[1] 陈厚群,徐泽平,李 敏. 汶川大地震和大坝抗震安全[J]. 水利学报,2008,39(10):1 158–1 167.(CHEN Houqun,XU Zeping,LI Min. Wenchuan earthquake and seismic safety of large dams[J]. Journal of Hydraulic Engineering,2008,39(10):1 158–1 167.(in Chinese))
[2] 黄润秋,李为乐. “5.12”汶川大地震触发地质灾害的发育分布规律研究[J]. 岩石力学与工程学报,2008,27(12):2 585–2 592. (HUANG Runqiu,LI Weile. Research on development and distribution rules of geohazards induced by Wenchuan earthquake on 12th May,2008[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(12):2 585–2 592.(in Chinese))
[3] 谢和平,邓建辉,台佳佳,等. 汶川大地震灾害与灾区重建的岩土工程问题[J]. 岩石力学与工程学报,2008,27(9):1 781–1 791.(XIE Heping,DENG Jianhui,TAI Jiajia,et al. Wenchuan large earthquake and post-earthquake reconstruction-related geotechnical problems[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(9): 1 781–1 791.(in Chinese))
[4] 郑声安,王仁坤,章建跃,等. 汶川地震对岷江上游水电工程的影响分析[J]. 水力发电,2008,34(11):5–9.(ZHENG Sheng¢an,WANG Renkun,ZHANG Jianyue,et al. Influence analysis of Wenchuan earthquake on the hydropower projects in the upstream of the Minjiang River[J]. Water Power,2008,34(11):5–9.(in Chinese))
[5] 陈生水,霍家平,章为民. “5.12”汶川地震对紫坪铺混凝土面板坝的影响及原因分析[J]. 岩土工程学报,2008,30(6):795–801.(CHEN Shengshui,HUO Jiaping,ZHANG Weimin. Analysis of effects of “5.12” Wenchuan earthquake on Zipingpu concrete face rockfill dam[J]. Chinese Journal of Geotechnical Engineering,2008,30(6):795–801.(in Chinese))
[6] 汪家林,徐湘涛,汪贤良,等. 汶川8.0级地震对紫坪铺左岸坝前堆积体稳定性影响的监测分析[J]. 岩石力学与工程学报,2009,28(6):1 279–1 287.(WANG Jialin,XU Xiangtao,WANG Xianliang,et al. Monitoring analysis of influence of Wenchuan 8.0 earthquake on talus slope stability at left bank in front dam of Zipingpu hydraulic project[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(6):1 279–1 287.(in Chinese))
[7] 熊 堃,何蕴龙,张艳锋. “5.12”汶川大地震时冶勒大坝实测动力反应[J]. 岩土工程学报,2008,30(10):1 575–1 580.(XIONG Kun,HE Yunlong,ZHANG Yanfeng. Recorded seismic response of Yele dam during “5.12” Wenchuan earthquake[J]. Chinese Journal of Geotechnical Engineering,2008,30(10):1 575–1 580.(in Chinese))
[8] 何蕴龙,刘俊林,熊 堃. 汶川地震冶勒大坝动力响应规律分析[J]. 四川大学学报(工程科学版),2009,41(3):157–164.(HE Yunlong,LIU Junlin,XIONG Kun. Seismic response of Yele dam during Wenchuan earthquake[J]. Journal of Sichuan University(Engineering Science),2009,41(3):157–164.(in Chinese))
[9] 杨宝全,张 林,王 华. 汶川地震震损水库典型土石坝除险加固分析[J]. 四川大学学报(工程科学版),2009,41(3):146–150.(YANG Baoquan,ZHANG Lin,WANG Hua. Analysis on consolidation of a typical earth-rockfill dams which damaged in Wenchuan earthquake[J]. Journal of Sichuan University(Engineering Science),2009,41(3):146–150.(in Chinese))
[10] 林 鹏,王仁坤,李庆斌,等. 汶川8.0级地震对典型高坝结构安全的影响分析[J]. 岩石力学与工程学报,2009,28(6):1 261–1 269. (LIN Peng,WANG Renkun,LI Qingbin,et al. Effect of analysis of structural safety of typical large dams in Wenchuan 8.0 earthquake[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(6): 1 261–1 269.(in Chinese))
[11] 李海波,马行东,李俊如,等. 地震荷载作用下地下岩体洞室位移特征的影响因素分析[J]. 岩土工程学报,2006,28(3):358–362.(LI Haibo,MA Xingdong,LI Junru,et al. Study on influence factors of rock cavern displacement under earthquake[J]. Chinese Journal of Geotechnical Engineering,2006,28(3):358–362.(in Chinese))
