| Analysis and assessment of health status of unbonded prestressed anchors |
| LI Huishan1,2,WANG Yujie1,SUN Xingsong1,ZHAO Yufei1,SHI Beixiao2,JIANG Long1 |
| (1. Department of Geotechnical Engineering,China Institute of Water Resources and Hydropower Research,Beijing 100048,China;
2. College of Civil Engineering,Hebei University of Engineering,Handan,Hebei 056038,China) |
|
|
|
|
Abstract In the complex geological circumstance,prestressed anchors were prone to corrosion,which resulted in properties degradation or even failure. However,it was hard to know the health statue of the anchors accurately due to the high embedment depth and concealment. An in-situ anchor excavated experiment at Shaping II hydropower station was conducted. According to the health assessment system of prestressed anchors,the environmental index,corrosion status,chemical and mechanical properties changes,deformable features and operating time were investigated synthetically. Chemical and mechanical tests were used to evaluate the health statue of the anchors in both macro and micro perspectives. The results show that the different parts of the anchors are in different corrosion degrees because of the varied corrosion prevention measures. The prevention methods of the free and fixed part of the anchors are better than the one of the anchor head. The study results also indicate that the undamaged cement grout has positive effects on anchoring and steel strand corrosion prevention. It can be concluded that the anchors from the experiment are in good working condition,and there are no noticeable chemical and mechanical properties changes that are detected in the tests. The research methods and results could be used as reference for health assessment of similar prestressed anchors.
|
|
|
|
|
|
| [1] 程良奎. 岩土锚固研究与新进展[J]. 岩石力学与工程学报,2005,24(21):3 803–3 811.(CHENG Liangkui. Research and new progress in ground anchorage[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(21):3 803–3 811.(in Chinese))
[2] 程良奎,韩 军,张培文. 岩土锚固工程的长期性能与安全评价[J]. 岩石力学与工程学报,2008,27(5):865–872.(CHENG Liangkui,HAN Jun,ZHANG Peiwen. Long-term performance and safety assessment of anchorage in geotechnical engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(5):865–872.(in Chinese))
[3] LITTLEJOHN G S. Corrosion protection of steel tendons for ground anchorages[J]. Ground Engineering,1990,23(9):34–39.
[4] 曾宪明,雷志梁,张文巾,等. 关于锚杆“定时炸弹”问题的讨 论——答郭映忠教授[J]. 岩石力学与工程学报,2002,21(1):143–147.(ZENG Xianming,LEI Zhiliang,ZHANG Wenjin,et al. Discussion about “Time Bomb” question for bolt—an answer to professor GUO Yingzhong[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(1):143–147.(in Chinese))
[5] TERZI N U,DALDAL G I,YILDIRIM S. Motoring a grouted anchor in a reinforced structure[J]. Experimental Techniques,2009,12(3):47–54.
[6] 郑 静,曾辉辉,朱本珍. 腐蚀对锚索力学性能影响的试验研究[J]. 岩石力学与工程学报,2010,29(12):2 469–2 474.(ZHENG Jing,ZENG Huihui,ZHU Benzhen. Test study of influence of erosion on mechanical behavior of anchor[J]. Chinese Journal of Rock Mechanics and Engineering,2010,29(12):2 469–2 474.(in Chinese))
[7] 李英勇,张顶立,张宏博,等. 边坡加固中预应力锚索失效机制与失效效应研究[J]. 岩土力学,2010,31(1):144–150.(LI Yingyong,ZHANG Dingli,ZHANG Hongbo,et al. Research on failure mechanism and effects of prestressed anchor cables for reinforcing slopes[J]. Rock and Soil Mechanics,2010,31(1):144–150.(in Chinese))
[8] FEDDERSEN I. Improvement of the overall stability of a gravity dam with 4500 kN-anchors[C]// Symp. on Ground Anchorages and Anchored Structures. London:Themas Telford,1997:318–325.
