[1] |
黄雄军. 岩溶隧道突水突泥影响因素及对策[J]. 铁道工程学报,2013,(1):45-48.(HUANG Xiongjun. Influence Factors of Water Bursting and Mud Bursting of Karst Tunnels and Its Countermeasures[J]. Journal of Railway Engineering Society,2013,(1):45-48.(in Chinese))
|
[2] |
王秀英,谭忠盛,王梦恕,等. 宜万铁路岩溶隧道防排水原则及技术研究[J]. 中国工程科学,2010,12(8):107-112.(WANG Xiuying,TAN Zhongsheng,WANG Mengshu,et al. Study on the waterproof and drainage principle and technology for karst tunnels on Yichang-Wanzhou Railway[J]. Engineering Sciences,2010,12(8):107-112.(in Chinese))
|
[3] |
王 媛,陆宇光,倪小东,等. 深埋隧洞开挖过程中突水与突泥的机理研究[J]. 水利学报,2011,42(5):595-601.(WANG Yuan,LU Yuguang,NI Xiaodong,et al. Study on mechanism of water burst and mud burst in deep tunnel excavation[J]. Journal of Hydraulic Engineering,2011,42(05):595-601.(in Chinese))
|
[4] |
张民庆,黄鸿健,张生学,等. 宜万铁路马鹿箐隧道1•21突水突泥抢险治理技术[J]. 铁道工程学报,2008,(11):49-56.(ZHANG Minqing,HUANG Hongjian,ZHANG Shengxue. Treatment technology for water and mud bursting on 1•21 in Maluqing tunnel of Yichang-Wanzhou Railway[J]. Journal of Railway Engineering Society,2008,(11):49-56.(in Chinese))
Your browse does not support frame! |