[1] |
中华人民共和国行业标准编写组. NB/T 10143—2019 水电工程岩爆风险评估技术规范[S]. 北京:中国水利水电出版社,2019.(The Professional Standards Compilation Group of People?s Republic of China. NB/T 10143—2019 Technical code for rockburst risk assessment of hydropower projects[S]. Beijing:China Water Resources and Hydropower Press,2019.(in Chinese))
|
[2] |
马行东,黎昌有,王修华,等. 双江口电站高地应力区地下厂房系统第I层开挖岩爆发育规律和岩爆预测初步研究[J]. 岩石力学与工程学报,2020,39(增2):2 964-2 972.(MA Xingdong,LI Changyou,WANG Xiuhua,et al. Preliminary study on rockburst development law and rockburst prediction in excavation of layer I of underground powerhouse system in high geostress area of Shuangjiangkou hydropower station[J]. Chinese Journal of Rock Mechanics and Engineering,2020,39(Supp.1):2 964-2 972.(in Chinese))
|
[3] |
XU D P,HUANG X,JIANG Q,et al. Estimation of the three- dimensional in situ stress field around a large deep underground cavern group near a valley[J]. Journal of Rock Mechanics and Geotechnical Engineering,2021,13(3):529-544.(in Chinese))
|
[4] |
谷兆祺,彭守拙,李仲奎. 地下洞室工程[M]. 北京:清华大学出版社,1994:87-95.(GU Zhaoqi,PENG Shouzhuo,LI Zhongkui. Underground cavern engineering[M]. Beijing:Tsinghua University Press,1994:87-95.(in Chinese))
|
[5] |
殷荣岗,张建海,邓建辉,等. 地应力对地下厂房岩锚吊车梁变形及应力影响分析[J]. 岩石力学与工程学报,2013,32(增2):3 681- 3 687.(YIN Ronggang,ZHANG Jianhai,DENG Jianhui,et al. Analyses of deformation and stress caused by geostress on rock- anchored beam of underground power house[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(Supp.2):3 681-3 687. (in Chinese))
|
[6] |
刘明昌,段汝健,叶式穗,等. 锦屏水电站地下厂房岩锚梁岩台开挖支护技术[J]. 人民长江,2009,40(18):48-50.(LIU Mingchang,DUAN Rujian,YE Shisui,et al. Excavation and support technology of rock anchor beam rock abutment for underground powerhouse of Jinping Hydropower Station[J]. Yangtze River,2009,40(18):48-50.(in Chinese))
|
[7] |
李志鹏,徐光黎,董家兴,等. 高地应力下地下厂房围岩破坏特征及地质力学机制[J]. 中南大学学报:自然科学版,2017,48(6): 1 568-1 576.(LI Zhipeng,XU Guangli,DONG Jiaxing,et al. Geomechanics mechanism and characteristics of surrounding rock mass failure for underground powerhouse under high geostress[J]. Journal of central south University:Science and Technology,2017,48(6):1 568-1 576.(in Chinese))
|
[8] |
吴世勇,龚秋明,王 鸽,等. 锦屏II级水电站深部大理岩板裂化破坏试验研究及其对TBM开挖的影响[J]. 岩石力学与工程学报,2010,29(6):1 089-1 095.(WU Shiyong,GONG Qiuming,WANG Ou,et al. Experimental study of slabbing failure for deep buried marble at Jinping Ⅱ hydropower station and its influences on TBM excavation[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(6):1 089-1 095.(in Chinese))
|
[9] |
董学元、马丰云. 锦屏一级水电站岩锚梁施工技术[J]. 隧道建设,2011,31(2):235-245.(DONG Xueyuan,MA Fengyun. Case study on construction technology for rock anchored beam of Jinping Ⅰ hydropower station[J]. Tunnel Construction,2011,31(2):235- 245.(in Chinese))
|
[10] |
吕宗强、赵东阳. 溪洛渡地下厂房岩锚梁开挖精细化质量管控[J].云南水力发电,2021,37(1):132-137.(LV Zongqiang,ZHAO Dongyang. Fine quality control of rock anchor beam excavation of Xiluodu underground powerhouse[J]. Yunnan Water Power,2021,37(1):132-137.(in Chinese))
|