| APPLICATION OF CEMENT-FLYASH-GRAVEL(CFG)PILE TO THE GROUND TREATMENT OF BOX BEAM PREFABRICATE FACTORY OF SHOUZHOU—NANTONG BRIDGE TENDER B2 |
|
|
|
|
Abstract The application of cement-flyash-gravel pile (CFG) pile in pre-manufacturing plant ground reinforcement in Sutong bridge is introduced,which covers the project survey,geological and the landform characteristic,the ground processing method,the ground design,the construction,and the examination and so on. According to the composite ground load experiment,the examination results,have carried on an objective evaluation to its reinforcement effects.
|
|
Received: 02 February 2005
|
|
|
|
|
|
|