|
[1] 王 旭,李 晓,李守定. 关于用岩体分类预测TBM掘进速率AR的讨论[J]. 工程地质学报,2008,16(4):470–475.(WANG Xu,LI Xiao,LI Shouding. Problems in the prediction of the TBM advance rate with rock mass classification and their possible solutions[J]. Journal of Engineering Geology,2008,16(4):470–475.(in Chinese))
[2] CASSINELLI F,CINA S,INNAURATO N. Power consumption and metal wear in tunnel-boring machines:analysis of tunnel-boring operation in hard rock[C]// Proceedings of the 3rd International Symposium. Brighton:[s. n.],1982:73–81
[3] BARTON N R. TBM tunnelling in jointed and faulted rock[M]. Boca Raton:CRC Press,2000:170–175.
[4] BIENIAWSKI Z T,CELADA B,GALERA J M. TBM excavability:prediction and machine-rock interaction[C]// Proceedings of RETC,Toronto:[s. n.],2007:1 118–1 130.
[5] ALBER M. Advance rates of hard rock TBMs and their effects on project economics[J]. Tunnelling and Underground Space Technology,2005, 15(1):55–64.
[6] LAUGHTON C. Evaluation and prediction of TBM performance in variable rock mass[Ph. D Thesis][D]. Austi:The University of Texas,1998.
[1] 王石春. 隧道掘进机与地质因素关系综述[J]. 世界隧道,1998,(2):39–43.(WANG Shichun. Relationship between TBM Tunneling and geological conditions[J]. World Tunnel,1998,(2):39–43.(in Chinese))
[2] 何发亮,谷明成. TBM施工隧道围岩分级方法研究[J]. 岩石力学与工程学报,2002,21(9):1 350–1 354.(HE Faliang,GU Mingcheng. Study on surrounding rock classification of tunnel cut by TBMs[J]. Chinese Journal of Rock Mechanics and Engineering,2002,21(9):1 350–1 354. (in Chinese))
[7] 李春明,彭耀荣. TBM施工隧洞围岩分类方法的探讨[J]. 中外公路,2006,26(3):235–237.(LI Chunming,PENG Yaorong.Discussion about surrounding rock classification of tunnel excavate by TBMs[J]. Journal of China and Foreign Highway,2006,26(3):235–237.(in Chinese))
[1] 张 宁,石豫川,童建刚. TBM施工深埋隧洞围岩分类方法初探[J]. 现代隧道技术,2010,47(5):11–14.(ZHANG Ning,SHI Yuchuan,TONG Jiangang. Discussion on rock classification of TBM excavated deep tunnels[J]. Model Tunnelling Technology,2010,47(5):11–14.(in Chinese))
[2] 王学潮. 南水北调西线工程 TBM 施工围岩分级研究[M]. 郑州:黄河水利出版社,2011:3–25.(WANG Xuechao. Study on surrounding rock classification of tunnel excavate by TBMs of the west route of South to North water transfer project[M]. Zhengzhou:Yellow River Water Conservancy Press,2011:3–25.(in Chinese))
[8] 杨媛媛,黄宏伟. 围岩分类在TBM滚刀寿命预测中的应用[J]. 地下空间与工程学报,2005,1(5):721–724.(YANG Yuanyuan,HUANG Hongwei. Application of rock mass classification in cutter life prediction of TBM[J]. Chinese Journal of Underground Space and Engineering,2005,1(5):721–724.(in Chinese))
[9] 祁生文,伍法权,王大国,等. 岩石隧道掘进机(TBM)的施工速度(AR)与围岩分类[C]// 隧道、地下工程及岩石破碎学术研讨会论文集. [S. l.]:[s. n.],2007:67–76.(QI Shengwen,WU Faquan,WANG Daguo,et al. Advance rate of rock tunnel boring machine and surrounding rock classification[C]// Symposium on Tunneling,Underground Engineering and Rock Fragmentation. [S. l.]:[s. n.],2007:67–76.(in Chinese))
[10] 祁生文,伍法权. 基于模糊数学的TBM施工岩体质量分级研究[J]. 岩石力学与工程学报,2011,30(6):1 225–1 229.(QI Shengwen,WU Faquan. Surrounding rockmass quality classification of tunnel cut by TBM with fuzzy mathematics method[J]. Chinese Journal of Rock Mechanics and Engineering,2011,30(6):1 225–1 229.(in Chinese))
