|
|
|
| DRILLING PROCESS MONITORING FOR REFINING AND UPGRADING ROCK MASS QUALITY CLASSIFICATION METHODS |
| YUE Z Q |
| (Department of Civil Engineering,University of Hong Kong,Hong Kong,China) |
|
|
|
|
Abstract A new technique,a new method and a new law were put forward for the refinements and upgrading of current engineering rock mass quality classification methods,i.e. the automatic drilling process monitoring(DPM) technique,the fast and direct time-series analysis of the DPM data and the DPM based findings that the curve of the drill bit advancement depth versus the net drilling time can be easily measured and calculated and that it can be represented as a set of connected linear lines. Each linear line zone has a constant slope gradient or drilling speed and represents an intact and homogeneous rock block. The position of the curve slope gradient jump between any two connected linear zones represents a discontinuity plane. DPM can offer a new measurement method and many factual data for the refinements and upgrading. Consequently,the uniaxial compressive strengths,sizes and spatial locations of rock material blocks and the associated discontinuities in underground can be rapidly,effectively,objectively and quantitatively measured and estimated. Case studies are given to illustrate,explain and describe the new technique,the new method and the new law. The approach and its associated equations were presented to refine and upgrade the current RQD,Q,RMR and BQ methods for rock mass quality classifications. The methods for objectively and effectively measure were included and the rock strength,RQD,rock mass integrity,rock hardness and discontinuities were estimated.
|
|
Received: 08 September 2013
|
|
|
|
| [1] 陈祖煜,汪小刚,杨 健,等. 岩质边坡稳定分析:原理•方法•程序[M]. 北京:中国水利水电出版社,2005:82–85.(CHEN Zuyu,WANG Xiaogang,YANG Jian,et al. Rock slope stability analysis:theory,methods and programs[M]. Beijing:China Water Power Press,2005:82–85.(in Chinese))
[2] 佘诗刚,董陇军. 从文献统计分析看中国岩石力学进展[J]. 岩石力学与工程学报,2013,32(3):442–464(SHE Shigang,DONG Longjun. Statistics and analysis of academic publications for development of rock mechanics in China[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(3):442–464.(in Chinese))
[3] 邬爱清,柳赋铮. 国标《工程岩体分级标准》的应用与进展[J]. 岩石力学与工程学报,2012,31(8):1 513–1 523.(WU Aiqing,LIU Fuzheng. Advancement and application of the standard of engineering classification of rock masses[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(8):1 513–1 523.(in Chinese))
[4] 卞昭庆. 我国岩土工程标准规范现状[J]. 工程勘察,2004,(1):16–20,38.(BIAN Zhaoqing. Present situation for codes and standards of geotechnical engineering in China[J]. Geotechnical Investigation and Surveying,2004,(1):16–20,38.(in Chinese))
[5] 岳中琦. 地下工程事故紧急搜救的快速气冲钻孔和实时监测[J]. 黑龙江科技学院学报,2012,22(4):403–408.(YUE Zhongqi. Monitoring and air-driven fast-track drilling designed for emergent searching and rescuing operation in buried underground space[J]. Journal of Heilongjiang Institute of Science and Technology,2012,22(4):403–408.(in Chinese))
[6] DAHL F,BRULAND A,JAKOBSEN P D,et al. Classifications of properties influencing the drillability of rocks,based on the NTNU/ SINTEF test method[J]. Tunnelling and Underground Space Technology,2012,28:150–158.
[7] 曹来勇,王振升,何炳振. 随钻测量与井筒油气评价技术[M]. 东营:石油大学出版社,1997:1–83.(CAO Laiyong,WANG Zhensheng,HE Binzhen. Measurements while drilling and well oil and gas evaluation techniques[M]. Dongying:China University of Petroleum Press,1997:1–83.(in Chinese))
[8] 胡小林,黄麟森,王清峰. 煤矿井下随钻测量技术的应用研究[J]. 矿冶,2012,21(4):89–92.(HU Xiaolin,HUANG Linsen,WANG Qingfeng. Study of measurement while drilling technology application in coal mine underground[J]. Mining and Metallurgy,2012,21(4):89–92.(in Chinese))
[9] GUI M W,SOGA K,BOLTON M D,et al. Instrumented borehole drilling for subsurface investigation[J]. Journal of Geotechnical and Geoenvironmental Engineering ASCE,2002,128(4):283–291.
