[1] 徐则民,黄润秋. 深埋特长隧道及其施工地质灾害[M]. 成都:西南交通大学出版社,2000:1–2.(XU Zemin,HUANG Runqiu. Deep buried and extra-long tunnel and geological hazards during construction[M]. Chengdu:Southwest Jiaotong University Press,2000:1–2.(in Chinese))
[2] 王梦恕. 对岩溶地区隧道施工水文地质超前预报的意见[J]. 铁道勘察,2004,(1):7–10.(WANG Mengshu. Hydrologic and geological forecast of tunnel construction in the kaster district[J] Railway Investigation and Surveying,2004,(1):7–10.(in Chinese))
[3] 王青海,李晓红,夏彬伟,等. 超前预测预报在笔架山隧道施工中的应用[J]. 岩土力学,2005,26(6):951–954.(WANG Qinghai,LI Xiaohong,XIA Binwei,et al. Application of advanced prediction and forecast in Bijiashan tunnel construction[J]. Rock and Soil Mechanics,2005,26(6):951–954.(in Chinese))
[4] 邓尤东. 超前地质预报在乌鞘岭特长隧道中的应用[J]. 岩石力学与工程学报,2004,23(增2):5 140–5 146.(DENG Youdong. Application of geologic forecast in Wuqiaoling long tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(Supp.2):5 140–5 146.(in Chinese))
[5] 马 亢,徐 进,张志龙,等. 雪峰山公路隧道的超前预测预报研究[J]. 岩土力学,2009,30(5):1 381–1 386.(MA Kang,XU Jin,ZHANG Zhilong,et al. Research on advanced prediction and forecast of Xuefeng mountain highway tunnel[J]. Rock and Soil Mechanics,2009,30(5):1 381–1 386.(in Chinese))
[6] 刘秀峰,马长青. 综合超前地质预报在小坪子隧洞中的运用研究[J]. 铁道工程学报,2007,(11):5–8.(LIU Xiufeng,MA Changqing. Application research on the integrated geological forecast in advance in construction of Xiaopingzi tunnel[J]. Journal of Railway Engineering Society,2007,(11):5–8.(in Chinese))
[7] 肖书安,吴世林. 复杂地质条件下的隧道地质超前探测技术[J]. 工程地球物理学报,2004,1(2):159–165.(XIAO Shu¢an,WU Shilin. Geological prediction technique for tunnel construction under complex geological conditions[J]. Chinese Journal of Engineering Geophysics,2004,1(2):159–165.(in Chinese))
[8] 王 鹰,陈 强,魏有仪,等. 红外探测技术在圆梁山隧道突水预报中的应用[J]. 岩石力学与工程学报,2003,22(5):855–857.(WANG Ying,CHEN Qiang,WEI Youyi,et al. Application of infrared acquisition technology in prediction of water gushing in Yuanliangshan tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(5):855–857.(in Chinese))
[9] 李术才,李树忱,张庆松,等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报,2007,26(2):217–225.(LI Shucai,LI Shuchen,ZHANG Qingsong,et al. Forecast of karst-fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217–225.(in Chinese))
[10] 王锦山,王 力,曹志刚,等. 厦门海底隧道综合超前地质预报实践[J]. 岩石力学与工程学报,2007,26(11):2 309–2 317.(WANG Jinshan,WANG Li,CAO Zhigang,et al. Practice on synthetic geological prediction ahead of construction of Xiamen subsea tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2 309–2 317.(in Chinese))
[11] 曲海锋,刘志刚,朱合华. 隧道信息化施工中综合超前地质预报技术[J]. 岩石力学与工程学报,2006,25(6):1 246–1 251.(QU Haifeng,LIU Zhigang,ZHU Hehua. Technique of synthetic geologic prediction ahead in tunnel informational construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1 246–1 251.(in Chinese))
[12] 李术才,薛翊国,张庆松,等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报,2008,27(7):1 297–1 307.(LI Shucai,XUE Yiguo,ZHANG Qingsong,et al. Key technology study of comprehensive prediction and early-warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 297–1 307.(in Chinese))
[13] 刘志刚,赵 勇. 隧道隧洞施工地质技术[M]. 北京:中国铁道出版社,2001.(LIU Zhigang,ZHAO Yong. Geological technique for tunnel construction[M]. Beijing:China Railway Publishing House,2001.(in Chinese))
[14] 李大心. 探地雷达方法与应用[M]. 北京:地质出版社,1994.(LI Daxin. Ground penetrating radar method and its application[M]. Beijing:Geological Publishing House,1994.(in Chinese))
[15] BROOKS J W. Application of GPR technology to humanitarian demising operations in Cambodia:some lessons learned[R]. Huntsville:Brooks Enterprises International,Inc.,1996:1–9.
[16] CREMER F,JONG W D,SCHUTTE K. Fushion of polarimetric infrared features and GPR features for landmine detection[C]// Proceedings of the 2nd International Workshop on Advanced Ground Penetrating Radar(IWAGPR). Delft,Netherlands:[s. n.],2003:1–6.
[17] 白 冰,周 健. 探地雷达测试技术发展概况及其应用现状[J]. 岩石力学与工程学报,2000,20(4):527–531.(BAI Bing,ZHOU Jian. Advance and applications of ground penetrating radar measuring technology[J]. Chinese Journal of Rock Mechanics and Engineering,2000,20(4):527–531.(in Chinese)
[18] 刘传孝. 地质雷达探测关键岩层分析断层参数的研究与应用[J]. 煤炭科学技术,2005,33(2):21–23.(LIU Chuanxiao. Research and application of geological radar to predict key strata and to analyze fault parameters[J]. Coal Science and Technology,2005,33(2):21–23.(in Chinese))
[19] 钟世航,孙宏志,王 荣,等. 隧道掌子面前方地质预报的现状及发展之路[J]. 工程地球物理学报,2007,4(3):180–185.(ZHONG Shihang,SUN Hongzhi,WANG Rong,et al. The present situation of the geological prediction in front of tunnel face and its development[J]. Chinese Journal of Engineering Geophysics,2007,4(3):180–185.(in Chinese))