|
|
|
| ENGINEERING PRACTICE FOR SEEPAGE TREATMENT OF A HAN DYNASTY TOMB BY COMPREHENSIVE METHOD |
| Liu Ling |
| (Northwest Research Institute of China Railway Engineering Corporation, Lanzhou 730000 China) |
|
|
|
Abstract The cause of coffin chamber seepage in a Han dymasty bomb is analysed,and comprehensive method is adopted to track and determinate the seepage path. Grouting,filling,draining and packing are comprehensively used to solve the seepage problem in engineering practice.
|
|
Received: 01 March 2003
|
|
|
|
|
|
|