Failure characteristics,laws and mechanisms of rock spalling in excavation of large-scale underground powerhouse caverns in Baihetan |
LIU Guofeng1,FENG Xiating1,JIANG Quan1,DUAN Shuqian1,YAO Zhibin2,PEI Shufeng1,DUAN Xingping3,ZHOU Mengxia3 |
(1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences,Wuhan,Hubei 430071,China;2. Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines,Northeastern University,Shenyang,Liaoning 110819,China;3. China Three Gorges Corporation,Beijing 100038,China) |
|
|
Abstract The underground powerhouse caverns of hydropower station at Baihetan of Jinsha river is under construction currently and is large in size and complex in geological environment. Spalling failure of local surrounding rock occurred frequently in the excavation of the first layer of the left and right powerhouse. An overall summary and a deep analysis of the mechanism of rock spalling failure in basalts was made combined with the geological,construction,testing,experimental and numerical data. Firstly,the characteristics and laws of spalling failure,including the failure forms,the morphological characteristics,the spatial location,the scale of destruction,the lagging,the failure development process,the lithology and the support status were summarized. Secondly,the influence of the geo-stress,rock structure,lithology,construction factors on the surrounding rock failure were fully discussed. Finally,comprehensive analyses were made to reveal the mechanisms of spalling failure.
|
|
|
|
|
[1] |
黄润秋,黄 达,段绍辉,等. 锦屏I级水电站地下厂房施工期围岩变形开裂特征及地质力学机制研究[J]. 岩石力学与工程学报,2011,30(1):23-35.(HUANG Runqiu,HUANG Da,DUAN Shaohui,et al. Geomechanics mechanism and characteristics of surrounding rock mass deformation failure in construction phase for underground powerhouse of Jinping I hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(1):23-35.(in Chinese))
|
[2] |
侯哲生,龚秋明,孙卓恒. 锦屏二级水电站深埋完整大理岩基本破坏方式及其发生机制[J]. 岩石力学与工程学报,2011,30(4):727-732.(HOU Zhesheng,GONG Qiuming,SUN Zhuoheng. Primary failure types and their failure mechanisms of deep buried and intact marble at Jinping II hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(4):727-732.(in Chinese))
|
[3] |
曾冬霞. 西藏怒江松塔水电站坝区岩饼及片帮形成机制研究[硕士学位论文][D]. 成都:成都理工大学,2014.(ZENG Dongxia. The study on core discing and spalling formation mechanism of Songta hydropower station in Nu river of Tibet[M. S. Thesis][D]. Chengdu:Chengdu University of Technology,2014.(in Chinese))
Your browse does not support frame! | | | |