[1] |
邱仓虎,詹永勤,秦玉康,等.北京市音乐堂改扩建工程的结构设计[J]. 建筑科学,1999,15(6):28-32.(QIU Changhu,ZHANG Youqin,QIN Yukang,et al. Structural design for renovation and extension of Beijing music hall[J]. Building Science,1999,15(6):28-32.(in Chinese))
|
[2] |
文颖文,胡明亮,韩顺有,等.既有建筑地下室增设中锚杆静压桩技术应用研究[J]. 岩土工程学报,2013,35(增2):224-229.(WEN Yingwen,HU Mingliang,HAN Shunyou,et al.Application of static bolt-pile technique to construction of basement ofexisting buildings[J]. Chinese Journal of Geotechnical Engineering,2013,35(Supp.2):224-229.(in Chinese))
|
[3] |
浙江省行业标准编写组.DB 33/T1112—2015建筑基坑工程逆作法技术规程[S].北京:中国计划出版社,2015.(The Professional Standards Compilation Group ofZhejiangProvince.DB33/T1112—2015 Technical specification for building foundation excavation engineering constructed by top-down method[S].Beijing:China Planning Press,2015.(in Chinese))
|
[4] |
杨学林,周平槐. 逆作地下室设计中的若干关键问题[J].岩土工程学报,2010,32(增1):238-244.(YANG Xuelin,ZHOU Pinghuai. Some key problems in the design of basements using top-down method[J]. Chinese Journal of Geotechnical Engineering,2010,32(Supp.1):238-244.(in Chinese))
|
[5] |
中华人民共和国行业标准编写组. JGJ 94—2008建筑桩基技术规范[S]. 北京:中国建筑工业出版社,2008.(The Professional Standards Compilation Group of Peoples Republic of China. JGJ 94—2008 Technical code for building pile foundation[S]. Beijing:China Architecture and Building Press,2008.(in Chinese))
|
[6] |
黄茂松,郦建俊,王卫东,等.开挖条件下抗拔桩的承载力损失比分析[J]. 岩土工程学报,2008,30(9):1291-1297.(HUANG Maosong,LI Jianjun,WANG Weidong,et al.Loss ratio of bearing capacity of uplift piles under deep excavation[J].Chinese Journal of Geotechnical Engineering,2008,30(9):1 291-1 297.(in Chinese))
|
[7] |
龚晓南,伍程杰,俞 峰,等. 既有地下室增层开挖引起的桩基侧摩阻力损失分析[J]. 岩土工程学报,2013,35(11):1 958-1 964.(GONG Xiaonan,WU Chengjie,YU Feng,et al.Shaft resistance loss of piles due to excavation beneath existing basements[J]. Chinese Journal of Geotechnical Engineering,2013,35(11):1 958-1 964.(in Chinese))
|
[8] |
伍程杰,龚晓南,俞 峰,等. 既有高层建筑地下增层开挖桩端阻力损失[J]. 浙江大学学报,2014,48(4):671-678.(WU Chengjie,GONG Xiaonan,YU Feng,et al.Pile base resistance loss for excavation beneath existing high-rise building[J]. Journal of Zhejiang University,2014,48(4):671-678.(in Chinese))
|
[9] |
CHANDLER R J. The shaft friction of piles in cohesive soils in terms of effective stress[J]. Civil Engineering and Public Works Review,1968,63:48-51.
|
[10] |
乐云祥,任 飞,常 英.高桩承台的稳定分析[J]. 桥梁建设,2004,(1):16-19.(YUEYunxiang,REN Fei,CHANG Ying. Stability analysis of elevated pile caps[J].BridgeConstruction,2004,(1):16-19.(in Chinese))
|
[11] |
邹新军,赵明华. 高承台嵌岩灌注桩屈曲稳定分析的能量法统一解及工程应用[J]. 公路工程,2007,32(4):1-4.(ZOU Xinjun,ZHAO Minhua. A unified analytic solution to the buckling problem of rock-socked filling pile with highrise cap by energy method[J].Highway Engineering,2007,32(4):1-4.(in Chinese))
|
[12] |
杨学林,周平槐.逆作法基坑竖向支承系统设计研究[J]. 建筑结构,2012,42(8):99-103.(YANG Xuelin,ZHOU Pinghuai. Study on design for the vertical supporting systems of foundation pit using top-down method[J].Building Structure,2012,42(8):99-103.(in Chinese))
|
[13] |
中华人民共和国行业标准编写组. JTG D62—2012公路钢筋混凝土及预应力混凝土桥涵设计规范[S]. 北京:人民交通出版社,2012.(The Professional Standards Compilation Group of People¢s Republic of China. JTG D62—2012Code for design of Highway reinforced concrete and prestressed concrete bridgeand culverts[S]. Beijing:China CommunicationsPress,2012.(in Chinese))
|
[14] |
Comite Euro-International dubeton. CEB-FIP model code 1990[S].London:Thomas Telford Services Ltd.,1993.
|