| Development of a 3D geomechanical model test system for non-pillar mining with automatically formed roadway and its engineering application#br# |
| WANG Qi1,2,3,JIANG Bei1,3,XIN Zhongxin2,3,HE Manchao1,3,LI Shucai2,ZHANG Peng2,3,WANG Yue2,3,JIANG Zhenhua2,4#br# |
(1. State Key Laboratory for Geo-mechanics and Deep Underground Engineering,China University of Mining and Technology,Beijing 100083,China;2. Research Center of Geotechnical and Structural Engineering,Shandong University,Jinan,Shandong 250061,China;3. Research Institute of Deep Underground Science and Engineering,China University of Mining and Technology,Beijing 100083,China;4. Shandong Tianqin Engineering and Technology Limited Company,Heze,Shandong 274799,China)
|
|
|
|
Abstract The non-pillar mining technology of roof cutting and pressure releasing with automatically formed roadway(AFR) is a new type of coal mining method,which takes advantage of the mining pressure and rock mass expansion characteristic to automatically form roadways and hence,achieves coal mining without requiring excavating mining roadways and reserving protective coal pillars. In order to study the movement mechanism of overlying strata,the mining pressure behavior and failure mechanism of AFR in the whole mining process of the non-pillar mining with AFR,a 3D geomechanical model test system for non-pillar mining with AFR was independently developed,which composes of reaction and hydraulic loading subsystem,automatic mining and roadway forming subsystem and high-precision real-time monitoring subsystem. The model test system,equipped with a complete set of test devices to simulate the core techniques such as mining,roof pre-splitting and roadway automatic forming,can actually simulate the whole mining process of mining and forming roadway integration by the non-pillar mining technology of roof cutting and pressure releasing with AFR and monitor the mining pressure of whole working face. The geomechanical model tests with different model sizes in the range of 5.5 m in length,2.4 m in height and 3.0 m in width can be carried out through a combined anti-force device. Taking the China¢s first working face of N00 technology—S1201–II working face of Ningtiaota Mine Coal as the engineering background,the 3D geomechanical model test was carried out by applying the model test system to study the most complicated N00 technology in non-pillar mining technologies with AFR. The mining pressure behavior of N00 technology was revealed and the control mechanism of the AFR surrounding rock was cleared. The key control positions of AFR were obtained,and the corresponding engineering suggestions were put forward to guide the following field application. The field monitoring results are basically consistent with the model test,which verifies the rationality and effectiveness of the model test system.
|
|
|
|
|
|
[1] 钱鸣高,许家林,王家臣. 再论煤炭的科学开采[J]. 煤炭学报,2018,43(1):1–13.(QIAN Minggao,XU Jialin,WANG Jiachen. Further on the sustainable mining of coal[J]. Journal of China Coal Society,2018,43(1):1–13.(in Chinese))
[2] 何满潮,谢和平,彭苏萍,等. 深部开采岩体力学研究[J]. 岩石力学与工程学报,2005,24(16):2 803–2 813.(HE Manchao,XIE Heping,PENG Suping,et al. Study on rock mechanics in deep mining engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(16):2 803–2 813.(in Chinese))
[3] WANG Q,JIANG Z H,JIANG B,et al. Research on an automatic roadway formation method in deep mining areas by roof cutting with high-strength bolt-grouting[J]. International Journal of Rock Mechanics and Mining Sciences,2020,128:104264.
[4] 王 琦,秦 乾,高 松,等. 数字钻探随钻参数与岩石单轴抗压强度关系[J]. 煤炭学报,2018,43(5):1 289–1 295.(WANG Qi,QIN Qian,GAO Song,et al. Relationship between rock drilling parameters and rock uniaxial compressive strength based on energy analysis[J]. Journal of China Coal Society,2018,43(5):1 289–1 295. (in Chinese))
[5] 王 琦,秦 乾,许 硕,等. 基于数字钻探的岩石c-φ参数测试方法[J]. 煤炭学报,2019,44(3):915–922.(WANG Qi,QIN Qian,XU Shuo,et al. A testing method for rock c-φ parameter based on digital drilling test technology[J]. Journal of China Coal Society,2019,44(3):915–922.(in Chinese))
[6] 刘 洋,石平五. 长壁留煤柱支撑法开采存在的难题[J]. 煤炭学报,2007,32(6):565–569.(LIU Yang,SHI Pingwu. Existing problem on longwall remaining coal pillars support mining[J]. Journal of China Coal Society,2007,32(6):565–569.(in Chinese))
[7] ISLAVATH S R,DEB D,KUMAR H. Numerical analysis of a longwall mining cycle and development of a composite longwall index[J]. International Journal of Rock Mechanics and Mining Sciences,2016,89:43–54.
