| PRE-REINFORCEMENT AND CONSTRUCTION OF TUNNEL IN DRY FINE SAND LAYERS |
| ZHU Zhengguo1,2,SUN Xingliang1,2 |
(1. School of Civil Engineering,Shijiazhuang Tiedao University,Shijiazhuang,Hebei 050043,China;
2. Key Laboratory of Roads and Railway Engineering Safety Control of Ministry of Education,Shijiazhuang Tiedao University,Shijiazhuang,Hebei 050043,China) |
|
|
|
|
Abstract Shangbai large cross-section tunnel in Datong-Xi?an Passenger Dedicated Lines passes through dry fine sand layers. Its construction technologies are difficult and risky. Through the comparative field experiments of close-packed small pipe and deep secant pile of pre-reinforcement,it is found that the deep secant pile pre-reinforcement scheme can effectively control the quick sand and sand gushing during the tunnel excavation. Meanwhile the physico-mechanical parameters of the fine sand layers and consolidation body are obtained by deep secant pile test through laboratory tests,including direct shear tests,triaxial tests and unconfined compression tests. On this basis,through the numerical simulation and field test of tunnel excavation method in dry fine sand layers,the reasonable construction scheme is proposed. The results can provide technical support for Shangbai tunnel construction and reference for similar projects.
|
|
Received: 25 December 2012
|
|
|
|
| [1] 肖昌军,王晓刚. 超前小导管注浆技术在北京地铁10号线劲松站粉细砂地层加固中的应用[J]. 铁道标准设计,2008,(12):231–233.(XIAO Changjun,WANG Xiaogang. Application of grouting technology with advanced small ducts in reinforcement of Jinsong station at powder sand stratum in Beijing Metro #10 line[J]. Railway Standard Design,2008,(12):231–233.(in Chinese))
[2] 弋 琰. 砂土软岩隧道水平旋喷桩施工技术[J]. 铁道建筑技术,2011,(5):107–109.(YI Yan. Construction technology of tunnel level jet grouting pile in soft rock of sandy soil[J]. Railway Construction Technology,2011,(5):107–109.(in Chinese))
[3] 邵 亮. 冻结法技术在双层越江隧道工程联络通道施工中的应用[J]. 建筑施工,2010,32(7):640–642.(SHAO Liang. Technology of freezing method applied to construction of connecting access in project of double-decked river-cross tunnel[J]. Building Construction,2010,32(7):640–642.(in Chinese))
[4] 王 晖,竺维彬,李大勇. 富水砂层中联络通道施工工法及其控制措施[J]. 铁道工程学报,2010,(9):82–87.(WANG Hui,ZHU Weibin,LI Dayong. Construction method and control measure for connecting passage in water-enriched sand bed[J]. Journal of Railway Engineering Society,2010,(9):82–87.(in Chinese))
[5] 徐 立,刘干斌,叶俊能. 海相沉积软土地区人工冻土强度特性试验研究[J]. 水文地质工程地质,2011,38(2):73–78.(XU Li,LIU Ganbin,YE Junneng. Experimental study on mechanical properties of artificial frozen soil in marine sedimentary soft clay[J]. Hydrogeology and Engineering Geology,2011,38(2):73–78.(in Chinese))
[6] 孙星亮,景诗庭. 水平钻孔旋喷注浆加固地层效果研究[J]. 岩石力学与工程学报,1998,17(5):589–593.(SUN Xingliang,JING Siting. Testing study on effect of horizontal drilling jet grouting for soil improvement[J]. Chinese Journal of Rock Mechanics and Engineering,1998,17(5):589–593.(in Chinese))
[7] 刘 钟,柳建国,张 义,等. 隧道全方位高压喷射注浆拱棚超前支护新技术[J]. 岩石力学与工程学报,2009,28(1):59–65.(LIU Zhong,LIU Jianguo,ZHANG Yi,et al. New technique of rotary horizontal jet grouting for arched tunnel pre-support[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(1):59–65.(in Chinese))
[8] 苏立华. 富水浅覆不均匀地层大断面隧道快速施工技术研究[J]. 铁道建筑,2012,(1):51–53.(SU Lihua. Study on rapid construction technology of large-profile tunnel in water-rich,shallow buried and complex stratum[J]. Railway Engineering,2012,(1):51–53.(in Chinese))
[9] 孙国庆,殷九荣. 水平旋喷加固在富水未成岩粉细砂层中的应用[J]. 隧道建设,2012,32(2):213–217.(SUN Guoqing,YIN Jiurong. Application of horizontal jet grouting in water-rich immature fine silty sand strata[J]. Tunnel Construction,2012,32(2):213–217.(in Chinese))
[10] 洪三金,蒋学文,邬 疆. 全断面富水砂层浅埋暗挖隧道施工技术[J]. 建筑施工,2010,32(10):1 060–1 063.(HONG Sanjin,JIANG Xuewen,WU Jiang. Construction technology for shallow bored tunnel with full cross-section of water-rich in sandy stratum[J]. Building Construction,2010,32(10):1 060–1 063.(in Chinese))
[11] 左 鹰. 城区地铁结构近距离穿越古建筑之复合技术探讨[J]. 隧道建设,2012,32(2):228–233.(ZUO Ying. Composite technologies for mining below historic buildings in urban area[J]. Tunnel Construction,2012,32(2):228–233.(in Chinese))
[12] 王社江. 在富水粉砂地层中盾构到达段施工技术[J]. 石家庄铁道大学学报:自然科学版,2012,25(1):53–57.(WANG Shejiang. Construction technology in shield-approaching area in water-rich silt strata[J]. Journal of Shijiazhuang Tiedao University:Natural Science,2012,25(1):53–57.(in Chinese))
[13] 李建军. 干燥粉细砂层大断面斜井转入正洞施工技术[J]. 铁道建筑技术,2012,(1):99–102.(LI Jianjun. Construction technology of large section inclined shaft of dry fine sand layer into the main tunnel[J]. Railway Construction Technology,2012,(1):99–102.(in Chinese))
[14] 孙星亮,王海珍. 水平旋喷固结体力学性能试验及分析[J]. 岩石力学与工程学报,2003,22(10):1 695–1 698.(SUN Xingliang,WANG Haizhen. Testing on physico-mechanical properties of horizontal jet-grouted soilcrete[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(10):1 695–1 698.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|