(1. State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University,Chengdu,Sichuan 610065,China;
2. Pubugou Hydropower Station Construction,Company Guodian Dadu River Co. Ltd.,Ya?an,Sichuan 625300,China;
3. Valley Repair and Installation Company,Guodian Dadu River Co. Ltd.,Leshan,Sichuan 614900,China) |
|
|
|
|
Abstract Excessive arching existing in the high rockfill dam corewall during construction period,is inclined to produce the hydraulic fracturing and concentrated leakage consequently during the storage period. Therefore,the analysis and evaluation of the arching characteristics of high corewall rockfill dam during construction period,is of high-guiding significance to the progress of following storage and the consequently construction of higher rockfill dam corewall in domestic. Based on the stress monitoring data of gravelly soil corewall in Pubugou dam during construction period,and combined with the practical deformation monitoring data,using the actual construction process and field building procedure,the arching in gravelly soil corewall have been analyzed during construction period in time and space scale respectively. Analysis found that:arching during construction period is gradually shown with the accompany of the construction and consolidation progress. With the increasing of dam height and the passing of time,the arching is more and move obvious. The strongest arching of corewall occurs in the 1/3 height of dam. Except the vicinity of contact surface between core and shell,the place near the dam axis also have strong arching. To reduce the arching during construction period,the upstream and downstream dam shell should always being watered,and the height of corewall should be kept slightly higher than the dam shell,and the valley higher than the slope.
|
|
Received: 17 December 2010
|
|
|
|
| [1] 徐 晗,汪明元,程展林,等. 深厚覆盖层300 m级超高土质心墙坝应力变形特征[J]. 岩土力学,2008,29(11):64–68.(XU Han,WANG Mingyuan,CHENG Zhanlin,et al. 3D stress and deformation characteristics of 300 m level high earth core dams with thick overburden layer[J]. Rock and Soil Mechanics,2008,29(11):64–68.(in Chinese))
[2] 陈立宏,陈祖煜,张进平,等. 小浪底大坝心墙中高孔隙水压力的研究[J]. 水利学报,2005,36(2):219–223.(CHEN Lihong,CHEN Zuyu,ZHANG Jinping,et al. Study on high pore pressure in clay core wall of earth dam in Xiaolangdi Project [J]. Journal of Hydraulic Engineering,2005,36(2):219–223.(in Chinese))
[3] 张继宝,陈五一,李永红,等. 双江口土石坝心墙拱效应分析[J]. 岩土力学,2008,29(11):185–188.(ZHANG Jibao,CHEN Wuyi,LI Yonghong,et al. Analysis of core arching effect of Shuang jiangkou Earth-rockfill Dam[J]. Rock and Soil Mechanics,2008,29(11):185–188.(in Chinese))
[4] 贾海莉,王成华,李江洪. 关于土拱效应的几个问题[J]. 西南交通大学学报,2003,38(4):398–402.(JIA Haili,WANG Chenghua,LI Jianghong. Discussion on some issues in theory of soil arch[J]. Journal of Southwest Jiaotong University,2003,38(4):398–402.(in Chinese))
[5] TERZAGHI K. Theoretical soil mechanics[M]. New York:John Wiley and Sons,1947.
[6] RICHARD L H. The arch in soil arching[J]. Journal of Geotechnical Engineering,1985,111(3):302–318.
[7] 潘家铮. 土石坝[M]. 北京:水利电力出版社,1981.(PAN Jiazheng. Earth-rock dam[M]. Beijing:Water Resources and Electric Power Press,1981.(in Chinese))
[8] 卢廷浩,汪荣大. 瀑布沟土石坝心墙应力变形分析[J]. 河海大学学报:自然科学版,1998,26(2):41–44.(LU Tinghao,WANG Rongda. Stress and deformation analysis of corewall for Pubugou soil and rockfill dam[J]. Journal of Hohai University:Natural Sciences,1998,26(2):41–44.(in Chinese))
[9] 李国英,王禄仕,米占宽. 土质心墙堆石坝应力和变形研究[J]. 岩石力学与工程学报,2004,23(8):1 363–1 369.(LI Guoying,WANG Lushi,MI Zhankuan. Research on stress-strain behaviour of soil core rockfill dam[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(8):1 363–1 369.(in Chinese))
[10] 成都勘测设计研究院. 四川省大渡河瀑布沟水电站枢纽工程蓄水安全鉴定设计自检报告——水工设计部分[R]. 成都:成都勘测设计研究院,2009.(Chengdu Hydroelectric Investigation and Design Institute. Report of designers? self-assessment to storage safety in Pubugou Hydropower Station Project,Dadu River,Sichuan Province—part of hydraulic design[R]. Chengdu:Chengdu Hydroelectric Investigation and Design Institute,2009.(in Chinese))
[11] 成都勘测设计研究院. 四川省大渡河瀑布沟水电站枢纽工程蓄水安全鉴定设计自检报告——工程地质部分[R]. 成都:成都勘测设计研究院,2009.(Chengdu Hydroelectric Investigation and Design Institute. Report of designers? self-assessment to storage safety in Pubugou Hydropower Station Project,Dadu River,Sichuan Province—part of engineering geology[R]. Chengdu:Chengdu Hydroelectric Investigation and Design Institute,2009.(in Chinese))
[12] 二滩水电开发有限责任公司. 岩土工程安全监测手册[M]. 北京:中国水利水电出版社,1999.(Ertan Hydropower Development Company Limited. Safety monitoring manual of geotechnical engineering[M]. Beijing:China Water Power Press,1999.(in Chinese))
[13] 白永年. 堤坝劈裂灌浆的几个理论问题[J]. 水利管理技术,1994,14(5):1–5.(BAI Yongnian. Some theoretical issues of dam split grouting[J]. Technology of Water Resources Management,1994,14(5):1–5.(in Chinese))
[14] 白永年,傅文洵. 对土坝劈裂灌浆几个问题的认识[J]. 水利建设与管理,2003,14(5):55–57.(BAI Yongnian,FU Wenxun. Perspectives to some issues of dam split grouting[J]. Water Resources Development and Management,2003,14(5):55–57.(in Chinese))
[15] 王俊杰. 基于断裂力学的土石坝心墙水力劈裂研究[博士学位论文][D]. 南京,河海大学,2005.(WANG Junjie. Study of hydraulic fracturing in core of earth-rock fill dam based on fracture mechanics[Ph. D. Thesis][D]. Nanjing:Hohai University,2005.(in Chinese))
[16] 杜延龄. 土质防渗体高土石坝关键技术研究[J]. 岩土工程学报,1996,18(1):20–28.(DU Yanling. Study of key techniques for high earth-rock dam with earth impervious element[J]. Chinese Journal of Geotechnical Engineering,1996,18(1):20–28.(in Chinese))
[17] 张启岳,熊国文. 鲁布革坝的原型观测(二)[J]. 水利水运科学研究,1994,12(4):319–333.(ZHANG Qiyue,XIONG Guowen. Prototype observation to Lubuge Dam—part two[J]. Journal of Nanjing Hydraulic Research Institute,1994,12(4):319–333.(in Chinese)) |
| [1] |
ZHOU Linli1, 2, 3*, WEI Mixiang1, HAN Jun2, JIA Baoxin1, 4, BU Ji1, CUI Boyuan1. Time localization picking method for microseismic signals based on time window energy and time frequency characteristics[J]. , 2026, 45(3): 875-891. |
|
|
|
|