[8] WANG Q,JIANG B,PAN R,et al. Failure mechanism of surrounding rock with high stress and confined concrete support system[J]. International Journal of Rock Mechanics and Mining Sciences,2018,102:89–100.
[9] 窦林名,何 烨,张卫东. 孤岛工作面冲击矿压危险及其控制[J]. 岩石力学与工程学报,2003,22(11):1 866–1 869.(DOU Linming,HE Ye,ZHANG Weidong. Hazards of rock burst in island coal face and its control[J]. Chinese Journal of Rock Mechanics and Engineering,2003,22(11):1 866–1 869.(in Chinese))
[10] 王 琦,许 硕,江 贝,等. 地下工程约束混凝土支护理论与技术研究进展[J]. 煤炭学报,2020(待刊).(WANG Qi,XU Shuo,JIANG Bei,et al. Research Progress of Confined Concrete Support Theory and Technology for Underground Engineering[J]. Journal of China Coal Society,2020(to be Pressed).(in Chinese))
[11] 王德超,李术才,王 琦,等. 深部厚煤层综放沿空掘巷煤柱合理宽度试验研究[J]. 岩石力学与工程学报,2014,33(3):539–548. (WANG Dechao,LI Shucai,WANG Qi,et al. Experimental study of reasonable coal pillar width in fully mechanized top coal caving face of deep thick coal seam[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(3):539–548.(in Chinese))
[12] 王 琦,高红科,蒋振华,等. 地下工程围岩数字钻探测试系统研发与应用[J]. 岩石力学与工程学报,2020,39(2):301–310.(WANG Qi,GAO Hongke,JIANG Zhenhua,et al. Development and application of a surrounding rock digital drilling test system of underground engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(2):301–310.(in Chinese))
[13] 何满潮,宋振骐,王 安,等. 长壁开采切顶短壁梁理论及其110工法——第三次矿业科学技术变革[J]. 煤炭科技,2017,1(1):1–9.(HE Manchao,SONG Zhenqi,WANG An,et al. Theory of longwall mining by using roof cuting shortwall team and 110 method—the third mining science and technology reform[J]. Coal Science and Technology Magazine,2017,1(1):1–9.(in Chinese))
[14] WANG Q,HE M C,YANG J,et al. Study of a non-pillar mining technology with automatically formed gob-side entry retaining for longwall mining in coal mines[J]. International Journal of Rock Mechanics and Mining Sciences,2018,110:1–8.
[15] 何满潮,陈上元,郭志飚,等.切顶卸压沿空留巷围岩结构控制及其工程应用[J]. 中国矿业大学学报,2017,46(5):959–969.(HE Manchao,CHEN Shangyuan,GUO Zhibiao,et al. Control of surrounding rock structure for gob-side entry retaining by cutting roof to release pressure and its engineering application[J]. Journal of China University of Mining and Technology,2017,46(5):959–969.(in Chinese))
[16] 王亚军,何满潮,张科学,等. 无煤柱自成巷开采巷道矿压显现特征及控制对策[J]. 采矿与安全工程学报,2018,35(4):677–685. (WANG Yajun,HE Manchao,ZHANG Kexue,et al. Strata behavior characteristics and control countermeasures for the gateroad surroundings in innovative non-pillar mining method with gateroad formed automatically[J]. Journal of Mining and Safety Engineering,2018,35(4):677–685.(in Chinese))
[17] 杨 军,王宏宇,王亚军,等.切顶卸压无煤柱自成巷顶板断裂特征研究[J]. 采矿与安全工程学报,2019,36(6):1 137–1 144.(YANG Jun,WANG Hongyu,WANG Yajun,et al. Case study on pressure- relief mining technology without advance tunneling and coal pillars in longwall mining[J]. Journal of Mining and Safety Engineering,2019,36(6):1 137–1 144.(in Chinese))
[18] 高玉兵,杨 军,王 琦,等. 无煤柱自成巷预裂切顶机制及其对矿压显现的影响[J]. 煤炭学报,2019,44(11):3 349–3 359.(GAO Yubing,YANG Jun,WANG Qi,et al. Mechanism of roof presplitting in a nonpillar mining method with entry automatically retained and its influence on the strata behaviors[J]. Journal of China Coal Society,2019,44(11):3 349–3 359.(in Chinese))
[19] WANG Y J,HE M C,YANG J,et al. Case study on pressure-relief mining technology without advance tunneling and coal pillars in longwall mining[J]. Tunnelling and Underground Space Technology,2020,97:103236.
