|
|
|
| Quantitative assessment of landslide property risk based on impact probability of element at risk |
| WU Yue1,2,3,XIANG Lingjun1,WU Tongqing1,2,3,WANG Xiaolei1,WANG Binglong4 |
| (1. School of Civil Engineering and Architecture,Chongqing University of Science and Technology,Chongqing 401331,China;2. Key Laboratory of Geological Hazards Mitigation for Mountainous Highway and Waterway,Chongqing Municipal Education Commission,Chongqing Jiaotong University,Chongqing 400074,China;3. Chongqing Key Laboratory of Energy Engineering Mechanics and Disaster Prevention and Mitigation,Chongqing 401331,China;4. Southeast Sichuan Geological Brigade,Chongqing Bureau of Geology and Mineral Resources,Chongqing 400038,China) |
|
|
|
|
Abstract The impact probability of element at landslide risk refers to the impact probability of a element at risk in a certain spatial position under a certain disaster intensity. For this,on the basis of the sliding body motion model,put forward the sliding friction coefficient as a random variable,to calculate the impact probability by the Monte Carlo method,and then landslide risk assessment summarized as three kinds of evaluation model,and the corresponding calculation software system,using C# software programming achieved from the slope stability to the sliding probability analysis and calculation in the whole process of the impact process. Conclusion is obtained by using an real case,the results show that considering the impact probability of element at risk is conform to engineering experience and the rule of the landslide reliability theory,the indicators which use impact probability is more scientific and reasonable than other indicators,just need to calculate the impact probability of each element at landslide risk,and will increase a large amount of calculation work,but the software system can realize the massive spatial data analysis and graphical display,will improve the quantitative degree of landslide risk assessment.
|
|
|
|
|
|
| [1] 黄润秋. 20世纪以来中国的大型滑坡及其发生机制[J]. 岩石力学与工程学报,2007,26(3):434–453.(HUANG Runqiu. Large-scale landslide and their sliding mechanisms in China since the 20th century[J]. Chinese Journal of Rock Mechanics and Engineering,2007,26(3):434–453.(in Chinese))
[2] 吴 越,刘东升,陆 新,等. 单体滑坡灾害财产风险定量评估模 型[J]. 岩土力学,2010,31(增2):342–348.(WU Yue,LIU Dongsheng,LU Xin,et al. A quantitative assessment model for property risk caused by single landslide[J]. Rock and Soil Mechanics,2010,31(Supp.2):342–348.(in Chinese))
[3] AGS. A national landslide risk management framework for Australia,Australian geomechanics society[J]. Australian Geomechanics,2007,42(1):1–12.
[4] 吴树人,石菊松,张春山,等. 地质灾害风险评估技术指南初论[J]. 地质通报,2009,28(8):995–1 005.(WU Shuren,SHI Jusong,ZHANG Chunshan,et al. Preliminary discussion on technical guidelines for geohazard risk assessment[J]. Geological Bulletin of China,2009,28(8):995–1 005.(in Chinese))
[5] 石菊松,石 玲,吴树仁,等. 滑坡风险评估实践中的难点与对策[J]. 地质通报,2009,28(8):1 030.(SHI Jusong,SHI Ling,WU Shuren,et al. Difficulties and countermeasures in the practice of landslide risk assessment[J]. Geological Bulletin of China,2009,28(8):1 030.(in Chinese))
[6] 吴 越,刘东升,陆 新,等. 承灾体易损性评估模型与滑坡灾害风险度指标[J]. 岩土力学,2011,32(8):2 487–2 493.(WU Yue,LIU Dongsheng,LU Xin,et al. Vulnerability assessment model for hazard bearing body and landslide risk index[J]. Rock and Soil Mechanics,2011,32(8):2 487–2 493.(in Chinese))
[7] 吴 越,刘东升,陆 新,等. 基于功–能关系的滑坡典型受灾体易损性评估模型[J]. 岩石力学与工程学报,2011,30(增1):2 946–2 953.(WU Yue,LIU Dongsheng,LU Xin,et al. A quantitative vulnerability assessment model for typical element at landslide risk based on work-energy transformation[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(Supp.1):2 946–2 953.(in Chinese))
[8] 吴 越,刘东升,陆 新,等. 滑坡灾害典型受灾体失效概率计算方法及应用[J]. 土木建筑与环境工程,2011,33(2):46–51.(WU Yue,LIU Dongsheng,LU Xin,et al. A calculation for failure probability of typical element at landslide risk[J]. Journal of Civil,Architectural and Environmental Engineering,2011,33(2):46–51. (in Chinese))
[9] FRANCOIS L. The mobility of long-runout landslides[J]. Engineering Geology,2002,63:301–331.
[10] TANG C L,HU J C,LIN M L. The Tsaoling landslide triggered by the Chi-Chi earthquake,Taiwan:Insights from a discrete element simulation[J]. Engineering Geology,2009,106:1–19.
[11] 吴 越,刘东升,李明军. 岩体滑坡冲击能计算及受灾体易损性定量评估[J]. 岩石力学与工程学报,2011,30(5):901–909.(WU Yue,LIU Dongsheng,LI Mingjun. Impact energy calculation for rock slope and quantitative assessment of vulnerability for element at risk[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(5):901–909.(in Chinese))
[12] SCOTT M D. Landslide runout analysis—current practice and challenges[J]. Canadian Geotechnical,2017,(54):605–620.
[13] 吴 越,刘东升,李明军. 滑体下滑及冲击受灾体过程中的能耗规律模型实验[J]. 岩石力学与工程学报,2011,30(4):693–701.(WU Yue,LIU Dongsheng,LI Mingjun. Landslide model experimental of energy dissipation principle in the sliding and impact process[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(4):693–701.(in Chinese))
[14] 吴 越,刘东升,孙树国,等. 岩土强度参数正态–逆伽马分布的最大后验估计[J]. 岩石力学与工程学报,2019,38(6):1 188–1 196. (WU Yue,LIU Dongsheng,SHUN Shuguo,et al. Maximum posteriori estimation of strength parameters for geotechnical material obeying normal-inverse Gamma distribution[J]. Chinese Journal of Rock Mechanics and Engineering,2019,38(6):1 188–1 196.(in Chinese))
[15] 吴 越,刘东升,周忠浩. 考虑滑动过程内部崩解耗散的滑坡体运动模型[J]. 岩土工程学报,2015,37(1):35–46.(WU Yue,LIU Dongsheng,ZHOU Zhonghao. Mobility assessment model for landslide mass considering disintegration energy consumption in slipping process[J]. Chinese Journal of Geotechnical Engineering,2015,37(1):35–46.(in Chinese))
|
|
|
|