HIGH PRESSURE CONSOLIDATION GROUTING FOR TUNNEL SECTIONS WITH UNFAVORABLE GEOLOGY CONDITION |
|
|
|
|
Abstract The diversion tunnel of Tianshengqiao-2 hydropower station is characterized with large length, considerable embedded depth,high outer-water pressure,very complicated geologic and hydrogeologic conditions. During construction,the unfavorable tunnel sections with fault and fragment,karst caves and blind rivers are strengthened with either the high-pressure consolidation grouting or installing bolts in grouting holes. Consequently,very good results and construction experiences are gained.
|
|