[11] 闫长斌,路新景. 基于改进的距离判别分析法的南水北调西线工程TBM施工围岩分级[J]. 岩石力学与工程学报,2012,31(7):1 446–1 451.(YAN Changbin,LU Xinjing. Classification of surrounding rock mass by TBM tunneling based on improved distance discriminant analysis method in west route of South-to-North water transfer project[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(7):1 446–1 451.(in Chinese))
[12] 王 攀,郭 伟,朱殿华. 基于模糊聚类理论的 TBM 施工围岩可掘进性分级预测模型[J]. 现代隧道技术,2014,51(6):58–64. (WANG Pan,GUO Wei,ZHU Dianhua. Fuzzy clustering theory based rock mass cuttability classification prediction model for TBM tunneling[J]. Model Tunnelling Technology,2014,51(6):58–64.(in Chinese))
[13] 中华人民共和国国家标准编写组.GB/T 50218—2014 工程岩体分级标准[S]. 北京:中国计划出版社,2015.(The National Standards Compilation Group of People¢s Republic of China. GB/T 50218—2014 Standard for engineering classification of rock mass[S]. Beijing: China Planning Press,2015.(in Chinese))
[14] 刘泉声,刘建平,潘玉丛,等. 硬岩隧道掘进机性能预测模型研究进展[J]. 岩石力学与工程学报,2016,35(增1):2 767–2 786.(LIU Quansheng,LIU Jianping,PAN Yucong,et al. Research advances of tunnel boring machine performance prediction models for hard rock[J]. Chinese Journal of Rock Mechanics and Engineering,2016,35(Supp.1):2 767–2 786.(in Chinese))
[15] KLEIN S,SCHMOLL M,AVERY T. TBM performance at four hard rock tunnels in California[C]// Rapid Excavation and Tunnelling Conference,[S. l.]:Soc for Mining,Metallurgy and Exploration Inc.,1995:61–75.
[16] BRULAND A. Hard rock tunnel boring[Ph. D Thesis][D]. Trondheim:Norwegian University of Science and Technology,1998.
[17] ROSTAMI J. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure[Ph. D Thesis][D]. Golden:Colorado School of Mines,1997.
[18] FARROKH E,ROSTAMI J,LAUGHTON C. Study of various models for estimation of penetration rate of hard rock TBMs[J]. Tunnelling and Underground Space Technology,2012,30(1):110–123.
[19] YAGIZ S. Utilizing rock mass properties for predicting TBM performance in hard rock condition[J]. Tunnelling and Underground Space Technology,2008,23(3):326–339.
[20] GONG Q M,ZHAO J. Development of a rock mass characteristics model for TBM penetration rate prediction[J]. International Journal of Rock Mechanics and Mining Sciences,2009,46(1):8–18.
[21] HASSANPOUR J,ROSTAMI J,KHAMEHCHIYAN M,et al. Developing new equations for TBM performance prediction in carbonate- argillaceous rocks:a case history of Nowsood water conveyance tunnel[J]. Geomechanics and Geoengineering:An International Journal,2009,4(4):287–297.
[22] HASSANPOUR J,ROSTAMI J,KHAMEHCHIYAN M,et al. TBM performance analysis in pyroclastic rocks:a case history of Karaj water conveyance tunnel[J]. Rock Mechanics and Rock Engineering,2010,43(4):427–445.
[23] HASSANPOUR J,ROSTAMI J,ZHAO J. A new hard rock TBM performance prediction model for project planning[J]. Tunnelling and Underground Space Technology,2011,26(5):595–603.
[24] 刁振兴,薛亚东,王建伟. 引汉济渭工程岭北隧洞TBM利用率分析[J]. 隧道建设,2015,35(增2):1 361–1 368.(DIAO Zhenxing,XUE Yadong,WANG Jianwei. Analysis on TBM availability in construction of Lingbei tunnel of Hanjiang River—Weihe River water conveyance project[J]. Tunnel Construction,2015,35(Supp.2):1 361–1 368.(in Chinese))
[1]
|