| INDUCEMENT MECHANISM AND CASE ANALYSIS OF TECTONIC ROCKBURST IN JINPING II DEEP BURIED TUNNEL |
| ZHANG Chunsheng1,LIU Ning1,2,CHU Weijiang1,NI Shaohu1 |
(1. PowerChina Huadong Engineering Corporation Limited,Hangzhou,Zhejiang 310014,China;
2. Pumped Storage Engineering Center of Zhejiang Province,Hangzhou,Zhejiang 310014,China) |
|
|
|
|
Abstract The total length of Jinping II deep buried tunnel cross different geological units is more than 16 km. In the process of excavation,rockburst was controlled by the geological structure conditions and the local stress field. The tectonic rockburst is directly affected by the geological tectonics. Based on the systematic analysis of the forefront research results about rockburst in deep engineering home and abroad,and combined with the rockburst revealed by a large number of cases in Jinping II deep buried tunnel engineering,the tectonic rockbursts were further subdivided into end tectonic,slip tectonic and strain tectonic. The inverse analysis of the rockburst was carried out with the discrete element program and related risk evaluation index of rockburst. The mechanism of different kinds of tectonic rockburst in deep buried tunnel engineering was revealed,and the key controlling factors of rockburst and control mechanisms of various factors were analyzed. Finally,the corresponding control schemes were put forward according to the different types of tectonic rockburst.
|
|
|
|
|
|
| [1] 冯夏庭,陈炳瑞,张传庆,等. 岩爆孕育过程的机制、预警与动态调控[M]. 北京:科学出版社,2013:1–3.(FENG Xiating,CHEN Bingrui,ZHANG Chuanqing,et al. Mechanism,warning and dynamic control of rockburst development process[M]. Beijing:Science Press,2013:1–3.(in Chinese))
[2] 唐春安. 岩石的破裂、失稳及岩爆[C]// 王思敬,杨志法,傅冰骏编. 中国岩石力学与工程世纪成就. 南京:河海大学出版社,2004:324–335.(TANG Chun?an. Fracture,instability and rockburst of rocks[C]// WANG Sijing,YANG Zhifa,FU Bingjun ed. Centurial Achievement of Rock Mechanics and Engineering in China. Nanjing:Hohai University Press,2004:324–335.(in Chinese))
[3] 周 辉,孟凡震,张传庆,等. 深埋硬岩隧洞岩爆的结构面作用机制分析[J]. 岩石力学与工程学报,2015,34(4):1–8.(ZHOU Hui,MENG Fanzhen,ZHANG Chuanqing,et al. Analysis of the structural plane controlling mechanism on rockburst in deep hard rock tunnels[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(4): 1–8.(in Chinese))
[4] 朱焕春,吴家耀,朱永生,等. 锦屏二级水电站引水隧洞岩爆专题研究——2008~2010年阶段性总结报告[R]. 武汉:Itasca(武汉)咨询有限公司,2010.(ZHU Huanchun,WU Jiayao,ZHU Yongsheng,et al. Research on rockburst of Jinping II hydropower station diversion tunnel—2008–2010 summary report[R]. Wuhan:Itasca Consulting Co.,Ltd.,2010.(in Chinese))
[5] 刘 宁,张春生,褚卫江,等. 深埋大理岩力学特性对岩爆发生条件的影响分析[J]. 岩土力学,2013,34(9):2 638–2 642.(LIU Ning,ZHANG Chunsheng,CHU Weijiang,et al. Influence of mechanical characteristics of deep-buried marble on rockburst occurrence conditions[J]. Rock and Soil Mechanics,2013,34(9):2 638–2 642.(in Chinese))
[6] ORTLEPP W D,STACEY T R. Rockburst mechanisms in tunnels and shafts[J]. Tunnelling and Underground Space Technology,1994,9(1):59–65.
[7] PETER K,KAISER,CAI M. Design of rock support system under rockburst condition[J]. International Journal of Rock Mechanics and Mining Sciences,2012,4(3):215–227.
[8] RYDER J A. Excess shear stress in the assessment of geologically hazardous situations[J]. Journal of the South African Institute of Mining and Metallurgy,1988,88(1):27–39.
[9] 冯夏庭,陈炳瑞,明华军,等. 深埋隧洞岩爆孕育规律与机制:即时型岩爆[J]. 岩石力学与工程学报,2012,31(3):433–444.(FENG Xiating,CHEN Bingrui,MING Huajun,et al. Evolution law and mechanism of rockbursts in deep tunnels:immediate rockburst[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(3):433–444.(in Chinese))
[10] 陈炳瑞,冯夏庭,明华军,等. 深埋隧洞岩爆孕育规律与机制:时滞型岩爆[J]. 岩石力学与工程学报,2012,31(3):561–569.(CHEN Bingrui,FENG Xiating,MING Huajun,et al. Evolution law and mechanism of rockbursts in deep tunnel:time delayed rockburst[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(3):561–569.(in Chinese))
[11] COOK N G W. The failure of rock[J]. International Journal of Rock Mechanics and Mining Sciences and Geomechanics Abstracts,1965,2(4):389–395.
[12] KAISER P K,MCCREATH D R,TANNANT D D. Canadian rockburst support handbook:volume 2:rockburst support[R]. Sudbury,Ontario:Canadian Mining Industry Research Organization— CAMIRO,1996.
[13] KAISER P K,TANNANT D D,MCCREATH D R. Drift support in burst-prone ground[J]. CIM Bulletin,1996,89(3):131–138. |
| [1] |
MAO Yuting1, 2, HE Manchao1, 2, LIU Fangzhou3, BAI Xing4, YANG Xiaojie1, 2, TAO Zhigang1, 2*. Development and application of a large-scale physical model system for tunnel creep testing[J]. , 2026, 45(6): 1627-1638. |
|
|
|
|