|
|
|
| STUDY OF ENGINEERING GEOLOGICAL
CHARACTERISTICS OF GRAVEL PEBBLE LAYER FOR DAM FOUNDATION OF HYDROPOWER PROJECT |
| WANG Qiguo |
(Changjiang Geotechnical Engineering Corporation,Changjiang Institute of Survey,Planning,Design and Research,
Wuhan,Hubei 430010,China) |
|
|
|
|
Abstract The gravel and pebble is a common kind of coarse-grained soil in the riverbed of hydropower project,but its engineering properties have a significant impact on the layout of the dam project while its thickness is much large. The study object is the gravel layer deposited lately in Shangjiang to Qizong river reach riverbed of Jinsha River,which is much thick. The study employs some comprehensive methods,such as exploration,grain size analysis,in-situ tests,and laboratory tests of physico-mechanical properties for imitated gradation sample,and find out that this layer has the frame from coarse grains and some geological characteristics of this layer,such as much high bearing capacity,shear resistance,modulus of deformation and elasticity,and moderate to heavy permeability. This paper discusses the engineering geological problems from different plans while using this layer or clearing it. The study result provides the geological basis for the study of building dam on the gravel layers,and there is a certain reference value for similar projects and the soil mechanics study.
|
|
Received: 10 September 2010
|
|
|
|
| [1] 金 辉. 我国西南地区河谷深厚覆盖层基本特征与成因机制研究[硕士学位论文][D]. 成都:成都理工大学,2008.(JIN Hui. Study on the basic characteristice and genetic mechanism of the thick overburben layer in China Southwest[M. S. Thesis][D]. Chengdu:Chengdu University of Technology,2008.(in Chinese))
[2] 王启国. 金沙江虎跳峡河段河床深厚覆盖层成因及工程意义[J]. 岩石力学与工程学报,2009,28(7):1 455–1 466.(WANG Qiguo. Causes riverbed deep cover and engineering significance of Tiger Leaping Gorge reach of Jinsha River[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(7):1 455–1 466.(in Chinese))
[3] 刘 杰,谢定松,崔亦昊. 江河大堤堤基砂砾石层管涌破坏危害性试验研究[J]. 岩土工程学报,2009,31(8):1 188–1 191.(LIU Jie,XIE Dingsong,CUI Yihao. Destructive tests on piping failure of sandy gravel layer of river dikes[J]. Chinese Journal of Geotechnical Engineering,2009,31(8):1 188–1 191.(in Chinese))
[4] 杨聚利,刘荣德,濮声荣. 新疆下坂地水库坝址主要工程地质问题及坝址选择[J]. 资源环境与工程,2008,22(增1):28–32.(YANG Juli,LIU Rongde,PU Shengrong. Main engineering geological problems and dam site selection of Xiabandi reservoir in Xinjiang[J]. Resources Environment and Engineering,2008,22(Supp.):28–32.(in Chinese))
[5] 王启国,严应征,林仕祥,等. 王甫洲水利枢纽坝基主要工程地质问题及对策[J]. 人民长江,2009,40(5):80–83.(WANG Qiguo,YAN Yingzhen,LIN Shixiang,et al. Main engineering geological problems and countermeasures of dam foundation of Wangfuzhou Hydro Project on the Hanjiang River[J]. Yangtze River,2009,40(5):80–83.(in Chinese))
[6] 李立刚. 小浪底大坝基础渗流稳定性研究[J]. 水资源与水工程学报,2007,18(3):39–41.(LI Ligang. Stabilization analysis of dambase seepage for Xiaolangdi project[J]. Journal of Water Resources and Water Engineering,2007,18(3):39–41.(in Chinese))
[7] 许 强,陈 伟,张倬元. 对我国西南地区河谷深厚覆盖层成因机制的新认识[J]. 地球科学进展,2008,23(5):448–456.(XU Qiang,CHEN Wei,ZHANG Zhuoyuan. New views on forming mechanism of deep overburden on river bed in Southwest of China[J]. Advances in Earth Science,2008,23(5):448–456.(in Chinese))
[8] 中华人民共和国国家标准编写组. GB50487—2008. 水利水电工程地质勘察规范[S]. 北京:中国计划出版社,2009.(The National Standards Compilation Group of People?s Republic of China. GB50487—2008. Code for engineering geological investigation of water resources and hydropower[S]. Beijing:China Planning Press,2009.(in Chinese))
[9] 中华人民共和国行业标准编写组DL/T5395—2007. 碾压式土石坝设计规范[S]. 北京:中国电力出版社,2008.(The Professional Standards Compilation Group of People?s Republic of China. DL/T5395—2007. Design specification for rolled earth-rock fill dams[S]. Beijing:China Electric Power Press,2008.(in Chinese)) |
|
|
|