[1] |
周晓敏,王梦恕,陶龙光,等. 北京地铁隧道水平冻结和暗挖施工模型试验与实测研究[J]. 岩土工程学报,2003,25(6):676-679. (ZHOU Xiaomin,WANG Mengshu,TANG Longguang,et al. Model test and prototype observation on artificial ground freezing and tunneling of Beijing subway[J]. Chinese Journal of Geotechnical Engineering,2003,25(6):676-679.(in Chinese))
|
[2] |
岳丰田,仇培云,杨国祥,等. 复杂条件下隧道联络通道冻结施工设计与实践[J]. 岩土工程学报,2006,28(5):660-663.(YUE Fengtian,QIU Peiyun,YANG Guoxiang,et al. Design and practice of freezing method applied to connection aisle in tunnel under complex conditions[J]. Chinese Journal of Geotechnical Engineering,2006,28(5):660-663.(in Chinese))
|
[3] |
蔡海兵,程 桦,彭立敏,等. 地铁双线隧道水平冻结位移场的模型试验[J]. 岩石力学与工程学报,2009,28(10):2 088-2 095.(CAI Haibing,CHENG Hua,PENG Limin,et al. Model test on displacement field of double-route metro constructed with horizontal freezing method[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(10):2 088-2 095.(in Chinese))
Your browse does not support frame! |