| RISK MANAGEMENT OF URBAN TUNNEL OF LARGE CROSS-SECTION IN WHOLE CONSTRUCTION PROCESS |
| LI Zhong1,2,WEI Jia1,2,ZHU Yanpeng1,2 |
| (1. Key Laboratory of Disaster Prevention and Mitigation in Civil Engineering of Gansu Province,Lanzhou University of Technology,Lanzhou,Gansu 730050,China;2. Northwest Center for Disaster Mitigation in Civil Engineering of Ministry of Education,Lanzhou University of Technology,Lanzhou,Gansu 730050,China) |
|
|
|
|
Abstract A framework of risk management including risk identification,estimation,evaluation and control was proposed for the safety in the whole construction process of urban tunnels with large cross-sections. Taking the North Ring Road,Jiuzhou tunnel for example,the comprehensive evaluation with fuzzy method was applied to determine the set of the levels of risk factors,the set of risk evaluation and the set of membership. The risks in the whole construction process were identified,analyzed and evaluated. The risk tracking and control are achieved with the framework of risk management proposed in the whole process of construction and avoids the weakness of the scattered,dispersed,fragmented risk management mode which was used in the previous projects.
|
|
Received: 04 March 2014
|
|
|
|
| [1] 刘 辉,张智超,王林娟. 2004–2008年我国隧道施工事故统计分析[J]. 中国安全科学学报,2010,20(1):96–100.(LIU Hui,ZHANG Zhichao,WANG Linjuan. Statistical analysis on safety accidents of tunnel construction from 2004 to 2008 in China[J]. China Safety Science Journal,2010,20(1):96–100.(in Chinese))
[2] STURK R,OLSSON L,JOHANSSON J. Risk and decision analysis for large underground projects,as applied to the Stockholm ring road tunnels[J]. Tunneling and Underground Space Technology,1996,11(2):157–164.
[3] 张少夏,黄宏伟. 影响隧道施工工期的风险分析[J]. 地下空间与工程学报,2005,1(6):936–939.(ZHANG Shaoxia,HUANG Hongwei. Risk analysis of tunneling work period[J]. Chinese Journal of Underground Space and Engineering,2005,1(6):936–939.(in Chinese))
[4] 刘 婧,周 伟. 山岭隧道施工的动态风险管理模型研究[J]. 安全与环境学报,2011,11(3):195–199.(LIU Jing,ZHOU Wei. Dynamic rick management model for the construction of mountain tunnel[J]. Journal of Safety and Environment,2011,11(3):195–199.(in Chinese))
[5] 仇文革,李俊松. 小净距大跨度公路隧道安全风险管理与施工技术[J]. 现代隧道技术,2011,48(5):18–22.(QIU Wenge,LI Junsong. Security risk management and construction technology for a highway tunnel with a short clear distance and a large span[J]. Modern Tunnelling Technology,2011,48(5):18–22.(in Chinese))
[6] 冯卫明. 某大断面山岭隧道施工安全风险评估[J]. 公路交通科技:应用技术版,2012,88(4):229–232.(FENG Weiming. A large section of mountain tunnel construction safety risk assessment[J]. Journal of Highway and Transportation Research and Development:Applied Technology,2012,88(4):229–232.(in Chinese))
[7] 郭 鹏,李志强,张凤爱,等. 承秦高速公路隧道施工风险管理研究[J]. 交通标准化,2012,1(1):95–99.(GUO Peng,LI Zhiqiang,ZHANG Feng?ai,et al. Risk management on Chengde-Qinhuangdao expressway tunnel construction[J]. Communications Standardization,2012,1(1):95–99.(in Chinese))
[8] 刘 伟. 山岭公路隧道施工风险评价及其应用研究[硕士学位论文][D]. 西安:长安大学,2011.(LIU Wei. Mountain highway tunnel construction risk assessment and its application[M. S. Thesis][D]. Xi?an:Chang?an University,2011.(in Chinese))
[9] 夏润禾,徐向叶. 铁路软弱围岩隧道施工安全风险管理技术与实践[J]. 地下空间与工程学报,2011,7(增2):1 753–1 757.(XIA Runhe,XU Xiangye. Construction safety risk management technique and practice of soft rock railway tunnel[J]. Chinese Journal of Underground Space and Engineering,2011,7(Supp.2):1 753–1 757. (in Chinese))
[10] 李利平,李术才,陈 军,等. 基于岩溶突涌水风险评价的隧道施工许可机制及其应用研究[J]. 岩石力学与工程学报,2011,30(7):1 345–1 355.(LI Liping,LI Shucai,CHEN Jun,et al. Construction license mechanism and its application based on karst water inrush risk evaluation[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(7):1 345–1 355.(in Chinese))
[11] 交通运输部工程质量监督局. 公路桥梁和隧道工程施工安全风险评估制度及指南解析[M]. 北京:人民交通出版社,2011:11. (Ministry of Transport Construction Quality Supervision Bureau. Interpretation of system and guidelines on highway bridge and tunnel construction safety engineering risk assessment[M]. Beijing:China Communications Press,2011:11.(in Chinese))
[12] 梁青槐,贾俊峰. 基于工程保险的土建工程施工安全风险管理模式研究[J]. 中国安全科学学报,2005,15(6):54–56.(LIANG Qinghuai,JIA Junfeng. Study on risk management mode of civil engineering construction based on project insurance[J]. China Safety Science Journal,2005,15(6):54–56.(in Chinese)) |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|