| ANALYSIS OF ENGINEERING PROJECTS OF RISK CONTROL IN HANGZHOU QING-CHUN ROAD CROSS-RIVER
TUNNEL CONSTRUCTION |
| ZHANG Zhongmiao1,LIN Cungang1,WU Shiming2,LI Zongliang2,XIE Wenbin3,WANG Chengshan3 |
(1. Institute of Geotechnical Engineering,Zhejiang University,Hangzhou,Zhejiang 310058,China;
2. Hangzhou Qingchun Road Cross-river Tunnel Co.,Ltd.,Hangzhou,Zhejiang 310002,China;
3. China Railway Tunnel Stock Co.,Ltd.,Zhengzhou,Henan 450000,China) |
|
|
|
|
Abstract Engineering projects of risk control in construction of Hangzhou Qingchun road cross-river tunnel are introduced. Contents include:causes of water leakage at the tunnel portal and soil collapse at the reinforced area when the shield setting out are put forward,moreover,avoidance and treatment measures are described. Reasons leading to the differences of settlements of the levee when two shields traversing it respectively are analyzed,and some construction measures for slurry shield to cross the levee are proposed. Reasons to the invalidation of the tail seal are studied,and techniques to shut off the groundwater using liquid nitrogen freezing method and repair the tail seal brushes in the artesian aquifer are presented. Engineering practices show that good tightness of the tunnel portal can avoid water leakage and soil collapse at the reinforced area,and optimization of parameters of shield driving can reduce disturbance to the levee while shield tunneling. On the contrary,sustainable rainfall and severe fluctuation of the chamber pressure lead to larger settlements. It is also shown that liquid nitrogen freezing method can seal off the groundwater safely and the repair of the tail seal brushes eliminates the risk of mud leakage of the shield tail successfully. These results would provide a scientific reference for risk control in similar shield tunnelling in practice.
|
|
Received: 29 January 2010
|
|
|
|
| [1] 中华人民共和国建设部. 地铁及地下工程建设风险管理指南[M]. 北京:中国建筑工业出版社,2007:1–13.(The Ministry of Construction of the People?s Republic of China. Guidelines of risk management for construction of subway and underground works[M]. Beijing:China Architecture and Building Press,2007:1–13.(in Chinese))
[2] The Government of the Hong Kong Special Administrative Region. TGN25 Geotechnical risk management for tunnel works[S]. Hong Kong:[s.n.],2005.
[3] ESKESEN S D,TENGBORG P B,KAMPMANN J,et al. Guidelines for tunneling risk management:international tunneling association,working group No.2[J]. Tunneling and Underground Space Technology,2004,19(3):217–237.
[4] 周文波. 盾构法隧道施工技术及应用[M]. 北京:中国建筑工业出版社,2004:298–301.(ZHOU Wenbo. Shield tunnelling technology[M]. Beijing:China Architecture and Building Press,2004:298–301.(in Chinese))
[5] 吴贤国,吴 刚,骆汉宾. 武汉长江隧道工程盾构施工风险研究[J]. 中国市政工程,2007,(1):51–53.(WU Xianguo,WU Gang,LUO Hanbin. Risk analysis on shield tunneling of Wuhan Yangtze river tunnel project[J]. China Municipal Engineering,2007,(1):51–53.(in Chinese))
[6] 赵香萍. 狮子洋隧道泥水盾构始发的风险控制[J]. 铁路建筑技术,2009,(1):137–144.(ZHAO Xiangping. Risk control on the slurry shield initiation of Shiziyang tunnel[J]. Railway Construction,2009,(1):137–144.(in Chinese))
[7] 张忠苗. 桩基工程[M]. 北京:中国建筑工业出版社,2007:21–50.(ZHANG Zhongmiao. Pile foundation engineering[M]. Beijing:China Architecture and Building Press,2007:21–50.(in Chinese))
[8] 马可栓. 盾构施工引起地基移动与邻近建筑保护研究[博士学位论文][D]. 武汉:华中科技大学,2008:113–128.(MA Keshuan. Research on the ground settlement caused by the shield construction and the protection of adjacent buildings[Ph. D. Thesis][D]. Wuhan:Huazhong University of Science and Technology,2008:113–128.(in Chinese))
[9] 张顶立,李鹏飞,侯艳娟,等. 城市隧道开挖对地表建筑群的影响分析及其对策[J]. 岩土工程学报,2010,32(2):296–302.(ZHANG Dingli,LI Pengfei,HOU Yanjuan,et al. Influence due to urban tunnel excavation on ground buildings and its countermeasures[J]. Chinese Journal of Geotechnical Engineering,2010,32(2):296–302.(in Chinese))
[10] VITTORIO G,PIERGIORGIO G,ASHRAF M,et al. Mechanized tunneling in urban areas-design methodology and construction control[M]. London:Taylor and Francis Group,2008:125–152.
[11] JOHN A P. Numerical modelling of building response to tunnelling[D]. Oxford:Balliol College,University of Oxford,2006:23–42.
[12] 吴秀国. 长距离隧道施工过程洞内修复盾构尾刷技术[J]. 广州建筑,2006,33(4):25–27.(WU Xiuguo. The technique of shield tail brush be repaired inside during long tunnel building[J]. Guangzhou Architecture,2006,33(4):25–27.(in Chinese))
[13] 刘阳升. 富水地层三菱盾构机尾刷更换技术[J]. 隧道建设,2006,26(增2):88–90.(LIU Yangsheng. Technology for replacement of sealing brushes of shield machines manufactured by Mitsubishi Heavy Industries Ltd. in ground with rich water[J]. Tunnel Construction,2006,26(Supp.2):88–90.(in Chinese))
[14] 杜建华,彭彦彬,杜立峰,等. 盾构掘进施工中盾构机盾尾密封更换关键技术研究[J]. 铁道建筑,2007,46(3):47–48.(DU Jianhua,PENG Yanbin,DU Lifeng,et al. Study of key technologies about changing seal brushes at shield tail during shield tunneling[J]. Railway Engineering,2007,46(3):47–48.(in Chinese))
[15] 李勇成,张志鹏. 强透水地层下更换盾尾密封技术[J]. 探矿工程(岩土钻掘工程),2008,51(4):80–81.(LI Yongcheng,ZHANG Zhipeng. Technique of shield tail seal brush replacement in high-penetrative ground[J]. Exploration Engineering(Drilling and Tunneling),2008,51(4):80–81.(in Chinese))
[16] 胡向东,程烨尔. 盾构尾刷冻结法更换的温度场数值分析[J]. 岩石力学与工程学报,2009,28(增2):3 516–3 525.(HU Xiangdong,CHENG Yeer. Numerical analysis of temperature field during replacement of shield tail brush by freezing method[J]. Chinese Journal of Rock and Engineering,2009,28(Supp.2):3 516–3 525.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|