Abstract Engineering properties of loess is affected obviously by moisture content. Zhangmao tunnel of Zhengzhou—Xi?an passenger railway is through nearly saturated loess with the moisture content of 20%,which is very difficult for construction. The construction geological condition of Zhangmao tunnel is analyzed and the result is made to determine the excavation method. The special excavation method is studied and a specific step of the tunnel continued excavation is given. The excavation technology needs for rapid closure of the construction cutting face. According to the tunnel design,this tunnel has a very large size excavation section. So the three-dimensional non-contact deformation observation methods are studied in order to get information fastly. The characteristics of crown settlement and the two walls convergence after the initial support of the excavation are tested in site for a long time. Combined with earth pressure cells and strain gauge testing on the surface of the initial support,the characteristics of soil pressure and surface contact force on the initial support are studied. The characteristics of deformation and stress of initial support on the condition of seven-step excavation in three steps of nearly saturated loess are obtained. The limit deformation amount characteristics of initial support of the loess tunnel under this kind of tunnel excavation method are summarized and it can be a reference for similar projects.
|
|
Received: 29 December 2010
|
|
|
|
| [1] CHEN J X. Monitoring and analysis for tunnel excavation in loess[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(Supp.1):2 272–2 276.
[2] 赵德安,蔡小林,SWOBODA G. 锚杆单元及其在黄土隧道计算中的若干问题[J]. 岩石力学与工程学报,2004,23(24):4 183–4 189. (ZHAO De?an,CAI Xiaolin,SWOBODA G. Some problem associated with analysis of tunnels in loess using bolt element[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(24):4 183–4 189.(in Chinese))
[3] 朱泽兵,张东明. 浅埋、富水、软弱黄土地段隧道施工技术[J]. 地下空间,2001,21(2):134–137.(ZHU Zebing,ZHANG Dongming. Shallow,water-rich,soft loess tunnel construction technology[J]. Underground Space,2001,21(2):134–137.(in Chinese))
[4] 赵占厂,谢永利. 黄土公路隧道衬砌参数影响性状分析[J]. 岩土工程学报,2005,27(11):1 291–1 295.(ZHAO Zhanchang,XIE Yongli. Performance analysis of loess highway tunnel affected by lining parameters[J]. Chinese Journal of Geotechnical Engineering,2005,27(11):1 291–1 295.(in Chinese))
[5] 孙 辉,刘新荣,陈晓江,等. 黄土联拱隧道的施工过程模拟和方案优化[J]. 地下空间与工程学报,2005,1(5):737–741.(SUN Hui,LIU Xinrong,CHEN Xiaojiang,et al. Numerical simulation and optimization for the loess double arch tunnel construction[J]. Chinese Journal of Underground Space and Engineering,2005,1(5):737–741.(in Chinese))
[6] 李宁军,夏永旭. 基质吸力对非饱和黄土隧道力学特性影响研究[J]. 西安公路交通大学学报,2000,20(2):49–51.(LI Ningjun,XIA Yongxu. Research of effect of matrix suction on the mechanical characteristics on unsaturated loess tunnel[J]. Journal of Xi?an Highway University,2000,20(2):49–51.(in Chinese))
[7] 廖大恳. 饱和性黄土质单线铁路隧道施工技术[J]. 铁道工程学报,2005,(4):51–54.(LIAO Daken. Construction technique of signal track railway tunnel in saturated loess area[J]. Journal of Railway Engineering Society,2005,(4):51–54.(in Chinese))
[8] 周尚国. 黄土隧道的主要地质灾害类型[J]. 地质与勘探,2007,43(2):103–107.(ZHOU Shangguo. Main geology disasters type of loess tunnel[J]. Geology and Prospecting,2007,43(2):103–107.(in Chinese))
[9] 杨建民,喻 渝,赵辉雄. 郑西客运专线富水黄土隧道的设计与验证[J]. 铁道标准设计,2008,(11):86–89.(YANG Jianmin,YU Yu,ZHAO Huixiong. Water-rich loess tunnel design and verification in Zhengzhou—Xi?an passenger railway[J]. Railway Standard Design,2008,(11):86–89.(in Chinese))
[10] 蒋树屏,刘元雪,赵尚毅. 浅埋偏压黄土连拱隧道施工方案有限元数值模拟[J]. 公路交通技术,2006,(1):95–99.(JIANG Shuping,LIU Yuanxue,ZHAO Shangyi. Finite element numerical simulation of shallow buried biasing loess multiple arch tunnel construction plan[J]. Technology of Highway and Transport,2006,(1):95–99.(in Chinese))
[11] 霍玉华,王晓州,孟飞彪. 大断面黄土隧道快速掘进施工方法研究[J]. 铁道标准设计,2007,(增1):122–125.(HUO Yuhua,WANG Xiaozhou,MENG Feibiao. Study on rapid excavation method of large section tunnel in loess area[J]. Railway Standard Design. 2007,(Supp.1):122–125.(in Chinese))
[12] 宫 兵. 郑西客运专线张茅隧道七步台阶法施工技术[J]. 铁道标准设计,2008,(10):78–80.(GONG Bing. The seven step construction technology of Zhangmao tunnel in Zhengzhou—Xi?an passenger railway[J]. Railway Standard Design,2008,(10):78–80.(in Chinese))
[13] 赵华峰. 铁路客运专线大断面黄土隧道施工技术[J]. 山西建筑,2007,33(11):345–346.(ZHAO Huafeng. Construction technology of large section loess tunnel in railway line for passenger traffic[J]. Shanxi Architecture,2007,33(11):345–346.(in Chinese))
[14] 王农为. 客运专线黄土隧道施工探讨和应注意的问题[J]. 铁道建筑技术,2006,(4):21–24.(WANG Nongwei. Analysis of construction of loess tunnel on passenger railway and issues to be noted[J]. Railway Construction Technology,2006,(4):21–24.(in Chinese)) |
|
|
|