| Study on excavating and reinforcement stability on the south slope of the north gate head of the Three Gorges ship lock |
| FAN Qixiang1,2,WEI Pengcheng3,LIN Peng3,GENG Jun1 |
| (1. China Three Gorges Corporation,Beijing 100038,China;2. China Huaneng Group.,Co.,Ltd.,Beijing 100031,China;
3. Department of Hydraulic Engineering,Tsinghua University,Beijing 100084,China) |
|
|
|
|
Abstract The control of excavation deformation and reinforcement of vertical slope rock mass of the three gorges project is the key to ensure the timely impounding. Based on the analysis and demonstration of space relationship of excavation and reinforcement,and overall stability,this study solves the complex construction problems on the stability of lower bedrock blasting excavation and overhanging rock mass of the second ship lock head along north line. Through the application of advanced anchorage,individualized controlled blasting,efficient reinforcement of overhang rock mass,rapid construction of long anchor cables and concrete backfilling,the treatment scheme and engineering procedures of the overhang rock mass on the slope is proposed. The safety,high quality and high-efficiency construction of the ship lock are sure,and the ship lock is put into operation on schedule in 2003. The monitoring results show that the ship lock has been in smooth operation for 16 years. The engineering procedure proved beneficial in contributing to the avoidance of overhanging rock mass failure during construction,and have important reference significance for similar projects.
|
|
|
|
|
|
| [1] FAN Q X,YANG Z L,LIU G. The practice of project construction and management of Three Gorges ship-lock[J]. Engineering Sciences,2011,9(3):82–87.
[2] 樊启祥. 三峡永久船闸关键技术问题综述[J]. 中国三峡建设,2002,(8):7–9.(FAN Qixiang. Long-term deformation and stability of high rock slope at Three Gorges shiplock[J]. China Three Gorges Construction,2002,(8):7–9.(in Chinese))
[3] FAN Q X,ZHU H B,GENG J. Monitoring result analyses of high slope of five-step ship lock in the Three Gorges Project[J]. Journal of Rock Mechanics and Geotechnical Engineering,2015,7(2):199–206.
[4] 樊启祥,顾文红. 三峡永久船闸高强结构锚杆现场试验研究及质量控制[J]. 岩石力学与工程学报,2001,20(5):657–660.(FAN Qixiang,GU Wenhong. Field testing study and quality control of high strength structure bolt for the three gorges permanent shiplocks[J]. Chinese Journal of Rock Mechanics and Engineering,2001,20(5):657–660.(in Chinese))
[5] LIN P,SHI J,WEI P C,et al. Shallow unloading deformation analysis on Baihetan super-high arch dam foundation[J]. Bulletin of Engineering Geology and the Environment,2019,78:5 551–5 568.
[6] 赵建军. 公路边坡稳定性快速评价方法及应用研究[博士学位论文][D]. 成都:成都理工大学,2007.(ZHAO Jianjun. Study and application on rapid slope stability evaluation method for highway[Ph. D. Thesis][D]. Chengdu:Chengdu University of Technology,2007.(in Chinese))
[7] 刘庆雪,刘晓玲,李 明,等. 某煤矿工业场地黄土高边坡稳定设计分析[J]. 西安科技大学学报,2012,(3):314–319.(LIU Qingxue,LIU Xiaoling,LI Ming,et al. The stability analysis of landslide for the site construction of the coal Industry[J]. Journal of Xi'an University of Science and Technology,2012,(3):314–319.(in Chinese))
[8] 赵尚毅,郑颖人,时卫民,等. 用有限元强度折减法求边坡稳定安全系数[J]. 岩土工程学报,2002,24(3):343–346.(ZHAO Shangyi,ZHENG Yingren,SHI Weimin,et al. Analysis on safety factor of slope by strength reduction FEM[J]. Chinese Journal of Geotechnical Engineering,2002,24(3):343–346.(in Chinese))
[9] 邬爱清. 基于关键块体理论的岩体稳定性分析方法及其在三峡工程中的应用[J]. 长江科学院院报,2019,36(2):5–11.(WU Aiqing. Series methods of analyzing rock mass stability based on key block theory and their applications to three gorges project[J]. Journal of Yangtze River Scientific Research Institute,2019,36(2):5–11.(in Chinese))
[10] 陈祖煜,邵长明. 最优化方法在确定边坡最小安全系数方面的应用[J]. 岩土工程学报,1988,10(4):1–13.(CHEN Zuyu,SHAO Changming. The use of method of optimization for minimizing safety factors on slope stability analysis[J]. Chinese Journal of Geotechnical Engineering,1988,10(4):1–13.(in Chinese))
[11] SPENCER E. A method of analysis of the stability of embankments assuming parallel inter-slice forces[J]. Geotechnique,1967,17(1):11–26.