[9] 范卫琴. 锚索预应力损失规律的数值模拟[硕士学位论文][D]. 武汉:武汉理工大学,2007.(FAN Weiqin. Numerical simulation study on prestress loss of cable-bolt[M. S. Thesis][D]. Wuhan:Wuhan University of Technology,2007.(in Chinese))
[10] 杨启贵,高大水,吴海斌. 对我国岩土预应力锚索防腐措施和标准的探讨[J]. 岩土工程学报,2007,29(10):1 558–1 562.(YANG Qigui,GAO Dashui,Wu Haibing. Discussion on antiseptic measures and standards of geotechnical prestressed anchorage cables in China[J]. Chinese Journal of Geotechnical Engineering,2007,29(10):1 558–1 562.(in Chinese))
[11] 李英勇,张思峰,王松根,等. 预应力锚固结构腐蚀介质作用下的耐久性试验研究[J]. 岩石力学与工程学报,2008,27(8):1 626– 1 633.(LI Yingyong,ZHANG Sifeng,WANG Songgen,et al. Experimental research on durability of prestressed anchorage structure subjected to corrosion medium[J]. Chinese Journal of Rock Mechanics and Engineering,2008,27(8):1 626–1 633.(in Chinese))
[12] 高大水,吴海斌,王 莉. 三峡船闸高边坡预应力锚索耐久性研究[J]. 岩土力学,2005,26(增2):126–130.(GAO Dashui,WU Haibing,WANG Li. Research on endurance of prestressed anchorage cables in TGP shiplock′s high slop[J]. Rock and Soil Mechanics,2005,26(Supp.2):126–130.(in Chinese))
[13] 刘贞国. 预应力锚索结构的腐蚀行为[硕士学位论文][D]. 徐州:中国矿业大学,2014.(LIU Zhenguo. Corrosion behavior of prestressed anchor cable structures[M. S. Thesis][D]. Xuzhou:China University of Mining and Technology,2014.(in Chinese))
[14] WANG Y,REN A,WANG Y,et al. Investigations on corrosion and mechanical properties of a 20 year old ground anchor exhumed at a power station site[J]. Canadian Geotechnical Journal,2015,53(4):589–602.
[15] 任爱武,汪彦枢,王玉杰,等. 拉力集中全长黏结型锚索长期耐久性研究[J]. 岩石力学与工程学报,2011,30(3):493–499.(REN Aiwu,WANG Yanshu,WANG Yujie,et al. Research on durability of concentrated tension and full-bonded anchor cables[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(3):493–499.(in Chinese))
[16] 中华人民共和国国家标准编写组. GB 50287—2006水力发电工程地质勘察规范[S]. 北京:中国计划出版社,2008.(The National Standards Compilation Group of the People′s Republic of China. GB 50287—2006 Strand for prestressed concrete[S]. Beijing:China Planning Press,2008.(in Chinese))
[17] 夏 宁. 锈蚀锚固体的力学性能研究及耐久性评估初探[博士学位论文][D]. 南京:河海大学,2005.(XIA Ning. Study on the mechanical property of corroded anchorage structure and its durability evaluation[Ph. D. Thesis][D]. Nanjing:Hohai University,2005.(in Chinese))
[18] 王晓哲,亢景付,随春娥. 基于锚索监测数据的环锚无黏结预应力混凝土衬砌结构可靠性分析[J]. 水力发电学报,2015,34(2):144–148.(WANG Xiaozhe,KANG Jingfu,SUI Chune. Reliability analysis of the tunnel liner pre-stressed with circumferential un-bonded tendons based on the monitoring data[J]. Journal of Hydroelectric Engineering,2015,34(2):144–148.(in Chinese))
[19] 李久青,杜翠薇. 腐蚀试验方法及监测技术[M]. 北京:中国石化出版社,2007:10–12.(LI Jiuqing,DU Cuiwei. Corrosion test method and monitoring technology[M]. Beijing:China Petrochemical Press,2007:10–12.(in Chinese))
[20] 张志亮. 预应力锚索耐腐蚀性及失效研究[硕士学位论文][D]. 北京:中国地质大学,2008.(ZHANG Zhiliang. The research of prestressed anchorage cable corrosion resistance and inactivation[M. S. Theis][D]. Beijing:China University of Geosciences,2008.(in Chinese))
[21] 曾宪明,陈肇元,王靖涛,等. 锚固类结构安全性与耐久性问题探讨[J]. 岩石力学与工程学报,2004,23(13):2 235–2 242.(ZENG Xianming,CHEN Zhaoyuan,WANG Jingtao,et al. Research on safety and durability of bolt and cable-supported structures[J]. Chinese Journal of Rock Mechanics and Engineering,2004,23(13):2 235–2 242.(in Chinese))
[22] 李 剑. 预应力锚索失效因素的试验和数值研究[硕士学位论文][D]. 重庆:重庆大学,2007.(LI Jian. Experimental research and numerical simulation on failure factor of prestressed cable[M. S. Theis][D]. Chongqing:Chongqing University,2007.(in Chinese))
[23] 魏宝明. 金属腐蚀理论及应用[M]. 北京:化学工业出版社,1984:10–31.(WEI Baoming. Theory and application of metal corrosion[M]. Beijing:Chemical Industry Press,1984:10–31.(in Chinese))
[24] 中华人民共和国国家标准编写组. GB/T 699—1999优质碳素结构钢[S]. 北京:中国标准出版社,1999.(The National Standards Compilation Group of People′s Republic of China. GB/T699—1999 Quality carbon structural steels[S]. Beijing:Standards Press of China,1999.(in Chinese))
