|
|
|
| ANALYSIS OF SEISMIC REVIEW OF BIKOU ROCKFILL DAM WITH EARTH CORE |
| ZHU Sheng1,2,SHI Gaofeng1,2,ZHOU Jianping3 |
(1. State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering,Hohai University,Nanjing,Jiangsu 210098,China;2. Institute of Hydraulic Structures,Hohai University,Nanjing,Jiangsu 210098,China;
3. HydroChina Corporation,Beijing 100011,China) |
|
|
|
|
Abstract Some damage phenomena appear in Bikou earth core dam after “5.12” Wenchuan earthquake. With the bedrock motions at Wenxian seismic station(062WIX),the input acceleration time-history is obtained from the relationship of free-field peak ground acceleration(PGA) and fault distance in Wenchuan earthquake. The dynamic parameters of dam soils are determined by comparing with the information of large-scaled laboratory triaxial experiments of other projects based on their physical and mechanical characteristics. Based on TSDA program for three-dimensional finite element dynamic analysis,the permanent deformation and the pore water pressure of core dam are close to the recorded data;the maximum acceleration along the dam axis is scaled up in amplitude only by a factor of 2.36 at the dam crest,and the dynamic response of cut-off walls is also weak. Because Bikou dam is located on the hanging wall of fault,and high-frequency componet of the bedrock motions had developed,although the earthquake lasted much longer,the dynamic response is weaker than that under the standard seismic waves synthesized by design response spectrum according to “Specifications for seismic design of hydraulic structures”. From the results of seismic review,it could be found that the core dam built by the modern technology of heavy vibration has good seismic behavior;and the current seismic theories and methods for earth dam are basically feasible.
|
|
Received: 28 December 2009
|
|
|
|
| [1] 中国水电工程顾问集团西北勘测设计研究院. 白龙江碧口水电站工程“5.12”汶川地震震损调查及初步分析报告[R]. 西安:中国水电工程顾问集团西北勘测设计研究院,2008.(HydroChina Xibei Engineering Corporation. Damage investigation and preliminary analysis report of Bikou station on Bailong River during “5.12” Wenchuan earthquake[R]. Xi?an:HydroChina Xibei Engineering Corporation,2008.(in Chinese))
[2] 周建平,杨泽艳,范俊喜,等. 汶川地震灾区大中型水电工程震损调查及主要成果[J]. 水力发电,2009,35(5):1–6.(ZHOU Jianping,YANG Zeyan,FAN Junxi,et al. Seismic damage investigation on large and medium sized hydropower projects in Wenchuan earthquake area[J]. Water Power,2009,35(5):1–6.(in Chinese))
[3] 林 鹏,王仁坤,李庆斌,等. 汶川8.0级地震对典型高坝结构安全的影响分析[J]. 岩石力学与工程学报,2009,28(6):1 261–1 268. (LIN Peng,WANG Renkun,LI Qingbin,et al. Effect analysis of structural safety of typical large dams in Wenchuan 8.0 earthquake[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(6): 1 261–1 268.(in Chinese))
[4] 顾淦臣. 土石坝地震工程[M]. 南京:河海大学出版社,1989.(GU Ganchen. Earthquake engineering for earth-rock dams[M]. Nanjing:Hohai University Press,1989.(in Chinese))
[5] NEWMARK N M. Effects of earthquakes on dams and embankments[J]. Geotechnique,1965,15(2):139–160.
[6] 于海英,王 栋,杨永强,等. 汶川8.0级地震强震动加速度记录的初步分析[J]. 地震工程与工程振动,2009,29(1):1–13.(YU Haiying,WANG Dong,YANG Yongqiang,et al. The preliminary analysis of strong ground motion records from the Ms 8.0 Wenchuan earthquake[J]. Journal of Earthquake Engineering and Engineering Vibration,2009,29(1):1–13.(in Chinese))
[7] 潘如意. 碧口心墙堆石坝震害复核分析[硕士学位论文][D]. 南京:河海大学,2009.(PAN Ruyi. Analysis of the recheck of the earthquake damage of Bikou core rockfill dam[M. S. Thesis][D]. Nanjing:Hohai University,2009.(in Chinese))
[8] 朱 晟,周建波. 粗粒筑坝材料的动力变形特性[J]. 岩土力学,2010,31(5):1 375–1 380.(ZHU Sheng,ZHOU Jianbo. Deformation behaviour of coarse grained materials under cyclic loading[J]. Rock and Soil Mechanics,2010,31(5):1 375–1 380.(in Chinese))
[9] LEE K L,CHAN K. Number of equivalent significant cycles in strong motion earthquakes[C]// Proceedings of International Conference on Microzonation for Safer Construction Research and Application. [S.l.]:[s.n.],1972:609–627. |
|
|
|