| Study on formation causes of gallery cracks in Dagangshan high arch dam based on microseismic monitoring |
| MA Ke1,2,ZHUANG Duanyang1,2,TANG Chun?an1,2,JIN Feng3,TANG Shibin1,2 |
(1. Institute of Rock Instability and Seismicity Research,Dalian University of Technology,Dalian,Liaoning 116024,China;
2. State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian,Liaoning 116023,China;
3. State Key Laboratory of Hydroscience and Hydraulic Engineering,Tsinghua University,Beijing 100084,China) |
|
|
|
|
Abstract Multiple deep cracks appeared at the top arch of galleries in Dagangshan high arch dam before the impoundment. Cracking characteristic around the access gallery at E.L. 979 m,foundation gallery at E.L. 940 m and drainage gallery at E.L. 937 m before and after the impoundment was analyzed using the installed microseismic monitoring system in the high arch dam. The process of crack inducement was reproduced and the real cause of cracking in galleries was studied. The results show that the microseismic activities in galleries are significantly coherent to the water level. Before the impoundment,the microseismicity of the gallery top arch of dam heel area was strong which exceeds its cracking limit,thus inducing gallery cracks in the cross sections of river. After the impoundment,with the rising of water level,the gallery cracks in the area of arch dam heel tends to be stable while galleries in arch dam toe area tend to crack. The trend of the cracking which transferrs from the dam heel area to the dam toe aera during the impoundment process was revealed. It is recommended to keep a close eye on the damage conditions of concrete in arch dam toe area during the impoundment period.
|
|
|
|
|
|
[1] ZHANG G X,LIU Y,ZHOU Q J. Study on real working performance and overload safety factor of high arch dam[J]. Science China Series E:Technological Science,2008,51(Supp.2):48–59.
[2] JIN F,HU W,PAN J,et al. Comparative study procedure for the safety evaluation of high arch dams[J]. Computers and Geotechnics,2011,38(3):306–317.
[3] REN Q W,XU L Y,WAN Y H. Research advance in safety analysis methods for high concrete dam[J]. Science China Series E:Technological Sciences,2007,50(Supp.1):62–78.
[4] 朱伯芳. 建设高质量永不裂缝拱坝的可行性及实现策略[J]. 水利学报,2006,(10):1 155–1 162.(ZHU Bofang. On the feasibility of building high quality arch dams without cracking and the relevant techniques[J]. Journal of Hydraulic Engineering,2006,(10):1 155– 1 162.(in Chinese))
[5] 刘杏红,周创兵,常晓林,等. 大体积混凝土温度裂缝扩展过程模拟[J]. 岩土力学,2010,31(8):2 666–2 676.(LIU Xinghong,ZHOU Chuangbing,CHANG Xiaolin,et al. Simulation of mass concrete temperature cracking propagation process[J]. Rock and Soil Mechanics,2010,31(8):2 666–2 676.(in Chinese))
[6] 黄 云,金 峰,王光纶,等. 高拱坝上游坝踵裂缝稳定性及其扩展[J]. 清华大学学报:自然科学版,2002,(4):555–559.(HUANG Yun,JIN Feng,WANG Guanglun,et al. Stability and propagation of cracks at the heel of high arch dams[J]. Journal of Tsinghua University:Nature Science,2002,(4):555–559.(in Chinese))
[7] 陈胜宏,汪卫明,徐明毅,等. 小湾高拱坝坝踵开裂的有限单元法分析[J]. 水利学报,2003,(1):66–71.(CHEN Shenghong,WANG Weiming,XU Mingyi,et al. Finite element analysis of the crack propagation in high arch dam heel of Xiaowan project[J]. Journal of Hydraulic Engineering,2003,(1):66–71.(in Chinese))
[8] 何 柱,刘耀儒,杨 强,等. 基于位移反分析的小湾拱坝稳定性评价[J]. 岩石力学与工程学报,2013,32(11):2 242–2 249.(HE Zhu,LIU Yaoru,YANG Qiang,et al. Research on stability estimation of Xiaowan arch dam based on displacement back analysis[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(11):2 242–2 249.(in Chinese))
[9] LIN P,ZHOU W Y,LIU H Y. Experimental study on cracking,reinforcement,and overall stability of the Xiaowan super-high arch dam[J]. Rock Mechanics and Rock Engineering,2015,48(2):819– 841.
[10] WANG R K. Key Technologies in the design and construction of 300 m ultra-high arch dams[J]. Engineering,2016,2(3):350–359.
