2021,42(5):713-719.(in Chinese))
|
[8] |
何满潮,袁 越,王晓雷,等. 新疆中生代复合型软岩大变形控制技术及其应用[J]. 岩石力学与工程学报,2013,32(3):433-441. (HE Manchao,YUAN Yue,WANG Xiaolei,et al. Control technology for large deformation of mesozoic compound soft rock in Xinjiang and its application[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(3):433-441.(in Chinese))
|
[18] |
张宪鑫. 深埋交叉隧道开挖变形行为及衬砌应力研究[硕士学位论文][D]. 重庆:重庆大学,2007.(ZHANG Xianxin. Study on deformation behavior and lining stress of deep buried cross tunnel excavation[M. S. Thesis][D]. Chongqing:Chongqing University,2007.(in Chinese))
|
[28] |
中华人民共和国行业标准编写组. TB 10003—2016 铁路隧道设计规范[S]. 北京:中国铁道出版社,2017.(The Professional Standards Compilation Group of the People?s Republic of China. TB 10003—2016 Code for design of railway tunnel[S]. Beijing:China Railway Press,2017.(in Chinese))
|
[26] |
石继训. 长大山岭隧道斜井与正洞交叉段数值模拟及分析[硕士学位论文][D]. 重庆:重庆交通大学,2014.(SHI Jixun. Numerical simulation and analysis of cross section between inclined shaft and normal tunnel in Long Mountain tunnel[M. S. Thesis][D]. Chongqing:Chongqing Jiaotong University,2014.(in Chinese))
|