[12] 卢 滔,李小军,李亚琦. 水工地下厂房岩体洞室地震反应问题分析[J]. 中国地震,2008,24(1):77–85.(LU Tao,LI Xiaojun,LI Yaqi. Discussion on seismic response numerical study of large scale underground rock cavern for hydropower station[J]. Earthquake Research in China,2008,24(1):77–85.(in Chinese))
[13] 隋 斌,朱维申,李晓静. 地震荷载作用下大型地下洞室群的动态响应模拟[J]. 岩土工程学报,2008,30(12):1 877–1 882.(SUI Bin,ZHU Weishen,LI Xiaojing. Simulation on dynamic response of large underground opening complex under seismic loads[J]. Chinese Journal of Geotechnical Engineering,2008,30(12):1 877–1 882.(in Chinese))
[14] 黄 胜,陈卫忠,杨建平,等. 地下工程地震动力响应及抗震研究[J]. 岩石力学与工程学报,2009,28(3):483–490.(HUANG Sheng,CHEN Weizhong,YANG Jianping,et al. Research on earthquake-induced dynamic responses and aseismic measures for underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(3):483–490.(in Chinese))
[15] 王如宾,徐卫亚,石 崇,等. 高地震烈度区岩体地下洞室动力响应分析[J]. 岩石力学与工程学报,2009,28(3):568–575.(WANG Rubin,XU Weiya,SHI Chong,et al. Dynamic response analysis of rock underground powerhouse in highly seismic region[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(3):568–575.(in Chinese))
[16] 中华人民共和国国家标准编写组. GB18306–2001 中国地震动参数区划图[S]. 北京:中国标准出版社,2001.(The National Standards Compilation Group of People¢s Republic of China. GB18306–2001 Seismic ground motion parameter zonation map of China[S]. Beijing:Standards Press of China,2001.(in Chinese))
[17] 清华大学,西南交通大学,重庆大学,等. 汶川地震建筑震害分析及设计对策[M]. 北京:中国建筑工业出版社,2009.(Tsinghua University,Southwest Jiaotong University,Chongqing University,et al. Seismic damage analysis and design strategy for structures in Wenchuan earthquake[M]. Beijing:China Architecture and Building Press,2009.(in Chinese))
[18] 胡聿贤. 地震工程学[M]. 北京:地震出版社,2006.(HU Yuxian. Earthquake engineering[M]. Beijing:Earthquake Press,2006.(in Chinese))
[19] LI X J,ZHOU Z H,Huang M,et al. Preliminary analysis of strong-motion recordings from the magnitude 8.0 Wenchuan,China,earthquake of 12th May 2008[J]. Seismological Research Letters,2008,79(6):844–854.
[20] 中华人民共和国国家标准编写组. GB 17741–2005工程场地地震安全性评价技术规范[S]. 北京:中国标准出版社,2005.(The National Standards Compilation Group of People¢s Republic of China. GB 17741–2005 Evaluation of seismic safety for engineering sites[S]. Beijing:Standards Press of China,2005.(in Chinese))
[21] KUHLEMEYER R L,LYSMER J. Finite element method accuracy for wave propagation problems[J]. Journal of the Soil Mechanics and Foundations Division,1973,99(5):421-427.
[22] 陈育民,徐鼎平. FLAC/FLAC3D基础与工程实例[M]. 北京:中国水利水电出版社,2009.(CHEN Yumin,XU Dingping. Basis and engineering application of FLAC/FLAC3D[M]. Beijing:China Water Power Press,2009. (in Chinese))
[23] 中华人民共和国行业标准编写组. DL 5073–2000水工建筑物抗震设计规范[S]. 北京:中国电力出版社,2006.(The Professional Standards Compilation Group of People¢s Republic of China. DL 5073–2000 Specifications for seismic design of hydraulic structures[S]. Beijing:China Electric Power Press,2006.(in Chinese))
[24] Itasca Consulting Group,Inc.. FLAC3D user¢s manual(version 3.0)[R]. Minneapolis:Itasca Consulting Group,Inc.,2005.