[11] WIELAND M,KIRCHEN G F. Long-term dam safety monitoring of punt dal gall arch dam in Switzerland[J]. Frontiers of Structural and Civil Engineering,2012,6(1):76–83.
[12] 崔广珍,贾建宇,关育生,等. 汾河二库碾压混凝土重力坝底部廊道裂缝成因及处理措施[J]. 山西水利科技,2000,135(增):67–68. (CUI Guangzhen,JIA Jianyu,GUAN Yusheng,et al. Genesis of crack on gallery of roller compacted concrete dam of Fenhe reservoir II and treatment measures[J]. Shanxi Hydrotechnics,2000,135(Supp.):67–68.(in Chinese))
[13] 汤洪洁,张江红,陈景富. 安徽流波水电站碾压混凝土拱坝裂缝处理[J]. 水利水电技术,2012,43(7):72–74.(TANG Hongjie,ZHANG Jianghong,CHEN Jingfu. Crack treatment on roller compacted concrete arch dam of Liubo hydropower station in Anhui Province[J]. Water Resources and Hydropower Engineering,2012,43(7):72–74.(in Chinese))
[14] 霍自民,章美文,刘亚敏,等. 四里岩水库廊道裂缝成因分析及防治措施[J]. 水利水电技术,2005,(5):78–80.(HUO Zimin,ZHANG Meiwen,LIU Yamin,et al. Analysis on cracks in gallery of dam for Siliyan reservoir[J]. Water Resources and Hydropower Engineering,2005,(5):78–80.(in Chinese))
[15] 吕永宁,李 涛,林潘斌,等. 沙溪口大坝19号坝段廊道裂缝成因分析及影响[J]. 大坝与安全,2007,(4):36–38.(LU Yongning,LI Tao,LIN Panbin,et al. Cause analysis and effect of gallery cracks on dam block 19 at Shaxikou dam[J]. Dam and Safety,2007,(4):36–38.(in Chinese))
[16] CHEN Y,ZHANG L,YANG B Q,et.al. Geomechanical model test on dam stability and application to Jinping high arch dam[J]. International Journal of Rock Mechanics and Mining Sciences,2015,76(1):1–9.
[17] MALLA S,WIELAND M. Analysis of an arch-gravity dam with a horizontal crack[J]. Computers and Structures,1999,72(1):267–278.
[18] CHEN P P,ZHANG G X. Study on the prevention measures and causes of cracks in arch crests of galleries in high concrete dams[J]. Advanced Materials Research,2014,(3):813–819.
[19] 马 克,金 峰,唐春安,等. 基于微震监测的大岗山高拱坝坝踵蓄水初期变形机制研究[J]. 岩石力学与工程学报,2017,36(5): 1 111–1 121.(MA Ke,JIN Feng,TANG Chun?an,et al. Deformation mechanism of the dam heel of Dagangshan high arch dam based on microseismic monitoring during initial impoundment[J]. Chinese Journal of Rock Mechanics and Engineering,2017,36(5):1 111– 1 121.(in Chinese))
[20] 庄端阳,唐春安,梁正召,等. 基于微震能量演化的大岗山右岸边坡抗剪洞加固效果研究[J]. 岩土工程学报,2017,39(5):868–878.(ZHUANG Duanyang,TANG Chun?an,LIANG Zhengzhao,et al. Reinforcement effect of anti-shear tunnels of Dagangshan right bank slope based on microseismic energy evolution[J]. Chinese Journal of Geotechnical Engineering,2017,39(5):868–878.(in Chinese))
[21] 涂 劲,李德玉,陈厚群,等. 大岗山拱坝–地基体系整体抗震安全性研究[J]. 水利学报,2011,42(2):152–159.(TU Jing,LI Deyu,CHEN Houqun,et al. Study on integral seismic safety of Dagangshan arch dam-foundation system[J]. Journal of Hydraulic Engineering,2011,42(2):152–159.(in Chinese))
[22] GIBOWICZ S J,KIJKO A. An introduction to mining seismology[M]. San Diego,California:Academic Press Inc.,1994:15–22.
[23] BOORE D M,BOATWRIGHT J. Average body-wave radiation coefficients[J]. Bulletin of the Seismological Society of America,1984,74:1 615–1 621.
[24] MENDECKI A J. Seismic monitoring in mines[M]. London:Chapman and Hall,1996:155–158. |
| [1] |
ZHOU Linli1, 2, 3*, WEI Mixiang1, HAN Jun2, JIA Baoxin1, 4, BU Ji1, CUI Boyuan1. Time localization picking method for microseismic signals based on time window energy and time frequency characteristics[J]. , 2026, 45(3): 875-891. |
|
|
|
|