| A CASE STUDY OF ROCK MASS ENGINEERING OF UNDERGROUND POWERHOUSE AT XILUODU HYDROPOWER STATION |
| FAN Qixiang1,2,WANG Yifeng2 |
| (1. State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing 100084,China;2. China Three Gorges Corporation,Yichang,Hubei 443002,China) |
|
|
|
|
Abstract The underground powerhouses′ rock masses at Xiluodu hydropower station are discontinuous and anisotropic damage influenced by the inner beddings of the basalt. The elasto-plastic damage theory is used to analyze the stability of surrounding rock. A good construction organization and technological are executed to control the rock excavation damage in order to ensure the rock beam forming. Moreover,the safety monitoring feedback is implemented for the location of geological defects,and the monitoring results are used to estimate the surrounding rock stability. Through reviewing the rock mass engineering practice process of a typical underground powerhouse such as the complex geological conditions,stability analysis,excavation and support procedures,and safety monitoring analysis,a number of insights for the design concept and implementation of the project are put forward,which can provide direct reference for the giant underground powerhouse engineering.
|
|
Received: 29 April 2010
|
|
|
|
| [1] 韩荣荣,张建海,张 肖,等. 溪洛渡地下厂房开挖反馈计算及预测研究[J]. 山东大学学报:工学版,2009,39(4):140–144.(HAN Rongrong,ZHANG Jianhai,ZHANG Xiao,et al. Study of prediction on feedback calculation of excavated monitor to the underground powerhouse of Xiluodu[J]. Journal of Shandong University:Engineering Science,2009,39(4):140–144.(in Chinese))
[2] 李友华,黄应军,李景元,等. 溪洛渡水电站左岸地下厂房大跨度高边墙开挖施工技术[J]. 水力发电,2008,34(9):9–13.(LI Youhua,HUANG Yingjun,LI Jingyuan,et al. Excavation techniques of large-span and high sidewall of left-bank underground powerhouse of Xiluodu hydropower station[J]. Water Power,2008,34(9):9–13.(in Chinese))
[3] 唐旭海,张建海,张恩宝,等. 溪洛渡电站左岸地下厂房洞室群围岩稳定性研究[J]. 云南水力发电,2007,23(1):33–37.(TANG Xuhai,ZHANG Jianhai,ZHANG Enbao,et al. Study on the cavern surrounding rock stability of the underground powerhouse of the Xiluodu hydropower station[J]. Yunnan Water Power,2007,23(1):33–37.(in Chinese))
[4] 王明华,冯文凯,刘汉超,等. 溪洛渡水电站地下厂房岩体结构特征及围岩分类[J]. 山地学报,2003,21(1):101–105.(WANG Minghua,FENG Wenkai,LIU Hanchao,et al. A study on rock mass structure feature and surrounding rock ranking for Xiluodu hydroelectric powerstation[J]. Journal of Mountain Science,2003,21(1):101–105.(in Chinese))
[5] 杨 强,陈 新,周维垣. 岩土材料弹塑性损伤模型及变形局部化分析[J]. 岩石力学与工程学报,2004,23(21):3 577–3 583. (YANG Qiang,CHEN Xin,ZHOU Weiyuan,et al. Elasto-plastic damage model for geomaterials and strain localization analysis[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(21):3 577–3 583.(in Chinese))
[6] 张强勇,朱维申,金亚兵. 弹塑性损伤模型在某地下厂房工程中的应用[J]. 岩石力学与工程学报,1999,18(6):654–657.(ZHANG Qiangyong,ZHU Weishen,JIN Yabing. Application of elastoplastic damage model in a large sized underground power house[J]. Chinese Journal of Rock Mechanics and Engineering,1999,18(6):654–657.(in Chinese))
[7] 张强勇,朱维申,陈卫忠,等. 三峡船闸高边坡开挖卸荷弹塑性损伤分析[J]. 水利学报,1998,8(1):140–144.(ZHANG Qiangyong,ZHU Weishen,CHEN Weizhong,et al. Analysis of elastoplastic damage for high jointed slope of the Three Gorges Project shiplock during unloading due to excavation[J]. Journal of Hydraulic Engineering,1998,8(1):140–144.(in Chinese))
[8] 田燕萍,傅衣铭. 考虑损伤效应的正交各向异性板的弹塑性后屈曲分析[J]. 应用数学和力学,2008,29(7):764–774.(TIAN Yanping,FU Yiming. Elastoplastic post-buckling analysis of orthotropic plates including damage effects[J]. Applied Mathematics and Mechanics,2008,29(7):764–774.(in Chinese)) |
|
|
|