[1] 杨俊哲. 浅埋近距离煤层过上覆采空区及煤柱动压防治技术[J]. 煤炭科学技术,2015,43(6):9–13.(YANG Junzhe. Dynamic pressure prevention and control technology of coal mining face with shallow depth and contiguous seams passing through overburden goaf and coal pillars[J]. Coal Science and Technology,2015,43(6):9–13.(in Chinese))
[2] 高登彦,高登云,侯志成. 特近层间距下煤层综采工作面初采压架机制及处理措施[J]. 煤炭工程,2015,47(8):64–67.(GAO Dengyan,GAO Dengyun,HOU Zhicheng. Mechanism and treatment measures of support crashing in fully mechanized working face during initial mining of coal seam under ultra-thin interburden[J]. Coal Engineering,2015,47(8):64–67.(in Chinese))
[3] 谷拴成,陈 盼,王建文,等. 采空区下煤层开采矿压显现规律实测研究[J]. 煤炭工程,2013,(9):64–67.(GU Shuancheng,CHEN Pan,WANG Jianwen,et al. Research on strata behavior of lower coal seam mining under goaf[J]. Coal Engineering,2013,(9):64–67.(in Chinese))
[4] 于 斌,刘长友,杨敬轩,等. 大同矿区双系煤层开采煤柱影响下的强矿压显现机制[J]. 煤炭学报,2014,39(1):40–46.(YU Bin,LIU Changyou,YANG Jingxuan,et al. Mechanism of strong pressure reveal under the influence of mining dual system of coal pillar in Datong mining area[J]. Journal of China Coal Society,2014,39(1):40–46.(in Chinese))
[5] 鞠金峰,许家林,朱卫兵,等. 神东矿区近距离煤层出一侧采空煤柱压架机制[J]. 岩石力学与工程学报,2013,32(7):1 321–1 330. (JU Jinfeng,XU Jialin,ZHU Weibing,et al. Mechanism of support crushing while mining out of upper goaf-side coal pillar in close distance seams of Shendong[J]. Chinese Journal of Rock Mechanics and Engineering,2013,32(7):1 321–1 330.(in Chinese))
[6] 郑百生,谢文兵,窦林名,等. 不规则煤柱作用下工作面开采的三维数值模拟[J]. 煤炭学报,2006,31(2):137–140.(ZHENG Baisheng,XIE Wenbing,DOU Linming,et al. 3D simulation on caving of face affected by irregular pillar[J]. Journal of China Coal Society,2006,31(2):137–140.(in Chinese))
[7] 吴爱民,左建平,郭志飚,等. 钱家营矿近距离煤层巷道破坏原因及支护对策[J]. 煤炭科学技术,2010,38(1):13–16.(WU Aimin,ZUO Jianping,GUO Zhibiao,et al. Failure causes and support countermeasures of gateway in seam with close distance to other seams in Qianjiaying mine[J]. Coal Science and Technology,2010,38(1):13–16.(in Chinese))
[8] 张 炜,张东升,陈建本,等. 极近距离煤层回采巷道合理位置确定[J]. 中国矿业大学学报,2012,41(2):182–188.(ZHANG Wei,ZHANG Dongsheng,CHEN Jianben,et al. Determining the optimum gateway location for extremely close coal seams[J]. Journal of China University of mining and Technology,2014,41(2):182–188.(in Chinese))
[9] 朱润生. 极近距离煤层回采巷道合理位置确定与支护技术[J]. 煤炭科学技术,2012,40(4):10–17.(ZHU Runsheng. Rational location and support technology of mining gateway in seam with ultra closed distance to above seam[J]. Coal Science and Technology,2012,40(4):10–17.(in Chinese))
[10] 朱 涛,张百胜,冯国瑞,等. 极近距离煤层下层煤采场顶板结构与控制[J]. 煤炭学报,2010,35(2):190–193.(ZHU Tao,ZHANG Baisheng,FENG Guorui,et al. Roof structure and control in the lower seam mining field in the ultra-close multiple seams[J]. Journal of China Coal Society,2010,35(2):190–193.(in Chinese))
[11] 谷拴成,陈 盼,王建文. 近距离煤层采空区下工作面矿压显现规律研究[J]. 煤炭工程,2014,46(5):74–80.(GU Shuancheng,CHEN Pan,WANG Jianwen. Study on mine strata pressure behavior law of coal mining face under goaf of close distance seams[J]. Coal Engineering,2014,46(5):74–80.(in Chinese))
[12] 薛广哲,任博玲,冯宇峰. 近距离煤层下煤层顶板结构力学分析[J]. 煤矿安全,2011,42(2):143–149.(XUE Guangzhe,REN Boling,FENG Yufeng. Study on mine strata pressure behavior law of coal mining face under goaf of close distance seams[J]. Safety in Coal Mines,2011,42(2):143–149.(in Chinese))
[13] 黄庆享,钱鸣高,石平五. 浅埋煤层采场老顶周期来压的结构分析[J]. 煤炭学报,1999,24(6):581–585.(HUANG Qingxiang,QIAN Minggao,SHI Pingwu. Structural analysis of main roof stability during periodic weighting in long wall face[J]. Journal of China Coal Society,1999,24(6):581–585.(in Chinese))
[14] 黄庆享. 浅埋煤层长壁开采顶板结构及岩层控制研究[M]. 徐州:中国矿业大学出版社,2000:151–157.(HUANG Qingxiang. Roof structure and roof control theory of longwall mining in shallow seam[M]. Xuzhou:China University of Mining Technology Press,2000:151–157.(in Chinese))
[15] 贺永年,韩立军,王衍森. 岩石力学简明教程[M]. 徐州:中国矿业大学出版社,2010:147–149.(HE Yongnian,HAN Lijun,WANG Yansen. A concise course of rock mechanics[M]. Xuzhou:China University of Mining,2010:147–149.(in Chinese))