Abstract Based on the analysis of settlement recovery characteristics of buildings,grouting uplift mechanism is analyzed in detail,consisting of four phases,i.e. ground fill and compaction,construction of exterior isolation curtain structure,formation of uplift force and building structure uplift. The key techniques of steady uplift of buildings are then summarized. The grouting uplift during tunnel construction undercrossing experimental buildings #104 and #105 is predicted by numerical simulation. The results indicate that the maximum uplift is 2.1–3.7 mm. It is also shown that uplift force and stiffness of exterior isolation curtain will influence the uplift effect significantly;and proper increments of these two factors are favorable to some degree. For comparison,the field test is introduced,showing a repeated process of soil fracturing,filling and fracturing again. Obvious uplift of the buildings begins when grouting pressure reaches 0.7–1.0 MPa,and the single maximum uplift is 2.2–3.1 mm,which is nearly close to the simulation result. All conclusions are helpful for improving the scientific understanding of safety control of urban tunnel construction and providing references for similar projects.
|
|
Received: 20 May 2011
|
|
|
|
| [1] 蔡 军. 隧道穿越建筑物过程中注浆抬升技术研究[硕士学位论文][D]. 北京:北京交通大学,2010.(CAI Jun. Research on grouting uplift technology in the process of tunnel undercrossing the buildings[M. S. Thesis][D]. Beijing:Beijing Jiaotong University,2010.(in Chinese))
[2] 张成平,张顶立,吴介普,等. 暗挖地铁车站下穿既有地铁隧道施工控制[J]. 中国铁道科学,2009,30(1):69–73.(ZHANG Chengping,ZHANG Dingli,WU Jiepu,et al. Construction control of a newly-built subway station undercrossing the existing subway tunnel[J]. China Railway Science,2009,30(1):69–73.(in Chinese))
[3] 王占生,张顶立. 浅埋暗挖隧道近距下穿既有地铁的关键技术[J]. 岩石力学与工程学报,2007,26(增2):4 208–4 214.(WANG Zhansheng,ZHANG Dingli. Key techniques on shallow embedded tunnel constructed beneath existing subway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(Supp.2):4 208–4 214. (in Chinese))
[4] 张顶立,李鹏飞,侯艳娟,等. 浅埋大断面软岩隧道施工影响下建筑物安全性控制的试验研究[J]. 岩石力学与工程学报,2009,28(1):95–102.(ZHANG Dingli,LI Pengfei,HOU Yanjuan,et al. Experimental study on safety control of buildings during construction of shallow- buried soft rock tunnel with large-section[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):95–102.(in Chinese))
[5] 张晓丽. 浅埋暗挖法下穿既有地铁构筑物关键技术研究与实践[博士学位论文][D]. 北京:北京交通大学,2007.(ZHANG Xiaoli. Research on the key technology and experience of shallow tunneling method undercrossing the existing subway tunnel[Ph. D. Thesis][D]. Beijing:Beijing Jiaotong University,2007.(in Chinese))
[6] 巨建勋. 土体压密注浆机制及其抬升作用的研究[硕士学位论文][D]. 长沙:中南大学,2007.(JU Jianxun. Study on the mechanism and the upward-effect of compaction grouting[M. S. Thesis][D]. Changsha:Central South University,2007.(in Chinese))
[7] 冯旭海. 压密注浆作用机制与顶升效应关系的研究[博士学位论文][D]. 北京:煤炭科学研究总院,2003.(FENG Xuhai. A research on laws between the lift-effect and the mechanism of compaction grouting [Ph. D. Thesis][D]. Beijing:China Coal Research Institute,2003.(in Chinese))
[8] 邝健政,昝月稳,王 杰,等. 岩土注浆理论与工程实例[M]. 北京:科学出版社,2001:71–79.(KUANG Jianzheng,ZAN Yuewen,WANG Jie,et al. Geotechnical grouting theory and engineering practice[M]. Beijing:Science Press,2001:71–79.(in Chinese))
[9] 易小明,张顶立,逄铁铮,等. 房屋注浆抬升实践与监测分析[J]. 岩土力学,2009,30(12):3 776–3 782.(YI Xiaoming,ZHANG Dingli,PANG Tiezheng,et al. Practice and monitoring analysis of building lifting due to grouting[J]. Rock and Soil Mechanics,2009,30(12):3 776–3 782.(in Chinese))
[10] 唐智伟,赵成刚,张顶立. 地下工程抬升注浆设计方法及其抬升效果预测研究[J]. 土木工程学报,2007,40(8):79–84.(TANG Zhiwei,ZHAO Chenggang,ZHANG Dingli. Design of displacement grouting and prediction of the effect for construction of underground structures[J]. China Civil Engineering Journal,2007,40(8):79–84.(in Chinese))
[11] HELMUT F,SCHWEIGER,KUMMERER C. Numerical modeling of settlement compensation by means of fracture grouting[J]. Soils and Foundations,2004,44(1):71–86.
[12] CLEMENTS K. Numerical modeling of displacement grouting and application to case histories[M]. Graz:Technische Universität Graz,2003:121–125.
[13] WISSER C,AUGARDE C E,BURD H J. Numerical modeling of compensation grouting above shallow tunnels[J]. International Journal for Numerical and Analytical Methods in Geomechanics,2005,29(5):443–471.
[14] AU S K A,SOGA K,BOLTON M D. Effect of multiple injection on long-term compensation grouting-laboratory and numerical studies[C]// Geotechnical Aspects of Underground Construction in Soft Ground. Toulouse,France:[s.n.],2002:657–661.
[15] 侯艳娟. 城市隧道施工影响下地层与建筑物结构的动态作用关系及其应用[博士学位论文][D]. 北京:北京交通大学,2010.(HOU Yanjuan. Dynamic interaction between strata and building induced by urban tunnel construction and its application[Ph. D. Thesis][D]. Beijing:Beijing Jiaotong University,2010.(in Chinese))
[16] 逄铁铮. 全程注浆在隧道穿越既有建筑物中的试验研究[J]. 岩土力学,2008,29(12):3 451–3 458.(PANG Tiezheng. Experimental study of whole process grouting used in tunnel passing through existing structures[J]. Rock and Soil Mechanics,2008,29(12):3 451–3 458.(in Chinese)) |