| ENGINEERING PRACTICE OF ANCHOR CABLES SUPPORTING TO LARGE-SCALE UNDERGROUND CAVERNS |
| HOU Dongqi,FENG Mei,LIAO Chenggang,XING Xianglin,ZANG Haiyan |
| (HydrChina Chengdu Engineering Corporation,Chengdu,Sichuan 610072,China) |
|
|
|
|
Abstract Anchor cables supporting is one of the most leading measures for underground caverns,and it is fundamental to ensure the stability of surrounding rock mass. According to the practice of rock anchor cable to support side walls of underground powerhouse at Jinping I hydropower station,the design of anchor cables supporting and the statistical results on overloading of anchor cables are introduced,and the factors to cause this phenomenon as well as the measures to reduce the load are studied. The formulas to verify design proposal are also given,and the formula to compute stress of unbounded prestressed anchor cables of pressure dispersion style with more anchor heads is derived. These formulas and measures are used to verify design proposal,and evaluate safety of overloading cables.
|
|
Received: 29 November 2011
|
|
|
|
| [1] 周 钟,汤雪峰,廖成刚,等. 锦屏一级水电站地下厂房洞室群围岩变形破坏机制及加固措施研究专题报告[R]. 成都:中国水电工程顾问集团公司成都勘测设计研究院,2009.(ZHOU Zhong,TANG Xuefeng,LIAO Chenggang,et al. Report on surrounding rock mass deformation and support research of the underground powerhouse caverns of Jinping I hydropower station[R]. Chengdu:HydrChina Chengdu Engineering Corporation,2009.(in Chinese))
[2] 中华人民共和国国家能源局. DL-T5057—2009 水工混凝土结构设计规范[S]. 北京:中国电力出版社,2009.(National Energy Administration of People?s Republic of China. DL-T5057—2009 Design specification for hydraulic concrete structures[R]. Beijing:China Electric Power Press,2009.(in Chinese))
[3] 陈赛超,董燕君,鲁晓明,等,锦屏一级水电站引水发电系统及地下厂房安全监测专题报告[R]. 成都:锦屏建设管理局锦屏一级安全监测管理中心,2011.(CHEN Saichao,DONG Yanjun,LU Xiaoming,et al. Special report on the safety monitoring for the water supply and power generation system and the underground powerhouse of Jinping I hydropower station[R]. Chengdou:Jinping I Safety Monitoring and Management Center of Jinping Construction Bureau,2011.(in Chinese))
[4] 李仲奎,周 钟,汤雪峰,等. 锦屏一级水电站地下厂房洞室群稳定性分析与思考[J]. 岩石力学与工程学报,2009,28(11):2 167–2 175. (LI Zhongkui,ZHOU Zhong,TANG Xuefeng,et al. Stability analysis and considerations of underground powerhouse caverns group of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(11):2 167–2 175.(in Chinese))
[5] 程良奎. 岩土锚杆(索)的类型、工作特性及适用条件[R]. [S.l.]:[s.n.],2011.(CHENG Liangkui. Types and performance as well as application of rock bolts(cables)[R]. [S.l.]:[s.n.],2011.(in Chinese))
[6] 周 钟,汤雪峰,廖成刚,等. 锦屏一级水电站地下厂房洞室群施工期围岩稳定与支护设计复核报告[R]. 成都:中国水电工程顾问集团公司成都勘测设计研究院,2010.(ZHOU Zhong,TANG Xuefeng,LIAO Chenggang,et al. Report on the surrounding rock mass stability and support design for the underground powerhouse group caverns construction of Jinping I hydropower project[R]. Chengdu:HydrChina Chengdu Engineering Corporation,2010.(in Chinese))
[7] 钱七虎,方祖烈,伍法权,等. 锦屏一级水电站地下厂房围岩稳定与支护设计咨询报告[R]. 北京:中国岩石力学与工程学会,2010.(QIAN Qihu,FANG Zulie,WU Faquan,et al. The surrounding rock mass stability and reinforcement design consultation report[R]. Beijing:Chinese Society for Rock Mechanics and Engineering,2010.(in Chinese)) |
| [1] |
CHEN Weizhong1*, LIU Xinyu1, 2, YANG Jianping1, WANG Wei1, 2, ZANG Zhonghai3, DING Hongyuan3, ZHANG Zheyuan3, WANG Xiaogang3, SHI Zhengrong1. Development of a large-scale 3D physical model test system for underground energy storage caverns and its model experimental study[J]. , 2026, 45(6): 1615-1628. |
|
|
|
|