| RESEARCH ON CONTROL INDICES AND DEFORMATION CHARACTERISTIC OF SHALLOW TUNNEL WITH WEAK INTERLAYER |
| WU Xuping,YANG Xin?an,LI Yacui,ZHANG Jianbo |
| (Key Laboratory of Road and Traffic Engineering of Ministry,Education at Tongji University,Shanghai 200092,China) |
|
|
|
|
Abstract Taking construction section with center cross diagram(CRD) method in Zhongming tunnel of Nanjing—Anqing passenger dedicated line for example,deformation of surrounding rock and control effect of shallow tunnel with weak interlayer were analyzed by comparing with site measurement in different construction conditions,and the quantitative indices of surrounding rock deformation are established. The results show that deformation of surrounding rock could been controlled effectively during excavation by CRD method,and it could been reduced by employing advanced conduit grouting in surrounding rock of vault;Surrounding rock ranges affected by excavating are 3.0-3.5 times of the tunnel diameter in longitudinal section and about 4.0 times in cross-section,showing spatial effect obviously. The laws of surrounding rock deformation remained basically the same in numerical simulation and site measurement and it was more similar to curve of Panet,and the advance core pre-convergence deformation of excavation face is about 45% of total deformation. The limit value of surface and vault subsidence are 40 and 80 mm respectively,and the limit value of rate and relative subsidence are 5 mm per day and 0.64% in vault.
|
|
Received: 26 May 2013
|
|
|
|
| [1] 中铁第四勘察设计院集团有限公司. 新建南京至安庆客运专线隧道施工图设计[R]. 武汉:中铁第四勘察设计院集团有限公司,2008.(China Railway Siyuan Survey and Design Group Co.,Ltd. Two stages construction design of the passenger railway line tunnel from Nanjing to Anqing[R]. Wuhan:China Railway Siyuan Survey and Design Group Co.,Ltd.,2008.(in Chinese))
[2] 中华人民共和国铁道部. 铁建设[2007]200号铁路隧道风险评估与管理暂行规定[S]. 北京:中国铁道出版社,2007.(Ministry of Railway,the People?s Republic of China. Railway construction[2007] No.200 Temporary regulations of rail tunnel risk assessment and management[S]. Beijing:China Railway Publishing House,2007.(in Chinese))
[3] The British Tunnelling Society,The Association of British Insurers. The joint code of practice for risk management of tunnel works in the UK[S]. London:The British Tunnelling Society,2003.
[4] ESKESEN S D,TENGBORG P,KAMPMANN J. Guidelines for tunnelling risk management[J]. Tunnelling and Underground Space Technology,2004,19(3):217–237.
[5] 李晓红. 隧道新奥法及其监控量测技术[M]. 北京:中国科学技术出版社,2002.(LI Xiaohong. NATM and in-situ monitoring technology of tunneling[M]. Beijing:China Science and Technology Press,2002.(in Chinese))
[6] 中华人民共和国行业标准编写组. TB10003—2005 铁路隧道设计规范[S]. 北京:中国铁道出版社,2005.(The Professional Standards Compilation Group of People′s Republic of China. TB10003—2005 Design specification for railway tunnel[S]. Beijing:China Railway Publishing House,2005.(in Chinese))
[7] 中华人民共和国行业标准编写组. JTG D70—2004 公路隧道设计规范[S]. 北京:人民交通出版社,2004.(The Professional Standards Compilation Group of People?s Republic of China. JTG D70—2004 Code for design of road tunnel[S]. Beijing:China Communications Press,2004.(in Chinese))
[8] SOLAK T,ETKESEN Z,SIRIN A,et al. Monitoring during the construction of a shallow urban tunnel and countermeasures[C]// Underground Space-the 4th Dimension of Metropolises. Rodan:Taylor and Francis Croup,2007:917–920.
[9] BIZJAK K F,PETKOVSEK B. Displacement analysis of tunnel support in soft rock around a shallow highway tunnel at Golovec[J]. Engineering Geology,2004,75(1):89–106.
[10] 张延新,蔡美峰,乔 兰,等. 高速公路隧道开挖与支护力学行为研究[J]. 岩石力学与工程学报,2006,25(6):1 284–1 289.(ZHANG Yanxin,CAI Meifeng,QIAO Lan,et al. Study on mechanical response to excavation and support of expressway tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(6):1 284–1 289.(in Chinese))
[11] 王伟锋,毕俊丽. 软岩浅埋隧道施工工法比选[J]. 岩土力学,2007,28(增1):430–436.(WANG Weifeng,BI Junli. Construction project optimizing of soft rock and shallow buried tunnel[J]. Rock and Soil Mechanics,2007,28(Supp.1):430–436.(in Chinese))
[12] JEON J S,MARTIN C D,CHAN D H,et al. Predicting ground conditions ahead of the tunnel face by vector orientation analysis[J]. Tunnelling and Underground Space Technology,2005,20(4):344–355.
[13] 金丰年,钱七虎,隧洞开挖的三维有限元计算[J]. 岩石力学与工程学报,1996,15(3):193–200.(JIN Fengnian,QIAN Qihu. Simulation of three-dimensional tunnel excavation[J]. Chinese Journal of Rock Mechanics and Engineering,1996,15(3):193–200.(in Chinese))
[14] PANET M. Calcul des tunnels par la méthode de convergence- confinement[M]. Paris:Press de l′école Nationale des Ponts et Chaussées,1995.(in Freach)
[15] CHERN J C,SHIAO F Y,YU C W. An empirical safety criterion for tunnel construction[C]// Proceedings of the Regional Symposium on Sedimentary Rock Engineering. Taipei:[s. n.],1998:222–227.
[16] HOEK E. The role of experts in tunneling-experience from Greece and the world[C]// Keynote lecture,Iaonnina,Egnatia Odos Tunnelling Conference. Prague:[s.n.],2001. |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|