| STUDY OF TYPICAL BLOCKS IN VAULT OF THREE GORGES UNDERGROUND POWERHOUSE |
| XIA Lu1,LI Maohua2,CHEN Youhua2,WANG Jiaxiang2,YU Qingchun1 |
| (1. School of Water Resources and Environment,China University of Geosciences,Beijing 100083,China;2. Three Gorges Geotechnical Consultants Co.,Ltd,Wuhan,Hubei 430074,China) |
|
|
|
|
Abstract The stability of block is one of the key geological issues in the underground powerhouse caverns in the Three Gorges Project. Large-scale blocks can be easily developed due to enormous excavated surface associated with large spans and high side walls in underground caverns. The basic analysis process of GeneralBlock software is presented. First,the 3D block model is set up by GeneralBlock in order to identify and analyze the associated stability problem of rock block in vaults. Based on the modeling results,design and construction of effective reinforcement in accordance with combination of different types of rock blocks are put into practice. In addition,system monitorings for bolts,cables and blocks are set up. The safety monitoring results show that the deformation of block is less than 2 mm,and the stress of anchor bar and loss rate of cable remain stable. These outcomes indicate generally an effective reinforcement.
|
|
Received: 25 February 2010
|
|
|
|
| [1] GOODMAN R E,SHI G H. Geology and rock slope stability application of the key block concept for rock slopes[C]// Proceedings of the 3rd International Conferences on Stability in Surface Mining. New York:[s. n],1982:347–373.
[2] HOEK E,KAISER P K,BAWDEN W F. Support of underground excavation in hard rock[M]. New York:A. A. Balkema,1995.
[3] LIN D,FAIRHURST C,STARFIELD A M. Geometrical identification of three-dimensional rock block systems using topological techniques[J]. International Journal of Rock Mechanics and Mining Science and Geomech Abstracts,1987,24(6):331–338.
[4] IKEGAWA Y,HUDSON J A. A novel automatic identification system for three-dimensional multi-block systems[J]. Engineering Computing,1992,9(2):169–179.
[5] YU Q,OHNISHI Y,XUE G,et al. An approach to the identification of three-dimensional rock block[C]// Proceedings of International Symposium on Imaging Applications in Geology,Liege. Belgium:[S. l],1999:1 009–1 013.
[6] YU Q. Analyses for fluid flow and solute transport in discrete fracture network[Ph. D. Thesis][D]. Kyoto:Kyoto University,2000.
[7] OHNISHI Y,YU Q. 3D block analyses for fractured rock[C]// Desai ed. Computer Methods and Advances in Geomechanics[M]. New York:A. A. Balkema,2001:577–580.
[8] 于青春,薛果夫,陈德基. 裂隙岩体一般块体理论[M]. 北京:中国水利水电出版社,2007.(YU Qingchun,XUE Guofu,CHEN Deji. General block method of fractured rock mass[M]. Beijing:China Waterpower Press,2007.(in Chinese))
[9] YU Q,OHNISHI Y,XUE G,et al. A generalized procedure to identify three-dimensional rock blocks around complex excavations[J]. International Journal for Numerical and Analytical Methods in Geomechanics,2009,33(3):355–375.
[10] 于青春,陈德基,薛果夫,等. 裂隙岩体一般块体理论初步[J]. 水文地质工程地质,2005,32(6):42–48.(YU Qingchun,CHEN Deji,
XUE Guofu,et al. Preliminary study on general block method of fractured rock mass[J]. Hydrogeology and Engineering Geology,2005,32(6):42–48.(in Chinese))
[11] 曹广晶. 三峡工程若干关键科学技术问题[J]. 水力发电学报,2009,28(6):4–7.(CAO Guangjing. Key science and technical problems of Three Gorges Project[J]. Journal of Hydroelectric Engineering,2009,28(6):4–7.(in Chinese))
[12] 黄 达,黄润秋,张永兴. 三峡工程地下厂房围岩块体变形特征及稳定性分析[J]. 水文地质工程地质,2009,36(5):1–7.(HUANG Da,HUNAG Runqiu,ZHANG Yongxing. Analysis on the deformation and stability of blocks in surrounding rock mass of underground powerhouse of the Three Gorges Project[J]. Hydrogeology and Engineering Geology,2009,36(5):1–7.(in Chinese))
[13] 黄 达,黄润秋,王家祥. 开挖卸荷条件下大型地下硐室块体稳定性的对比分析[J]. 岩石力学与工程学报,2007,26(增2):4 115–4 122. (HUANG Da,HUNAG Runqiu,WANG Jiaxiang. Contrastive analysis of block in large underground caverns under conditions of excavation and unloading[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):4 115–4 122.(in Chinese))
[14] 王家祥,叶圣生,王德阳,等. 三峡地下电站尾水洞槽挖洞间岩墩稳定性分析[J]. 人民长江,2007,38(9):66–68.(WANG Jiaxiang,YE Shengshen,WANG Deyang,et al. Stability analysis for separating rock wall between tailrace tunnels of the Three Gorges Project[J]. Yangtze River,2007,38(9):66–68.(in Chinese))
[15] 王家祥,叶圣生,周质荣,等. 三峡地下电站主厂房顶拱块体模式及加固对策[J]. 人民长江,2007,38(9):63–68.(WANG Jiaxiang,YE Shengsheng,ZHOU Zhirong,et al. Study on failure modes and countermeasure of main work shop top arch block at Three Gorges[J]. Yangtze River,2007,38(9):63–68.(in Chinese))
[16] 张志斌,韩丽粉,周 扬. 三峡工程地下电站主厂房顶拱锚杆施工技术[J]. 南水北调与水利科技,2008,6(5):80–82.(ZHANG Zhibin,HAN Lifen,ZHOU Yang. Anchor rod constructing technique in the underground power station in the Three Gorges Project[J]. South- to-North Water Transfers and Water Science and Technology,2008,6(5):80–82.(in Chinese))
[17] 万福贵,丁时喜. 三峡地下电站厂房顶拱无黏结预应力锚索施工技术[J]. 湖北水力发电,2008,(4):31–34.(WAN Fugui,DING Shixi. Construction of non-coherent-prestressed anchorage cables in vault of Three Gorges underground power house[J]. Hubei Water Power,2008,(4):31–34.(in Chinese)) |
|
|
|