|
|
|
| CHARACTERISTICS AND ANALYSIS OF PORE WATER PRESSURES IN GRAVELLY SOIL COREWALL OF PUBUGOU ROCKFILL DAM DURING CONSTRUCTION PERIOD |
| (State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China) |
|
|
|
|
Abstract The growth and dissipation process of pore water pressure in rockfill dams during construction period is very complex. Based on the monitoring data of Pubugou corewall,the characteristics and forming mechanism of pore water pressure during the construction period are analyzed. In addition,the comparative analyses between Pubugou dam,Xiaolangdi dam and Lubuge dam are made. The results show that:(1) The growth and dissipation modes of pore water pressure in Pubugou corewall during the construction period contain four modes which are delay-response mode,immediate-response mode I,immediate-response mode II and no-response mode. (2) The immediate-response mode II is the main growth and dissipation mode. (3) The essence of delayed response of piezometers is the process that the soil around the piezometers changes from nonsaturated state to saturated state. (4) The permeability coefficient of soil is the determinant factor of the delay response of piezometers. (5) The immediate-response mode I is the result of the more high water content in local corewall;so,in order to avoid the immediate-response mode I,the water content of corewall should keep uniformity during the construction period. (6) Filling rate has significant effects on pore water pressure of the delay-response mode and immediate-response mode II;and the effect on the immediate-response mode I is not obvious. The heterogeneity of gravelly soil should be paid high attention during the design and research stages of rockfill dams of gravelly soil corewall.
|
|
Received: 24 August 2010
|
|
|
|
| [1] 中华人民共和国行业标准编写组. DL/T 5395—2007碾压式土石坝设计规范[S]. 北京:中国电力出版社,2008.(The Professional Standards Compilation Group of People′s Republic of China. DL/T 5395—2007 Design specification for rolled earth-rock fill dams[S]. Beijing:China Electric Power Press,2008.(in Chinese))
[2] 王柏乐. 中国当代土石坝[M]. 北京:中国水利水电出版社,2004:1–2.(WANG Baile. Chinese contemporary earth and rockfill dam[M]. Beijing:China Water Power Press,2004:1–2.(in Chinese))
[3] 屈智炯. 宽级配砾质土在土石坝防渗体中的应用及渗流控制的进展[J]. 水电站设计,1992,8(3):46–53.(QU Zhijiong. Application of wide grading gravelly soil in the embankment dam seepage and progress of seepage control[J]. Design of Hydroelectric Power Station,1992,8(3):46–53.(in Chinese))
[4] 陈祖煜. 土质边坡分析的原理与方法[M]. 北京:中国水利水电出版社,2003:163.(CHEN Zuyu. Principles and methods of soil slope analysis[M]. Beijing:China Water Power Press,2003:163.(in Chinese))
[5] 马 兰. 超高土石坝固结过程初探[J]. 国防交通工程与技术,2005,(2):22–25.(MA Lan. An elementary discussion for consolidating procedure of super-high embankment dam[J]. Traffic Engineering and Technology for National Defence,2005,(2):22–25.(in Chinese))
[6] 陈立宏,陈祖煜,张进平,等. 小浪底大坝心墙中高孔隙水压力的研究[J]. 水利学报,2005,36(2):219–223.(CHEN Lihong,CHEN Zuyu,ZHANG Jinping,et al. Study on high pore pressure in clay core wall of earth dam in Xiaolangdi Project[J]. Journal of Hydraulic Engineering,2005,36(2):219–223.(in Chinese))
[7] 陈继平,曹林曦,刘明华,等. 砾石土心墙堆石坝施工期孔隙水压力分析[J]. 岩土力学,2008,29(增):176–180.(CHEN Juping,CAO Linxi,LIU Minghua,et al. Pore water pressure analysis during construction of gravelly soil corewall rockfill dam[J]. Rock and Soil Mechanics,2008,29(Supp.):176–180.(in Chinese))
[8] 中国水电工程顾问集团成都勘测设计研究院. 四川省大渡河瀑布沟水电站枢纽工程蓄水阶段验收设计报告[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2009.(Chengdu Hydropower Investigation Design Institute of HydroChina. Design report of Pubugou hydropower project on Dadu river in Sichuan Province on the stage acceptance of water[R]. Chengdu:Chengdu Hydropower Investigation Design Institute of HydroChina,2009.(in Chinese))
[9] 中国水电工程顾问集团成都勘测设计研究院. 四川省大渡河瀑布沟水电站初步设计报告安全监测篇[R]. 成都:中国水电工程顾问集团成都勘测设计研究院,2001.(Chengdu Hydropower Investigation Design Institute of HydroChina. Monitoring design report of Pubugou hydropower project on Dadu River in Sichuan Province[R]. Chengdu:Chengdu Hydropower Investigation Design Institute of HydroChina,2001.(in Chinese))
[10] 南京水利科学研究院勘测设计院,常州金土木工程仪器有限公司. 岩土工程安全监测手册[M]. 2版. 北京:中国水利水电出版社,2008:236–238.(Nanjing Hydraulic Research Institute,Changzhou Golden Civil Engineering Instruments Co.,Ltd. Monitoring of geotechnical engineering manual[M]. 2nd ed. Beijing:China Water Power Press,2008:236–238.(in Chinese))
[11] 涂扬举,王文涛,陈向浩,等. 瀑布沟砾石土心墙堆石坝施工期监测分析[J]. 水力发电,2010,36(6):71–74.(TU Yangju,WANG Wentao,CHEN Xianghao,et al. Monitoring and analysis of pubugou gravelly soil corewall rockfill dam during construction period[J]. Water Power,2010,36(6):71–74.(in Chinese))
[12] 郦能惠,蔡 飞. 鲁布革堆石坝的统计分析和反分析[R]. 南京:南京水利科学研究院,1991.(LI Nenghui,CAI Fei. The statistical analysis and back analysis of Lubuge rockfill dam[R]. Nanjing:Nanjing Hydraulic Research Institute,1991.(in Chinese))
[13] 中国水利水电科学研究院. 高土石坝心墙的高孔隙水压力[R]. 北京:中国水利水电科学研究院,2009.(China Institute of Water Resources and Hydropower Research. High pore pressure of high embankment dam[R]. Beijing:China Institute of Water Resources and Hydropower Research,2009.(in Chinese))
[14] 张启岳,熊国文. 鲁布革坝初次正常高水位情况下原型观测资料的整理分析[R]. 南京:南京水利科学研究院,1992.(ZHANG Qiyue,XIONG Guowen. Analysis of monitoring data of Lubuge dam under the initial normal high water level[R]. Nanjing:Nanjing Hydraulic Research Institute,1992.(in Chinese))
[15] 张启岳,熊国文. 鲁布革坝的原型观测(I)[J]. 水利水运科学研究,1994,9(3):212–230.(ZHANG Qiyue,XIONG Guowen. Prototype observation of Lubuge dam(I)[J]. Hydro-Science and Engineering,1994,9(3):212–230.(in Chinese))
[16] 张启岳,熊国文. 鲁布革坝的原型观测(II)[J]. 水利水运科学研究,1994,9(4):319–333.(ZHANG Qiyue,XIONG Guowen. Prototype observation of Lubuge dam(II)[J]. Hydro-Science and Engineering,1994,9(4):319–333.(in Chinese)) |
|
|
|