| STUDY ON SURROUNDING ROCK CONSTRUCTION OPTIMIZATION OF KUIGANG TUNNEL BASED ON FUNCTION ANALYSIS SYSTEM TECHNIQUE |
|
|
|
|
Abstract The technical-economic view is first adopted to identify the best construction method according to project management objective under certain condition based on value engineering(VE) and function analysis system technique(FAST). Then an appraising model is set up,with expert knowledge and group decision techniques. Finally,the Kuigang tunnel is discussed,which shows that this model is effective for construction scheme optimization and has the value for further study.
|
|
Received: 27 May 2006
|
|
|
|
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|