Abstract Based on an engineering case,the mechanism of the pre-support system applied in treatment for the collapse of shallow-buried tunnel is discussed. Moreover,the internal force of the second lining is analyzed by means of FEM and the procedure to treat the collapse of shallow-buried tunnel is given. Some conclusions can be drawn based on the treatment effectiveness:(1) shed-pipe grouting technology is an effective assistant construction method,and the mechanical effect is significant;(2) the deformation of the tunnel bedding wall rock often has some abruptness;and (3) the second lining should be constructed in time so as to form the closed-end supporting system earlier,which can accelerate the stabilization process of the deformation of surrounding rock and prevent the excessive deformation of surrounding rock and tunnel collapse.
|
|
Received: 31 May 2006
|
|
|
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|