| RESEARCH ON STRESS AND DEFORMATION MECHANISMS OF SHALLOW SECTION WITH UNSYMMETRICAL LOADING OF MULTI-ARCH TUNNEL |
| PAN Long1,WANG Jianguo1,CHEN Luwang2 |
(1. School of Civil and Hydraulic Engineering,Hefei University of Technology,Hefei,Anhui 230009,China;
2. School of Resources and Environmental Engineering,Hefei University of Technology,Hefei,Anhui 230009,China) |
|
|
|
|
Abstract Taking Shuanghekou tunnel of Anjing expressway as engineering background,focused on the shallow section with unsymmetrical loading of multi-arch tunnel,the stress distribution of wall-rock is discussed under the combined effect of geostress and slope sliding. In order to meet the need of practice,a nonlinear method has been proposed to decompose the monitoring data;and the function between the stress and the deformation of wall-rock is established. At the same time,the remaining fluctuations is used to analyze the abnormal phenomenon in construction. The results show that when the shallow section with unsymmetrical loading of multi-arch tunnel is in the combination action of overlying load and sliding slope,the wall-rock and supporting structure,which are located in the tail of the most dangerous sliding surface,will have the largest deformation under mixed loading of tension and shearing. It is more obviously explained by monitoring data tendency item when eliminating construction and other influencing factor. Thus,the slope sliding must be taken into account when the tunnel goes through the wall-rock close to the most dangerous sliding surface.
|
|
Received: 04 June 2010
|
|
|
|
| [1] 王祥秋,杨林德,高文华. 高速公路偏压隧道施工动态监测与有限元仿真模拟[J]. 岩石力学与工程学报,2005,24(2):284–289. (WANG Xiangqiu,YANG Linde,GAO Wenhua. Dynamic monitoring and FEM simulation analysis of an expressway tunnel with unsymmetrical loadings[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(2):284–289.(in Chinese))
[2] 庄 宁,朱苦竹,李军伟. 偏压连拱隧道施工的动态模拟及最优化分析[J]. 岩土力学,2009,30(9):2 876–2 880.(ZHUANG Ning,ZHU Kuzhu,LI Junwei. Research on partial pressure joint arch tunnel?s dynamic simulation and optimum analysis of construction process[J]. Rock and Soil Mechanics,2009,30(9):2 876–2 880.(in Chinese))
[3] 周家文,徐卫亚,石安池. 高边坡开挖变形的非线性时间序列预测分析[J]. 岩石力学与工程学报,2006,25(增1):2 795–2 800.(ZHOU Jiawen,XU Weiya,SHI Anchi. Application of nonlinear time series analysis to excavation deformation predication of high slope[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.1):2 795–2 800.(in Chinese))
[4] 马文涛. 基于小波变换和GALSSVM的边坡位移预测[J]. 岩土力学,2009,30(增2):394–398.(MA Wentao. Prediction of slope displacement based on wavelet transform and genetic algorithm-least square support vector machine[J]. Rock and Soil Mechanics,2009,30(Supp.2):394–398.(in Chinese))
[5] HUANG N E,SHEN Z,LONG S R,et al. The empirical mode decomposition and the Hilbert spectrum for nonlinear and non- stationary time series analysis[C]// Proceedings of the Royal Society London:[s. n.],1998:903–995.
[6] 刘霖雯,刘 超,江成顺. EMD新算法及其应用[J]. 系统仿真学报,2007,19(2):446–464.(LIU Linwen,LIU Chao,JIANG Chengshun. Novel EMD alogorithm and its application[J]. Journal of System Simulation,2007,19(2):446–464.(in Chinese))
[7] 郭志强,杨 杰. SVD与LDA相结合的人脸特征提取方法[J]. 计算机工程与设计,2009,30(22):5 133–5 135.(GUO Zhiqiang,YANG Jie. Method to extract features of face image combined SVD and LDA[J]. Computer Engineering and Design,2009,30(22):5 133– 5 135.(in Chinese))
[8] 丁文其,王晓形,朱合华,等. 连拱隧道设计荷载的确定方法[J]. 中国公路学报,2007,20(5):78–82.(DING Wenqi,WANG Xiaoxing,ZHU Hehua,et al. Defining method for designing load of multi-arch tunnel[J]. China Journal of Highway and Transport,2007,20(5):78–82.(in Chinese))
[9] 张路青,杨志法,吕爱钟. 两平行的任意形状洞室围岩位移场解析法研究及其在位移反分析中的应用[J]. 岩石力学与工程学报,2000,19(5):584–589.(ZHANG Luqing,YANG Zhifa,LU Aizhong. Analysis study on displacement field of surrounding rocks of two parallel tunnels with arbitrary shapes and its application to back analysis of displacement[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(5):584–589.(in Chinese))
[10] 刘宏才. 巷道断面形状对弹性围岩力学状态的影响[硕士学位论文][D]. 泰安:山东矿业学院,1987.(LIU Hongcai. The influence of laneway section shape on the mechanical states of elastic surrounding rock[M. S. Thesis][D]. Tai?an:Shandong Institute of Mining,1987.(in Chinese))
[11] 邓 建,朱合华,丁文其. 不等跨连拱隧道施工全过程的有限元模拟[J]. 岩土力学,2004,25(3):477–480.(DENG Jian,ZHU Hehua,DING Wenqi. Finite element simulation of whole excavation operation of an unequal-span double-arch tunnel[J]. Rock and Soil Mechanics,2004,25(3):477–480.(in Chinese))
[12] 来弘鹏,谢永利,杨晓华. 不同应力场软弱围岩公路连拱隧道中墙受力特征[J]. 长安大学学报:自然科学版,2010,30(6):50–55.(LAI Hongpeng,XIE Yongli,YANG Xiaohua. Stress characteristics of middle wall in soft-wreak surrounding rocks highway multiple-arch tunnel under different stress fields[J]. Journal of Chang?an University:Natural Science,2010,30(6):50–55.(in Chinese))
[13] 徐志英. 岩石力学[M]. 北京:中国水利水电出版社,1993:81–82.(XU Zhiying. Rock mechanics[M]. Beijing:China Water Power Press,1993:81–82.(in Chinese))
[14] 王海斌,李永盛. 边坡稳定性有限元分析的处理技巧[J]. 岩石力学与工程学报,2005,24(13):2 386–2 391.(WANG Haibin,LI Yongsheng. Improved method of finite element analysis of slope stability[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(13):2 386–2 391.(in Chinese))
[15] 戴自航,卢才金. 边坡失稳机制的力学解释[J]. 岩土工程学报,2006,28(10):1 191–1 197.(DAI Zihang,LU Caijin. Mechanical explanations on mechanism of slope stability[J]. Chinese Journal of Geotechnical Engineering,2006,28(10):1 191–1 197.(in Chinese))
[16] 李新星,朱合华,丁文其,等. 连拱隧道施工过程的三维空间效应模拟与分析[J]. 岩土力学,2006,27(增1):256–260.(LI Xinxing,ZHU Hehua,DING Wenqi,et al. 3D simulation and analysis of space-time effect for construction process of twin tunnel[J]. Rock and Soil Mechanics,2006,27(Supp.1):256–260.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|