[10] SCHUNNESSON H. RQD predictions based on drill performance parameters[J]. Tunnelling and Underground Space Technology,1996,11(3):345–351
[11] 陈铁林,张顶立. “矿研”多功能钻机的特点及应用[J]. 现代隧道技术,2009,46(4):58–63.(CHEN Tielin,ZHANG Dingli. Characteristics of KOKEN multifunction drilling rig and its application in China[J]. Modern Tunneling Technology,2009,46(4):58–63.(in Chinese))
[12] 岳中琦,李焯芬,罗锦添,等. 香港大学钻孔数字监测仪在土钉加固斜坡工程中的应用[J]. 岩石力学与工程学报,2002,21(11):1 685–1 690.(YUE Z Q,LEE C F,LAW K T,et al. Use of HKU drilling process monitor in slope stabilization[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(11):1 685–1 690.(in Chinese))
[13] YUE Z Q,LEE C F,LAW K T,et al. Automatic monitoring of rotary-percussive drilling for ground characterization—illustrated by a case example in Hong Kong[J]. International Journal of Rock Mechanics and Mining Sciences,2004,41:573–612.
[14] 岳中琦. 钻孔过程数字自动监测(DPM)以现场连续测试各种软硬岩土力学强度和空间分布[C]// 第二届全球华人岩土工程论坛. 南京:河海大学,2005:85–90.(YUE Zhongqi. Automatic drilling process monitoring for soil and rock strengths and their spatial distribution in ground[C]// Proceedings of the 2nd World Forum of Chinese Scholars in Geotechnical Engineering. Nanjing:Hohai University,2005:85–90.(in Chinese))
[15] YUE Z Q,GAO W,CHEN J,et al. Drilling process monitoring for a wealth of extra factual data from drillhole site investigation[C]// Proceedings of the 10th International Congress of the International Association of Engineering Geology(IAEG2006 Engineering Geology for Tomorrow?s Cities). Nottingham,United Kingdom:[s. n.],2006:1–10.
[16] YUE Z Q,CHEN J,GAO W. Automatic drilling process monitoring(DPM) for in-situ characterization of weak rock mass strength with depth[C]// Proceedings of the 1st Canada-US Rock Mechanics Symposium(Rock Mechanics:Meeting Society?s Challenges and Demands). Vancouver,Canada:[s. n.],2007:199–206.
[17] 陈 健,岳中琦. 基于钻孔过程监测系统(DPM)全钻分析的钻孔过程塌孔监测[J]. 工程勘察,2010,(11):26–31.(CHEN Jian,YUE Zhongqi. Hole collapse detection based on full drill analysis of DPM system[J]. Geotechnical Investigation and Surveying,2010,(11):26–31.(in Chinese))
[18] 陈 健,岳中琦. 基于DPM系统的风化岩软弱区定位以及性质描述[J]. 工程地质学报,2011,19(1):93–98.(CHEN Jian,YUE Zhongqi. DPM system based detection and characterization of weak zones in weathered rock[J]. Journal of Engineering Geology,2011,19(1):93–98.(in Chinese))
[19] 高 伟,岳中琦,李爱国. 全自动钻孔过程监测技术在工程勘察中的应用探讨[J]. 工程勘察,2012,(2):27–32.(GAO Wei,YUE Zhongqi,LI Aiguo. Discussion on the application of automatic drilling process monitoring in site investigation[J]. Geotechnical Investigation and Surveying,2012,(2):27–32.(in Chinese))
[20] LAM J S,SIU C K. Evaluation of Application of drilling process monitoring(DPM) techniques for soil nailing works,GEO report No. 189[M]. Hong Kong:Geotechnical Engineering Office,HKSAR Government,2004:1–43.
[21] Halcrow China Limited. Interim briefing note:Key observations of the use of drilling process monitoring(DPM) during soil nailing works at feature Nos. 2SE-C/C194 and 2SEC/C198[R]. Hong Kong:Geotechnical Engineering Office,HKSAR Government,2005:1–10.
[22] Geotechnical Engineering Office. Guide to soil nail design and construction(Geoguide 7)[M]. Hong Kong:The Government of the Hong Kong Special Administrative Region,2008:73–73.
[23] HUANG S L,WANG Z W. The mechanics of diamond core drilling of rocks[J]. International Journal of Rock Mechanics and Mining Sciences,1997,34(3/4):612.
[24] KAHRAMAN S. Rotary and percussive drilling prediction using regression analysis[J]. International Journal of Rock Mechanics and Mining Sciences,1999,36(7):981–989. |
|
|
|