[20] 何满潮,王亚军,杨 军,等. 切顶成巷工作面矿压分区特征及其影响因素分析[J]. 中国矿业大学学报,2018,47(6):1 158–1 165. (HE Manchao,WANG Yajun,YANG Jun,et al. Zonal characteristics and its influence factors of working face pressure using roof cutting and pressure-relief mining method with no pillar and roadway formed automatically[J]. Journal of China University of Mining and Technology,2018,47(6):1 158–1 165.(in Chinese))
[21] 孙晓明,刘 鑫,梁广峰,等. 薄煤层切顶卸压沿空留巷关键参数研究[J]. 岩石力学与工程学报,2014,33(7):1 449–1 456.(SUN Xiaoming,LIU Xin,LIANG Guangfeng,et al. Key parameters of gob-side entry retaining formed by roof cut and pressure releasing in thin coal seams[J]. Chinese Journal of Rock Mechanics and Engineering,2014,33(7):1 449–1 456.(in Chinese))
[22] 杨 军,付 强,高玉兵,等. 断层影响下无煤柱自成巷围岩运动及矿压规律[J]. 中国矿业大学学报,2019,48(6):1 238–1 247. (YANG Jun,FU Qiang,GAO Yubing,et al. Surrounding rock movement and pressure distribution laws of non-pillar mining with entry automatically retained by roof cutting influenced by faults[J]. Journal of China University of Mining and Technology,2019,48(6):1 238–1 247.(in Chinese))
[23] LI S C,WANG Q,WANG H T,et al. Model test study on surrounding rock deformation and failure mechanisms of deep roadways with thick top coal[J]. Tunnelling and Underground Space Technology,2015,47:52–63.
[24] 李术才,王德超,王 琦,等. 深部厚顶煤巷道大型地质力学模型试验系统研制与应用[J]. 煤炭学报,2013,38(9):1 522–1 530.(LI Shucai,WANG Dechao,WANG Qi,et al. Development and application of large-scale geomechanical model test system for deep thick top coal roadway[J]. Journal of China Coal Society,2013,38(9):1 522–1 530.(in Chinese))
[25] 姜耀东,吕玉凯,赵毅鑫,等. 承压水上开采工作面底板破坏规律相似模拟试验[J]. 岩石力学与工程学报,2011,30(8):1 571–1 578. (JIANG Yaodong,LU Yukai,ZHAO Yixin,et al. Similar simulation test for breakage low of working face floor in coal mining above aquifer[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(8):1 571–1 578.(in Chinese))
[26] 刘纯贵. 马脊梁煤矿浅埋煤层开采覆岩活动规律的相似模拟[J]. 煤炭学报,2011,36(1):7–11.(LIU Chungui. Similar simulation study on the movement behavior of overlying strata in shallow seam mining in Majiliang Coal Mine[J]. Journal of China Coal Society,2011,36(1):7–11.(in Chinese))
[27] 徐连满,潘一山,李忠华,等. 深部开采覆岩应力变化规律模拟实验研究[J]. 中国地质灾害与防治学报,2011,22(3):61–66.(XU Lianman,PAN Yishan,LI Zhonghua,et al. Similarity simulation experiment of deformation of deep mining-induced overburden stress[J]. The Chinese Journal of Geological Hazard and Control,2011,22(3):61–66.(in Chinese))
[28] 任艳芳,宁 宇,齐庆新. 浅埋深长壁工作面覆岩破断特征相似模拟[J]. 煤炭学报,2013,38(1):61–66.(REN Yanfang,NING Yu,QI Qingxin. Physical analogous simulation on the characteristics of overburden breakage at shallow longwall coalface[J]. Journal of China Coal Society,2013,38(1):61–66.(in Chinese))
