| Studies on influence of blast-created free face on ground vibration in slope blasts with millisecond-delays |
| LENG Zhendong1,2,LU Wenbo1,2,HU Haoran1,2,XIE Lixiang1,2,CHEN Ming1,2 |
(1. State Key Laboratory of Water Resources and Hydropower Engineering Science,Wuhan University,Wuhan,Hubei 430072,China;2. Key Laboratory of Rock Mechanics in Hydraulic Structural Engineering,Ministry of Education,
Wuhan University,Wuhan,Hubei 430072,China) |
|
|
|
|
Abstract Studies on the influence of blast-created free face on ground vibration in slope blasts with millisecond-delays are very significant for optimization and safety control in blasting excavation. A multiple-row bench blast test at Baihetan Hydropower Station was conducted to compare the blast-induced ground vibration from the first and followed delay in the same row. A SPH-FEM coupled model was also developed to simulate the fragmentation process and the blasting vibrations from different delays in the same row. The simulated results agreed well with the experiment results. If the charge weight and the blasting geometry parameters were the same in each blast delay,the ground vibration induced by the first delay will be larger than that of the followed one. The study indicated that the effect of the blast-created free face should be considered in the blasting design. From the perspective of vibration control,the charge weight of the first delay in every row should be less than that of the followed delays in the same row.
|
|
|
|
|
|
[1] MCGARR A. Estimating ground motions for small nearby earthquakes[C]// Seismic Design of Embankments and Caverns. New York:ASCE,1983:113–127.
[2] 罗 忆,卢文波,陈 明,等. 爆破振动安全判据研究综述[J]. 爆破,2010,1(1):14–22.(LUO Yi,LU Wenbo,CHEN Ming,et al. View of research on safety criterion of blasting vibration[J]. Blasting,2010,1(1):14–22.(in Chinese))
[3] 钟冬望,何 理,操 鹏,等. 基于精确毫秒延时控制的爆破降振试验研究[J]. 煤炭学报,2015,40(增1):107–112.(ZHONG Dongwang,HE Li,CAO Peng,et al. Experimental study of reducing vibration intensity based on controlled blasting with precise time delay[J]. Journal of China Coal Society,2015,40(Supp.1):107–112. (in Chinese))
[4] 李新平,孟 建,徐鹏程. 溪洛渡水电站出线竖井爆破振动效应研究[J]. 岩土力学,2011,32(2):474–480.(LI Xinping,MENG Jian,XU Pengcheng. Study of blasting seismic effects of cable shaft in Xiluodu hydropower station[J]. Rock and Soil Mechanics,2011,32(2):474–480.(in Chinese))
[5] 蒋 楠,周传波,平 雯,等. 岩质边坡爆破振动速度高程效应[J]. 中南大学学报,2014,45(1):237–243.(JIANG Nan,ZHOU Chuanbo,PING Wen,et al. Altitude effect of blasting vibration velocity in rock slopes[J]. Journal of Central South University,2014,45(1):237–243.(in Chinese))
[6] 张志呈,张顺朝. 论工程爆破中自由面与爆破效果的关系[J]. 西南科技大学学报,2003,18(3):30–33.(ZHANG Zhicheng,ZHANG Shunchao. On the relationship between the free face and the blasting effect of engineering blasting[J]. Journal of Southwest University of Science and Technology,2003,18(3):30–33.(in Chinese))
[7] 邵珠山,乔汝佳,王新宇. 临空面对爆破震动强度影响的数值研究[J]. 地下空间与工程学报,2012,8(5):1 052–1 058.(SHAO Zhushan,QIAO Rujia,WANG Xinyu. Numerical investigation into effect of free surface on the response of blasting induced vibration[J]. Chinese Journal of Underground Space and Engineering,2012,8(5):1 052–1 058. (in Chinese))
[8] JIMENO C L,JIMENO E L,CARCEDO F J A. Drilling and blasting of rocks[M]. Rotterdam:Balkema A A,1995:183–184.
[9] RODGER J. The effect of confinement on ground vibration amplitude[C]// Proceedings of the Annual Conference on Explosives and Blasting Technique. Cleveland:ISEE,2003:131–144.
[10] HEILIG J,ZOITSAS A,COX N. Free face blasting: Is it the best for quarrying[C]// Proceedings of the 41st Annual Conf. Institute of Quarrying. Australia:Institute of Quarrying,1997:33–44.
