| IN-SITU STRESS MEASUREMENT IN ROCKMASS OF ERLANG MOUNTAIN HIGHWAY TUNNEL |
|
|
|
|
Abstract Through the in-situ stress measurement by borehole overcoring technique and Kaiser effect method,it is found out that the general space stress state of rockmass in the famous,deeply-lying and especially long Erlang mountain highway tunnel,belongs to the potential strike-slip type. The measured in-situ stresses in the middle part of the tunnel are generally very large with the major principal stress of 35.3 MPa. So during the construction process,the problems of high in-situ stress and rockburst have to be taken into account.
|
|
Received: 13 June 2001
|
|
|
|