[1] |
翟祥才. 基桩自平衡法静载试验分析及荷载箱的改良和应用[硕士学位论文][D].济南:山东大学,2016.(ZHAI Xiangcai. The analysis of static load test with pile self-balancing method and the improvement and application of the load box[M. S. Thesis][D]. Jinan:Shandong University,2016.(in Chinese))
|
[2] |
中华人民共和国行业标准编写组. JGJ94—2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.(The Professional Standards Compilation Group of People¢s Republic of China. JGJ94—2008 technical code for building pile foundation[S]. Beijing:China ArchitectureandBuilding Press,2008.(in Chinese))
|
[3] |
中华人民共和国行业标准编写组. JTG D63—2007公路桥涵地基与基础设计规范[S]. 北京:人民交通出版社,2007.(The Professional Standards Compilation Group of People¢s Republic of China. JTG D63—2007 Code for design of ground base and foundation of highway bridges and culverts[S]. Beijing:China Communications Press,2007.(in Chinese))
|
[4] |
王卫东,吴江斌,聂书博. 武汉绿地中心大厦大直径嵌岩桩现场试验研究[J]. 岩土工程学报,2015,37(11):1 945-1 954.(WANG Weidong,WU Jiangbin,NIE Shubo. Field loading tests on large-diameter rock-socketed bored piles of Wuhan Greenland Center Tower[J]. Chinese JournalGeotechnical Engineering,2015,37(11):1945-1954.(in Chinese))
|
[5] |
樊 玲,彭述权,尹小波,等. 南水北调澧河渡槽基桩承载力测试案例分析[J]. 岩石力学与工程学报,2012,31(增1):3421-3427. (FAN Ling,PENG Shuquan,YIN Xiaobo,et al. Case study of pile bearing capacity test at Lihe river aqueduct of south-to-north water transfer project[J]. Chinese Journal of Rock Mechanics and Engineering,2012,31(Supp.1):3421-3427.(in Chinese))
|
[6] |
于微微. 自平衡法试桩在实际工程中的应用研究[硕士学位论文][D]. 哈尔滨:哈尔滨工程大学,2012.(YU Weiwei. Self-balanced load test pile method in practical engineering application[M. S. Thesis][D].Harbin:Harbin Engineering University,2012.(in Chinese))
|
[7] |
陈伟民,胡卫军,陈小强,等.一种透射式半集成光电液位测量方法[J].仪器仪表学报,2005,26(4):425-427.(CHENWeimin,HU Weijun,CHENXiaoqiang,et al. Transmitted semi-integrated optic-electronic liquid leveler[J]. ChineseJournal of Scientific Instrument,2005,26(4):425-427.(in Chinese))
|
[8] |
张 洁,朱 永,谭 靖,等.一种新型连通管式光电液位传感器[J]. 仪器仪表学报,2004,25(4):203-205.(ZHANG Jie,ZHU Yong,TANJing,et al. A new photoelectric liquid level sensor based on joint-hoses[J]. ChineseJournal of Scientific Instrument,2004,25(4):203-205.(in Chinese))
|
[9] |
雷小华.大跨径拱桥多维位移的光电组合监测技术研究[博士学位论文][D]. 重庆:重庆大学,2008,4.(LEIXiaohua.Study on opto-electronic and combinatorial measurement technology of multi-dimensional displacement for long-span arch bridges[Ph. D. Thesis][D].Chongqing:Chongqing University,2008.(in Chinese))
|
[10] |
何晓业.静力水准系统在大科学工程中的应用及发展趋势[J]. 核科学与工程,2006,(4):332-336.(HE Xiaoye.Application of hydrostatic leveling system in key scientificengineering and its developing tendency[J].Chinese Journal of Nuclear Science and Engineering,2006,(4):332-336.(in Chinese))
|
[11] |
汪正兴,王 波,钟继卫,等. 基于液-气耦合压差原理的桥梁挠度测量系统研究[J]. 桥梁建设,2009,39(增2):78-83.(WANG Zhengxing,WANG Bo,ZHONG Jiwei,et al. Research of bridge deflection measurement system based on principle of liquid and air coupling pressure difference[J].Bridge Construction,2009,39(Supp.2):78-83.(in Chinese))
|
[12] |
赵兴雅,汪正兴,朱世峰,等. 新型竖向位移测量系统的研究及应用[J]. 世界桥梁,2011,(1):51-54.(ZHAO Xingya,WANG Zhengxing,ZHU Shifeng,et al. Research and application of a new type of vertical displacement measurement system[J]. World Bridges,2011,(1):51-54.(in Chinese))
|
[13] |
朱世峰,周志祥,吴海军. 基于MEMS的数字压力传感器在竖向位移测量中的应用[J]. 重庆交通大学学报:自然科学版,2015,34(4):20-27.(ZHU Shifeng,ZHOU Zhixiang,WU Haijun.MEMS based digital pressure sensor and its application for vertical displacement measurement[J].Journal of Chongqing Jiaotong University:Natural Science,2015,34(4):20-27.(in Chinese))
|
[14] |
朱世峰,周志祥. 测点处倾角对液位连通管式竖向位移测量的影 响[J]. 科学技术与工程,2017,17(15):185-190.(ZHU Shifeng,ZHOU Zhixiang.Influence on vertical displacement measurement by measuring point inclination angle while using liquid level connected pipe[J]. Science Technology and Engineering,2017,17(15):185-190.(in Chinese))
|
[15] |
朱世峰,汪正兴. 液气耦合式结构竖向位移测量系统精度及误差分析[J]. 世界桥梁,2015,(2):55-59.(ZHU Shifeng,WANG Zhengxing.Precision and error analysis of liquid air coupling structural vertical displacement measuring system[J]. World Bridges,2015,(2):55-59.(in Chinese))
|
[16] |
LIU Y,DENG Y,CAI C S. Deflection monitoring and assessment for a suspension bridge using a connected pipe system:a case study in China[J]. Structural Control and Health Monitoring,2015,22(12): 1408-1425.
|
[17] |
中铁大桥科学研究院有限公司,中铁大桥局集团有限公司. 一种基桩承载力试验位移测试装置:中国,201621089911.7[P]. 2017.04. 12.(ChinaRailwayBridgeScienceResearchInstituteCo.Ltd.,ChinaRailwayMajorBridgeEngineeringGroup Co.Ltd.. Experimental displacement testing device of pile bearing capacity:China,201621089911.7[P]. 2017.04.12.(in Chinese))
|
|
[18]
|