| CLASSIFICATION OF SURROUNDING ROCK MASS BY TBM TUNNELING BASED ON IMPROVED DISTANCE DISCRIMINANT ANALYSIS METHOD IN WEST ROUTE OF SOUTH-TO-NORTH WATER TRANSFER PROJECT |
| YAN Changbin,LU Xinjing |
| (Yellow River Engineering Consulting Co. Ltd.,Zhengzhou,Henan 450003,China) |
|
|
|
|
Abstract The shortages of Mahalanobis distance discriminant method and analytic hierarchy process are improved;and the improved distance discriminant analysis method is applied to the classification of surrounding rock mass by TBM tunneling in west route of South-to-North Water Transfer Project. The standard of surrounding rock mass classification cut by TBM is divided into four classes according to the characters of TBM tunneling and some corresponding research results. The improved distance discriminant analysis model of surrounding rock mass classification of tunnel by TBM tunneling is established,which considers five indexes,that are rock strength,petrofabric characters,the distance of structure faces,the included angle between structure face and tunnel axis and quartz content. The linear discriminant functions are obtained by training with a large of case data which come from Duke River-Make River reaches in west route of South-to-North Water Transfer Project. And the classification of waiting discriminant samples is carried out with the discriminant functions. At last,the judged results of improved distance discriminant analysis method are compared with the results of traditional Mahalanobis distance discriminant method,RTBM(rating of TBM) method and RMR(rock mass rating) method. The effectiveness of improved distance discriminant analysis method is verified. The research results show that the improved distance discriminant analysis model has many advantages,such as high prediction accuracy,and provides a new effective method for surrounding rock mass classification of tunnel by TBM tunneling.
|
|
|
|
|
|
| [1] 曹景华,武文相. 谈全断面掘进机的本土化研制[J]. 工程机械,2003,21(1):42–44.(CAO Jinghua,WU Wenxiang. Discussion on localization development and manufacture of TBM[J]. Construction Machinery and Equipment,2003,21(1):42–44.(in Chinese))
[2] KAHRAMAN S. Correlation of TBM and drilling machine performances with rock brittleness [J]. Engineering Geology,2002,65(4):269–283.
[3] BLINDHEIM O T. TBM performance prediction models[J]. Tunnels and Tunneling,2004,36(2):23–27.
[4] 何发亮,谷明成,王石春,等. TBM隧道施工围岩分级方法研究[J].岩石力学与工程学报,2002,21(9):1 350–1 354.(HE Faliang,GU Mingcheng,WANG Shichun,et al. Study on surrounding rock mass classification of tunnel cut by TBM[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(9):1 350–1 354.(in Chinese))
[5] BARTON N. TBM tunneling in jointed and faulted rock[M]. Rotterdam:A. A. Balkema,2000:39–99.
[6] BARTON N. Comments on a critique of QTBM[J]. Tunnels and Tunneling,2005,37(9):16–19.
[7] 李春明,彭耀荣. TBM施工隧洞围岩分类方法的探讨[J]. 中外公路,2006,26(3):235–237.(LI Chunming,PENG Yaorong. Research on classification of surrounding rock mass of the TBM tunneling construction[J]. Journal of China and Foreign Highway,2006,26(3):235–237.(in Chinese))
[8] 吴煜宇,吴湘滨,尹俊涛. 关于TBM施工隧洞围岩分类方法的研究[J]. 水文地质工程地质,2006,33(5):120–122.(WU Yuyu,WU Xiangbin,YIN Juntao. Research with relation to rock classification of TBM tunnels[J]. Hydrogeology and Engineering Geology,2006,33(5):120–122.(in Chinese))
[9] 李苍松,谷 婷,丁建芳,等. TBM施工隧洞围岩级别划分探讨[J]. 工程地质学报,2010,18(5):730–735.(LI Cangsong,GU Ting,DING Jianfang,et al. Discussion on rock classification in TBM construction tunnel[J]. Journal of Engineering Geology,2010,18(5):730–735.(in Chinese))
[10] 中华人民共和国国家标准编写组. GB50487—2008水利水电工程地质勘察规范[S]. 北京:中国计划出版社,2009.(The National Standards Compilation Group of People?s Republic of China. GB50487—2008 Code for engineering geological investigation of water resources and hydropower [J]. Beijing:China Planning Press,2009.(in Chinese))
[11] 王学潮,伍法权. 南水北调西线工程岩石力学与工程地质探索[M].北京:科学出版社,2006:89–98.(WANG Xuechao,WU Faquan. Exploring engineering rock mechanics and engineering geology exploration of South-to-North Water Transfer Project[M]. Beijing:Science Press,2006:89–98.(in Chinese))
[12] 龚秋明,赵 坚,张喜虎. 岩石隧道掘进机的施工预测模型[J]. 岩石力学与工程学报,2004,23(增2):4 709–4 714.(GONG Qiuming,ZHAO Jian,ZHANG Xihu. Performance prediction of hard rock TBM tunneling[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(Supp.2):4 709–4 714.(in Chinese))
[13] 宫凤强,李夕兵. 距离判别分析法在岩体质量等级分类中的应用[J]. 岩石力学与工程学报,2007,26(1):190–194.(GONG Fengqiang,LI Xibing. Application of distance discriminant analysis method to classification of engineering quality of rock masses[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(1):190–193.(in Chinese))
[14] 赵 琳,罗 汉,刘 京. 加权马氏距离判别分析方法及其权值确定–旅游信息服务系统的智能推荐[J]. 经济数学,2007,24(2):185–188.(ZHAO Lin,LUO Han,LIU Jing. Weighted Mahalanobis distance and the weighted-determining method the arithmetic of tourism information recommender system[J]. Mathematics in Economics,2007,24(2):185–188.(in Chinese))
[15] 朱 茵,孟志勇,阚叔愚. 用层次分析法计算权重[J]. 北方交通大学学报,1999,23(5):119–122.(ZHU Yin,MENG Zhiyong,KAN Shuyu. Determination of weight value by AHP[J]. Journal of Northern Jiaotong University,1999,23(5):119–122.(in Chinese))
[16] 秦波涛,李增华. 改进层次分析法用于矿井安全性综合评价[J]. 西安科技学院学报,2002,22(2):126–129.(QIN Botao,LI Zenghua. Application of improved AHP method in safety evaluation of mine[J]. Journal of Xi?an University of Science and Technology,2002,22(2):126–129.(in Chinese)) |
|
|
|