[12] 陈祖煜,弥宏亮,汪小刚. 边坡稳定三维分析的极限平衡方法[J]. 岩土工程学报,2001,23(5):525–529.(CHEN Zuyu,MI Hongliang,WANG Xiaogang. A three-dimensional limit equilibrium method for slope stability analysis[J]. Chinese Journal of Geotechnical Engineering,2001,23(5):525–529.(in Chinese))
[13] 肖世国,欧 源. 硬岩边坡预应力锚索地梁坡体压力分析方法[J].地下空间与工程学报,2010,6(3):655–659.(XIAO Shiguo,OU Yuan. Analysis methods for slope pressure on prestressed anchor-cable foundation beam in hard rock slope projects[J]. Chinese Journal of Underground Space and Engineering,2010,6(3):655–659.(in Chinese))
[14] 邓楚键,孔位学,郑颖人. 极限分析有限元法讲座Ⅲ—增量加载有限元法求解地基极限承载力[J]. 岩土力学,2005,26(3):500–504.(DENG Chujian,KONG Weixue,ZHENG Yingren. Analysis of ultimate bearing capacity of foundations by elastoplastic FEM through step loading[J]. Rock and Soil Mechanics,2005,26(3):500–504.(in Chinese))
[15] 章 青,卓家寿. 三峡船闸高边坡稳定分析的界面元法与评判准则[J]. 岩石力学与工程学报,2000,19(3):285–288.(ZHANG Qing,ZHUO Jiashou. Interface element method and criterion for stability analysis of high slopes in Three Gorges shiplock[J]. Chinese Journal of Rock Mechanics and Engineering,2000,19(3):285–288.(in Chinese))
[16] 寇晓东,周维垣,杨若琼. FLAC-3D进行三峡船闸高边坡稳定分析[J]. 岩石力学与工程学报,2001,20(1):6–10.(KOU Xiaodong,ZHOU Wweiyuan,YANG Ruoqiong. Stability analysis on the high slopes of three-gorges shiplock using Flac-3D[J]. Chinese Journal of Rock Mechanics and Engineering,2001,20(1):6–10.(in Chinese))
[17] 蒋中明,熊小虎,曾 铃. 基于FLAC-3D平台的边坡非饱和降雨入渗分析[J]. 岩土力学,2014,35(3):855–861.(JIANG Zhongming,XIONG Xiaohu,ZENG Ling. Unsaturated seepage analysis of slope under rainfall condition based on FLAC-3D[J]. Rock and Soil Mechanics,2014,35(3):855–861.(in Chinese))
[18] 祁生文,伍法权,刘春玲,等. 地震边坡稳定性的工程地质分析[J]. 岩石力学与工程学报,2004,23(16):2 792–2 797.(QI Shengwen,WU Faquan,LIU Chunling,et al. Engineering geology analysis on stability of slope under earthquake[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(16):2 792–2 797.(in Chinese))
[19] QIU C,XIE M,ESAKI T. Application of GIS technique in three-dimensional slope stability analysis[C]// Proceedings of the International Symposium on Computational Mechanics 2007. Beijing, China,2007:703–712.
[20] 吕建红,袁宝远,杨志法,等. 边坡监测与快速反馈分析[J]. 河海大学学报,1999,27(6):98–102.(LV Jianhong,YUAN Baoyuan,YANG Zhifa,et al. Study on slope monitoring and quick feedback[J]. Journal of Hohai University,1999,27(6):98–102.(in Chinese))
[21] 赵小平,闫丽丽,刘文龙. 三维激光扫描技术边坡监测研究[J]. 测绘科学,2010,35(4):25–27.(ZHAO Xiaoping,YAN Lili,LIU Wenlong. Research on monitoring the shape of slope based on the three-dimensional laser scanning technology[J]. Science of Surveying and Mapping,2010,35(4):25–27.(in Chinese))
[22] 朱鸿鹄,殷建华,洪成雨,等. 基于光纤传感的边坡工程监测技术[J]. 工程勘察,2010,38(3):6–10.(ZHU Honghu,YIN Jianhua,HONG Chengyu,et al. Fiber optic based monitoring technologies of slope engineering[J]. Geotechnical Investigation and Surveying,2010,38(3):6–10.(in Chinese))
[23] CODEGLIA D,DIXON N,FOWMES G J,et al. Analysis of acoustic emission patterns for monitoring of rock slope deformation mechanisms[J]. Engineering Geology,2017,219:21–31.
[24] SIAD L. Stability analysis of jointed rock slopes reinforced by passive,fully grouted bolts[J]. Computers and Geotechnics,2001,28(5):325–347.
[25] 胡功笠,田艳凤,张 超,等. 软岩条件下锚注加固锚杆布置参数与注浆浆液参数的确定[J]. 岩土力学,2003,24(增2):267–270. (HU Gongli,TIAN Yanfeng,ZHANG Chao,et al. The confirmation of disposal-parameters of bolting and serosity-parameter of injection-grouting of bolting-grouting reinforcement in soft-rock[J]. Rock and Soil Mechanics,2003,24(Supp.2):267–270.(in Chinese))
[26] 马 涛. 浅埋隧道塌方处治方法研究[J]. 岩石力学与工程学报,2006,25(增2):3 976–3 981.(MA Tao. Treatment method for collapse treatment of shallow-buried tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2006,25(Supp.2):3 976–3 981.(in Chinese))
[27] 钟乃龙. 公路软岩隧道小型拱形塌方腔体稳定性及处治措施研究[硕士学位论文][D]. 西安:长安大学,2014.(ZHONG Nailong. Study on stability of small arch collapse cavities and treatment measures of highway tunnel in soft rock[M. S. Thesis][D]. Xi'an:Chang'an University,2014.(in Chinese))
[28] 翟才旺. 水利水电岩质边坡的加固技术综述[J]. 广西水利水电,2002,(3):1–4.(ZHAI Caiwang. Summary for strengthening technique of the rocky side slope in WR and hydropower project[J]. Guangxi Water Resources and Hydropower Engineering,2002,(3):1–4.(in Chinese))
[29] CELA J J. Material identification procedure for elastoplastic Drucker-Prager model[J]. Journal of Engineering Mechanics,2002,128(5):586–591. |
|
|
|