[11] BLAIR D P,MINCHINTON A. On the damage zone surrounding a single blasthole[J]. Fragblast International Journal for Blasting and Fragmentation,1997,1(1):59–72.
[12] 周传波,谷任国,罗学东. 坚硬岩石一次爆破成井掏槽方式的数值模拟研究[J]. 岩石力学与工程学报,2005,24(13):2 298–2 303. (ZHOU Chuanbo,GU Renguo,LUO Xuedong. Numerical simulation on cutting mode of shaft excavation by one-step deep-hole blasting in hard rock[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(13):2 298–2 303.(in Chinese))
[13] 杨年华,张志毅. 隧道爆破振动控制技术研究[J]. 铁道工程学报,2010,27(1):82–86.(YANG Nianhua,ZHANG Zhiyi. Research on the control technology for tunnel blasting vibration[J]. Journal of Railway Engineering Society,2010,27(1):82–86.(in Chinese))
[14] 严 鹏,卢文波,罗 忆,等. 基于小波变换时–能密度分析的爆破开挖过程中地应力动态卸载振动到达时刻识别[J]. 岩石力学与工程学报,2009,28(增1):2 836–2 844.(YAN Peng,LU Wenbo,LUO Yi,et al. Identification of arriving time of vibration induced by geostress dynamic unloading during blasting-excavation employing method of time-energy analysis based on wavelet transform[J]. Chinese Journal of Rock Mechanics and Engineering,2009,28(Supp.1):2 836–2 844.(in Chinese))
[15] 池恩安,赵明生,梁开水,等. 自由面数量对爆破地震波时频特性影响分析[J]. 爆破,2013,30(2):16–20.(CHI Enan,ZHAO Mingsheng,LIANG Kaishui,et al. Influence of number of free surface on time-frequency characteristics of blasting seismic wave[J]. Blasting,2013,30(2):16–20.(in Chinese))
[16] KOHLER E W,RORKE A J. High speed photographic studies in surface blasting[C]// The 17th International Conference on High Speed Photography and Photonics. Bellingham:International Society for Optics and Photonics,1987:381–394.
[17] 黄苹苹. 露天台阶深孔爆破鼓包发展过程的摄影观测[J]. 矿业研究与开发,1989,9(4):95–98.(HUANG Pingping. Photo observation on instantaneous movement of rocks in pit bench deep-hole blasting[J]. Mining Research and Development,1989,9(4):95–98.(in Chinese)
[18] 胡英国,卢文波,陈 明,等. SPH-FEM耦合爆破损伤分析方法的实现与验证[J]. 岩石力学与工程学报,2015,34(增1):2 740–2 748. (HU Yingguo,LU Wenbo,CHEN Ming,et al. Implementation and verification of SPH-FEM coupling blasting damage analytical method[J]. Chinese Journal of Rock Mechanics and Engineering,2015,34(Supp.1):2 740–2 748.(in Chinese))
[19] 黄永辉,刘殿书,李胜林,等. 高台阶抛掷爆破速度规律的数值模拟[J]. 爆炸与冲击,2014,34(4):495–500.(HUANG Yonghui,LIU Dianshu,LI Shenglin,et al. Numerical simulation on pin-point blasting of sloping surface[J]. Explosion and Shock Waves,2014,34(4):495–500.(in Chinese))
[20] 王高辉,张社荣,卢文波,等. 水下爆炸冲击荷载下混凝土重力坝的破坏效应[J]. 水利学报,2015,46(2):723–731.(WANG Gaohui,ZHANG Sherong,LU Wenbo,et al. Damage effects of concrete gravity dams subjected to underwater explosion[J]. Journal of Hydraulic Engineering,2015,46(2):723–731.(in Chinese))
[21] 李新平,陈俊桦,李友华,等. 溪洛渡电站地下洞室群爆破地震效应的研究[J]. 岩石力学与工程学报,2010,29(3):493–501.(LI Xinping,CHEN Junhua,LI Youhua,et al. Study of blasting seismic effects of underground chamber group in Xiluodu hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(3):493–501.(in Chinese))
[22] 毕卫国,石 崇. 爆破振动速度衰减公式的优化选择[J]. 岩土力学,2004,25(增1):99–102.(BI Weiguo,SHI Chong. Optimization selection of blasting vibration velocity attenuation formulas[J]. Rock and Soil Mechanics,2004,25(Supp.1):99–102.(in Chinese)) |
|
|
|