| STUDY OF ADVANCED DETECTION FOR TUNNEL WATER-BEARING GEOLOGICAL STRUCTURES WITH INDUCED POLARIZATION METHOD |
| LI Shucai,LIU Bin,LI Shuchen,ZHANG Qingsong,NIE Lichao,LI Liping,XU Zhenhao,ZHONG Shihang |
| (Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,Shandong 250061,China) |
|
|
|
|
Abstract The water inrush hazards have become one of the bottleneck problems that constrain the construction of underground engineering such as tunnels. The advanced detection of the water-bearing geological structures especially estimation of the water volume in tunnel construction period has become an important scientific and engineering problem to be studied and solved urgently. For the above problems,the solving method with the induced polarization(IP) method as the guide is proposed. The advanced geological prediction with IP method in tunnel faces with a lot of new problems to be studied and solved urgently in contrast with shallow exploration. The special IP instrument for tunnel advanced detection is developed. The thought for solving the problem of water-body location with apparent resistivity is presented;and the three-dimensional(3D) tomography method of water-bearing structures advanced detection based on 3D resistivity inversion method and its computation scheme is proposed. The basic problems of tunnel advanced detection are solved(e.g. solution of point source field in 3D whole space,3D measurement mode,recognition and removal of the measurement disturbance,inversion target region). The feasibility and effectiveness of 3D tomography for water-bearing structures has been proved by massive inversion examples. For the problem of water volume estimation,the method based on half-decay time difference of two-current induced polarization is put forward. It is found that the relation between difference of half-decay time and water volume is linear positive correlation by physical model test. And this linear positive correlation lays a solid foundation for water volume prediction of water-bearing structures in practical engineering. In the end,advanced detection technical system with IP method for tunnel water-bearing geological structures is formed. And this technical system is introduced into geological forecast work in tunnel engineering. The prediction results are basically identical with the practical excavation results. Practical application demonstrates that the problem of advanced detection for tunnel water-bearing structures especially the water volume estimation is solved effectively with prediction technique of IP method;and it has good application prospect and popularization value which extends the function of advanced geological prediction technique.
|
|
Received: 19 May 2010
|
|
|
|
| [1] 李术才,李树忱,张庆松,等. 岩溶裂隙水与不良地质情况超前预报研究[J]. 岩石力学与工程学报,2007,26(2):217–225.(LI Shucai,LI Shuchen,ZHANG Qingsong,et al. Forecast of karst- fractured groundwater and defective geological conditions[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217–225.(in Chinese))
[2] 李术才,薛翊国,张庆松,等. 高风险岩溶地区隧道施工地质灾害综合预报预警关键技术研究[J]. 岩石力学与工程学报,2008,27(7):1 297–1 307.(LI Shucai,XUE Yiguo,ZHANG Qingsong,et al. Key technology study on comprehensive prediction and early- warning of geological hazards during tunnel construction in high-risk karst areas[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(7):1 297–1 307.(in Chinese))
[3] 王梦恕. 对岩溶地区隧道施工水文地质超前预报的意见[J]. 铁道勘查,2004,(1):7–9.(WANG Mengshu. Hydrologic and geological forecast of tunnel construction in the karst district[J]. Railroad Survey,2004,(1):7–9.(in Chinese))
[4] 王 华,吴 光,冯 涛,等. 渝怀线圆梁山隧道超前地质钻探预报技术应用研究[J]. 铁道建筑,2007,(2):36–38.(WANG Hua,WU Guang,FENG Tao,et al. Application and study on the advance drilling geological prediction in Yuanliangshan Tunnel[J]. Railway Engineering,2007,(2):36–38.(in Chinese))