[29] 刘长友,杨敬轩,于 斌,等. 多采空区下坚硬厚层破断顶板群结构的失稳规律[J]. 煤炭学报,2014,39(3):395–403.(LIU Changyou,YANG Jingxuan,YU Bin,et al. Destabilization regularity of hard thick roof group under the multi gob[J]. Journal of China Coal Society,2014,39(3):395–403.(in Chinese))
[30] 郭惟嘉,王海龙,陈绍杰,等. 采动覆岩涌水溃砂灾害模拟试验系统研制与应用[J]. 岩石力学与工程学报,2016,35(7):1 415–1 422. (GUO Weijia,WANG Hailong,CHEN Shaojie,et al. Development and application of simulation test system for water and sand inrush across overburden fissures due to coal mining[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(7):1 415–1 422.(in Chinese))
[31] YE Q,WANG G,JIA Z Z,et al. Similarity simulation of mining-crack-evolution characteristics of overburden strata in deep coal mining with large dip[J]. Journal of Petroleum Science and Engineering,2018,165:477–487.
[32] XIE P S,LUO Y,WU Y P,et al. Roof deformation associated with mining of two panels in steeply dipping coal seam using subsurface subsidence prediction model and Physical Simulation Experiment[J]. Mining,Metallurgy and Exploration,2019,37(2):581–591.
[33] 王宏伟,邵明明,王 刚,等. 开采扰动下逆冲断层滑动面应力场演化特征[J]. 煤炭学报,2019,44(8):2 318–2 327.(WANG Hongwei,SHAO Mingming,WANG Gang,et al. Characteristics of stress evolution on the thrust fault plane during the coal mining[J]. Journal of China Coal Society,2019,44(8):2 318–2 327.(in Chinese))
[34] WANG Q,GAO H K,JIANG B,et al. Research on reasonable coal pillar width of roadway driven along goaf in deep mine[J]. Arabian Journal of Geosciences,2017,10:466.
[35] 王 琦. 深部厚顶煤巷道围岩破坏控制机制及新型支护系统对比研究[博士学位论文][D]. 济南:山东大学,2012.(WANG Qi. Research on control mechanism of surrounding rock failure in deep roadways with thick top-coal and contrast of new support systems[Ph. D. Thesis][D]. Jinan:Shandong University,2012.(in Chinese))
[36] 江 贝. 超大断面隧道软弱围岩约束混凝土控制机制及应用研究[博士学位论文][D]. 济南:山东大学,2016.(JIANG Bei. Control mechanism and application of confined concrete for super large section tunnel on weak surrounding rock[Ph. D. Thesis][D]. Jinan:Shandong University,2016.(in Chinese))
[37] 王 琦,王汉鹏,李术才,等. 柔性均布压力加载装置的研制及试验分析[J]. 岩石力学与工程学报,2012,31(1):133–139.(WANG Qi,WANG Hanpeng,LI Shucai,et al. Development and test analysis of flexible uniform pressure loading device[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(1):133–139.(in Chinese)) |
| [1] |
LI Botao1, 2, 3, TAN Yuxuan1, LIN Haifei4, 5*, WEI Jianping1, 2, 3, ZHANG Hongtu1, 2, 3, LI Shugang4, 5, WEI Zongyong4, 5, WANG Pei4, LUO Rongwei4, LIU Yanwei1, 2, 3. Mechanical properties and mesoscopic damage evolution of coal under liquid-nitrogen freezing at different initial temperatures[J]. , 2026, 45(6): 1757-1772. |
|
|
|
|