| MECHANICAL CHARACTERISTICS AND SEEPAGE RISK ANALYSIS OF DOUBLE COMPOSITE LININGS IN SOFT SURROUNDING ROCKS |
| XIE Xiaoling1,2,GONG Yaqi1,2,SU Haidong1,2,CHEN Qin1,2 |
| (1. Department of Material and Structure,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China;2. Research Center of Water Engineering Safety and Disaster Prevention of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan,Hubei 430010,China) |
|
|
|
|
Abstract A water diversion tunnel is located in the soft surrounding rocks,and double composite linings are employed during tunnel structure. In order to reveal the mechanical properties of such prestressed double composite linings,the 1∶1 simulation model test and 3D nonlinear finite element method are used. The test processes,including segments assembling,earth filling by layer,inner lining casting,pretension of inner linings,and applied water pressure,are simulated in sequence in the finite element model. Besides,the coupling effects of lining and earth are also taken into consideration. The earth parameters are determined by back analysis method with the displacement of outer lining. The contact between the assembled segments and the inner or the outer lining is also simulated by contact algorithm based on direct control method. The results of finite element method match well with test results,such as displacement and stress of structure,opening of gap. Furthermore,the seepage rise is discussed and corresponding measures are proposed. The results are helpful for the design of similar engineering projects.
|
|
Received: 02 May 2013
|
|
|
|
| [1] 过 迟,吕国梁. 穿黄工程盾构隧洞衬砌结构计算模型研究[J]. 岩土力学,1997,18(增):203–207.(GUO Chi,LU Guoliang. A study on the design and computational model of liner construction for the proposed shield-driven tunnel in the Yellow River—crossing project[J]. Rock and Soil Mechanics,1997,18(Supp.):203–207.(in Chinese))
[2] 章 青,卓家寿. 盾构式输水隧洞的计算模型及其工程应用[J]. 水利学报,1999,(2):19–22.(ZHANG Qing,ZHUO Jiashou. A computational model of shield tunnel for water conveyance[J]. Journal of Hydraulic Engineering,1999,(2):19–22.(in Chinese))
[3] 张厚美,过 迟,付德明. 圆形隧道装配式衬砌接头刚度模型研究[J]. 岩土工程学报,2000,22(3):309–313.(ZHANG Houmei,GUO Chi,Fu Deming. A study on the stiffness model of circular tunnel prefabricated lining[J]. Chinese Journal of Geotechnical Engineering,2000,22(3):309–313.(in Chinese))
[4] 苏海东. 盾构法隧洞的平面非线性有限元分析[J]. 长江科学院院报,2000,17(4):22–26.(SU Haidong. Two-dimensional nonlinear FEM analysis for shield tunneling[J]. Journal of Yangtze River Scientific Research Institute,2000,17(4):22–26.(in Chinese))
[5] 张厚美,过 迟,吕国梁. 盾构压力隧洞双层衬砌的力学模型研究[J]. 水利学报,2001,(4):28–33.(ZHANG Houmei,GUO Chi,LU Guoliang. Mechanical model for shield pressure tunnel with secondary linings[J]. Journal of Hydraulic Engineering,2001,(4):28–33.(in Chinese))
[6] 谢小玲,苏海东. 穿黄隧道双衬砌结构平面非线性有限元分析[J]. 长江科学院院报,2002,19(增1):61–63.(XIE Xiaoling,SU Haidong. Two-dimensional nonlinear FEM analysis for double lined tunnel of Yellow-River-crossing works[J]. Journal of Yangtze River Scientific Research Institute,2002,19(Supp.1):61–63.(in Chinese))
[7] 何英杰,袁 江. 影响盾构隧道衬砌接头刚度的因素[J]. 长江科学院院报,2001,18(1):20–26.(HE Yingjie,YUAN Jiang. Factors affecting joint stiffness of shield tunnel lining[J]. Journal of Yangtze River Scientific Research Institute,2001,18(1):20–26.(in Chinese))
[8] 何英杰,张述琴,吕国梁. 穿黄隧道内外衬联合受力结构模型试验研究[J]. 长江科学院院报,2002,19(增1):64–67.(HE Yingjie,ZHANG Shuqin,LU Guoliang. Experiment research on united action of inside and outside liner of Yellow River-crossing tunnel of Water Transfer Project from South to North[J]. Journal of Yangtze River Scientific Research Institute,2002,19(Supp.1):64–67.(in Chinese))
[9] 黄钟晖. 盾构法隧道管片衬砌纵缝接头受力模型的研究[J]. 地下空间,2003,23(3):296–305.(HUANG Zhonghui. Study on loading model of joints at longitudinal seam of lining segments in shield tunnel[J]. Underground Space,2003,23(3):296–305.(in Chinese))
[10] 谢小玲,苏海东,陈 琴. 穿黄隧洞预应力衬砌结构三维非线性有限元分析[J]. 人民长江,2008,39(24):6–13.(XIE Xiaoling,SU Haidong,CHEN Qing. 3D nonlinear limited element analysis for prestressed linear structure of the tunnel passing through the Yellow River[J]. Yangtze River,2008,39(24):6–13.(in Chinese))
[11] 石修松,程展林,王路君. 岩土本构模型的模糊系统辨识方法[J]. 水利水运工程学报,2010,(3):10–16.(SHI Xiusong,CHENG Zhanlin,WANG Lujun. Identification of geo-material constitutive model using fuzzy system[J].Hydro-science and Engineering,2010,(3):10–16.(in Chinese))
[12] 郭熙灵,饶锡保,何晓民,等. 穿黄工程地基土的工程特性研究[J]. 长江科学院院报,2002,19(增1):83–88.(GUO Xiling,RAO Xibao,HE Xiaomin,et al. Engineering properties of foundation soil of Yellow- River-crossing project[J]. Journal of Yangtze River Scientific Research Institute,2002,19(Supp.1):83–88.(in Chinese))
[13] 冯国栋. 土力学[M]. 北京:水利水电出版社,1986:75.(FENG Guodong. Soil mechanics[M]. Beijing:China Water Power Press,1986:75.(in Chinese))
[14] 谢小玲,苏海东. 大型水电站蜗壳结构优化研究[J]. 人民长江,2011,42(21):32–35.(XIE Xiaoling,SU Haidong. Optimization of spiral structure of large-scale hydropower plant[J]. Yangtze River,2011,42(21):32–35.(in Chinese))
[15] 陈 琴,林绍忠,张 杰. 三峡电站直埋式蜗壳结构试验模型的三维非线性有限元分析[J]. 长江科学院院报,2007,24(2):51–54.(CHEN Qing,LIN Shaozhong,ZHANG Jie. Three-dimensional nonlinear finite element analysis on directly embedded spiral case model of TGP hydroelectric power plant[J]. Journal of Yangtze River Scientific Research Institute,2007,24(2):51–54.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|