[5] 刘志刚,刘秀峰. TSP(隧道地震勘探)在隧道隧洞超前预报中的应用与发展[J]. 岩石力学与工程学报,2003,22(8):1 399–1 402.(LIU Zhigang,LIU Xiufeng. TSP application and development in tunnel advanced forecast[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(8):1 399–1 402.(in Chinese))
[6] 刘 斌,李术才,李树忱,等. 复信号分析技术在地质雷达预报岩溶裂隙水中的应用研究[J]. 岩土力学,2009,30(7):2 191–2 196. (LIU Bin,LI Shucai,LI Shuchen,et al. Application and study on complex signal analysis in the prediction of karst-fractured ground water with GPR[J]. Rock and Soil Mechanics,2009,30(7):2 191–2 196.(in Chinese))
[7] 曲海峰,刘志刚,朱合华. 隧道信息化施工中综合地质预报技术[J]. 岩石力学与工程学报,2006,25(6):1 246–1 251.(QU Haifeng,LIU Zhigang,ZHU Hehua. Technique of synthetic geologic prediction ahead in tunnel informational construction[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1 246–1 251.(in Chinese))
[8] 王锦山,王 力,曹志刚,等. 厦门海底隧道综合超前地质预报实践[J]. 岩石力学与工程学报,2007,26(11):2 309–2 317.(WANG Jinshan,WANG Li,CAO Zhigang,et al. Practice on synthetic geological prediction ahead of construction of Xiamen subsea tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(11):2 309– 2 317.(in Chinese))
[9] 李天斌,孟陆波,朱 劲,等. 隧道超前地质预报综合分析方法[J]. 岩石力学与工程学报,2009,28(12):2 429–2 436.(LI Tianbin,MENG Lubo,ZHU Jing,et al. Comprehensive analysis method for advanced forecast of geology in tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(12):2 429–2 436.(in Chinese))
[10] 岳建华,刘树才. 矿井直流电法勘探[M]. 徐州:中国矿业大学出版社,2000:5–15.(YUE Jianhua,LIU Shucai. Underground mine electrical prospecting[M]. Xuzhou:China University of Mining and Technlogy Press,2000:5–15. (in Chinese))
[11] 岳建华,李志聃. 矿井直流电法勘探中的巷道影响[J]. 煤炭学报,1999,24(1):7–10.(YUE Jianhua,LI Zhidan. Roadway influence on electrical prospecting in underground mine[J]. Journal of China Coal Society,1999,24(1):7–10.(in Chinese))
[12] 李学军. 煤矿井下定点源梯度法超前探测试验研究[J]. 煤田地质与勘探,1992,20(4):59–62.(LI Xuejun. Study and experiment on heading detecting by fixed electric source gradient method in underground mine[J]. Coal Geology and Exploration,1992,20(4):59–62.(in Chinese))
[13] 程久龙,王玉和,于师建,等. 巷道掘进中电阻率法超前探测原理与应用[J]. 煤田地质与勘探,2000,28(4):60–62.(CHENG Jiulong,WANG Yuhe,YU Shijian,et al. The principle and application of advance surveying in roadway excavation by resistivity method[J]. Coal Geology and Exploration,2000,28(4):60–62.(in Chinese))
[14] 黄俊革,阮百尧,王家林. 坑道直流电阻率法超前探测的快速反演[J]. 地球物理学报,2007,50(2):619–624.(HUANG Junge,RUAN Baiyao,WANG Jialin. The fast inversion for advanced detection using DC resistivity in tunnel[J]. Chinese Journal of Geophysics,2007,50(2):619–624.(in Chinese))
[15] 张平松,刘盛东,曹 煜. 坑道掘进立体电法超前预报技术研究[J]. 中国煤炭地质,2009,21(2):50–53.(ZHANG Pingsong,LIU Shengdong,CAO Yu. A study on stereo electric method advance prediction technology in tunnel excavation[J]. Coal Geology of China,2009,21(2):50–53.(in Chinese))
[16] 强建科,阮百尧,周俊杰. 三维坑道直流聚焦法超前探测的电极组合研究[J]. 地球物理学报,2010,53(3):695–699.(QIANG Jianke,RUAN Baiyao,ZHOU Junjie. Research on the array of electrode of andvanced focus detection with 3D DC resistivity in tunnel[J]. Chinese Journal of Geophysics,2010,53(3):695–699.(in Chinese))
[17] 谢明魁,刘永炳. 地下水探测仪二次时差法[J]. 铁道工程学报,1993,(2):58–60.(XIE Mingkui,LIU Yongbing. Groundwater detector with half-decay time difference method[J]. Journal of Railway Engineering Society,1993,(2):58–60.(in Chinese))
[18] 黄俊革. 三维电阻率/极化率有限元正演模拟与反演成像[博士学位论文][D]. 长沙:中南大学,2003.(HUANG Junge. 3D resistivity/IP modeling and inversion based on FEM[Ph. D. Thesis][D]. Changsha:Central South University,2003.(in Chinese))
[19] 王家映. 地球物理反演理论[M]. 北京:高等教育出版社,2002:1–14.(WANG Jiaying. Inverse theory in geophysics[M]. Beijing:Higher Education Press,2002:1–14.(in Chinese))
[20] 姚 姚. 地球物理反演基本理论与应用方法[M]. 武汉:中国地质大学出版社,2002:51–71.(YAO Yao. Basic theory and applications method in geophysics inversion[M]. Wuhan:China University of Geosciences Press,2002:51–71.(in Chinese))
[21] 吴小平,徐果明. 利用共轭梯度法的电阻率三维反演研究[J]. 地球物理学报,2000,43(3):420–426.(WU Xiaoping,XU Guoming. Study of 3D resistivity inversion using conjugate gradient method[J]. Chinese Journal of Geophysics,2000,43(3):420–426.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|