[25] 左景伊,左 禹. 腐蚀数据与选材手册[M]. 北京:化学工业出版社,1995:63–64.(ZUO Jingyi,ZUO Yu. Corrosion data and material selection manual[M]. Beijing:Chemical Industry Publishing House,1995:63–64.(in Chinese))
[26] 李富民,袁迎曙,杜健民,等. 氯盐腐蚀钢绞线的受拉性能退化特征[J]. 东南大学学报:自然科学版,2009,39(2):340–344.(LI Fumin,YUAN Yingshu,DU Jianmin,et al. Deterioration of tensile behavior of steel stands corroded by chloride[J]. Journal of Southeast University:Natural Science,2009,39(2):340–344.(in Chinese))
[27] 中华人民共和国国家标准编写组. GB/T 5224—2003预应力混凝土用钢绞线[S]. 北京:中国计划出版社,2003.(The National Standards Compilation Group of People′s Republic of China. GB/T 5224—2003 Strand for prestressed concrete[S]. Beijing:China Planning Press,2003.(in Chinese))
[28] 范 进. 高温后预应力钢绞线性能的试验研究[J]. 南京理工大学学报:自然科学版,2004,28(2):186–189.(FAN Jin. Experimental study on material properties of prestressed steel strand post high temperatures[J]. Journal of Nanjing University of Science and Technology:Natural Science,2004,28(2):186–189.(in Chinese))
[29] 张继祥,朱 明,高 波,等. 高温受热后82B预应力钢绞线力学性能退化规律研究[J]. 上海金属,2013,35(3):12–15.(ZHANG Jixiang,ZHU Ming,GAO Bo,et al. Research on mechanical property deterioration of 82B prestressed steel strand post high temperature[J]. Shanghai Metals,2013,35(3):12–15.(in Chinese))
[30] 宗钟凌,张 晋,蒋德稳,等. 高温后1860级钢绞线力学性能试验研究[J]. 消防科学与技术,2015,34(3):311–314.(ZONG Zhongling,ZHANG Jing,JIANG Dewen,et al. Experimental research on the mechanical properties of steel strand(fptk = 1 860 n/mm2) at elevated temperature[J]. Fire Science and Technology,2015,34(3):311–314.(in Chinese))
[31] 刘水成. 焊接试板采用气割法取样对试验结果的影响分析[J]. 科技视界,2014,(23):116–117.(LIU Shuicheng. Impact analysis of sampling on welding test plate by gas cutting method[J]. Science and Technology Vision,2014,(23):116–117.(in Chinese))
[32] 蔡连重,刘恩清. 核电用508–III钢气割热影响区组织及对性能影响的试验研究[J]. 一重技术,1998,(3):66–69.(CAI Lianchong,LIU Enqing. Experimental research on the microstructure and performance of 508–III steel for nuclear power in heat-affected zone[J]. Cfhi Technology,1998,(3):66–69.(in Chinese))
[33] MORESTIN F,BOIVIN M,SILVA C. Elasto plastic formulation using a kinematic hardening model for springback analysis in sheet metal forming[J]. Journal of Materials Processing Technology,1996,56(1):619–630.
[34] YOSHIDA F,UEMORI T,FUJIWARA K. Elastic-plastic behavior of steel sheets under in-plane cyclic tension-compression at large strain[J]. International Journal of Plasticity,2002,18(5/6):633–659.
[35] 李雪春,杨玉英,包 军,等. 弹性模量与塑性变形关系的探讨[J]. 哈尔滨工业大学学报,2000,32(5):54–56.(LI Xuechun,YANG Yuying,BAO Jun,et al. Relationship between elastic modulus and plastic deformation[J]. Journal of Harbin Institute of Technology,2000,32(5):54–56.(in Chinese))
[36] 郭 成,董 伟,臧顺来,等. 弹性模量与塑性变形变化规律试验研究[J]. 锻压技术,2008,33(2):116–119.(GUO Cheng,DONG Wei,ZANG Shunlai,et al. Experimental study on variation law of Young’s modulus and plastic deformation[J]. Forging and Stamping Technology,2008,33(2):116–119.(in Chinese))
[37] 于浩楠. 预应力锚索伸长量计算方法研究[硕士学位论文][D]. 重庆:重庆交通大学,2014.(Yu Haonan. Research on calculation method of elongation for pre-stress anchor[M. S. Thesis][D]. Chongqing:Chongqing Jiaotong University,2014.(in Chinese))
[38] 中华人民共和国行业标准编写组. CECS 22—2005岩土锚杆(索)技术规程[S]. 北京:中国标准出版社,2005.(The Professional Standards Compilation Group of the People?s Republic of China. CECS 22—2005 Technical specification for geotechnical anchor (cable)[S]. Beijing:Standards Press of China,2005.(in Chinese))
|
| [1] |
HUANG Man1, 2, WANG Yuhao1, 2, TAO Zhigang3, HONG Chenjie1, 2*, WENG Hanqian3, ZHANG Guangtao1, 2, ZHANG Haijiang1, 2. Size effect on anchorage resistance of Quasi-NPR bolt[J]. , 2026, 45(5): 1477-1488. |
|
|
|
|