| [1] |
EDDEBBARH A L,CARLSON F,HEMKER C J, Groundwater modeling using an integrated large-capacity finite-element model for multiple aquifer groundwater flow[C]// Proceedings of the 1996 Symposium on Subsurface Fluid Flow Modeling. [S.l.]:[s.n.],1996:22-23.
|
| [2] |
ILLANGASEKARE T,MOREL-SEYTOUX H J Stream-aquifer influence coefficients as tools for simulation and management[J].Water Resources Research,1982,18:100-101.
|
| [3] |
WANGH F,PERARIEJ. Introduction to groundwater modeling[M]. [S. l.]:W. H. FreemanandCompany,1982:101-108.
|
| [4] |
邹成杰. 水利水电岩溶工程地质[M]. 北京:中国水利电力出版社,1994:1-316.(ZOU Chengjie.Karstengineering geology in water resources and hydropower[M]. Beijing:ChinaWaterPowerPress,1994:1-316.(in Chinese))
|
| [5] |
彭土标,袁建新,王惠民. 水力发电工程地质手册[M]. 北京:中国水利水电出版社,2011:110-448.(PENG Tubiao,YUAN Jianxin,WANG Huimin.Handbookof hydropower engineering geology[M]. Beijing:ChinaWaterPowerPress,2011:110-448.(in Chinese))
|
| [6] |
付 兵. 四川省武都水库坝基岩溶发育特征及其对工程影响研 究[硕士学位论文][D]. 成都:西南交通大学,2006.(FU Bing. Study ofkarst development characteristics in dam foundation and its influence on the project in Sichuan WuduReservoir[M. S. Thesis][D]. Chengdu:Southwest Jiaotong University,2006.(in Chinese))
|
| [7] |
李旦江,储海宁.对大坝渗压监测中两个问题的看法[J]. 大坝与安全,2005,(5):39-43.(LI Danjiang,CHU Haining.Opinions on the two problems in seepage pressure monitoring[J]. Dam and Safety,2005,(5):39-43.(in Chinese))
|
| [8] |
赵 瑞,许 模. 水库岩溶渗漏及防渗研究综述[J]. 地下水,2011,33(2):20-23.(ZHAO Rui,XUMo.Summary on reservoir karst seepage and antiseepage research[J]. Groundwater,2011,33(2):20-23.(in Chinese))
|
| [9] |
许模,王士天.工程水文地质学及其在水电工程中的应用概述[J].
|
|
工程地质学报,2003,11(4):396-401.(XU Mo,WANG Shitian. Summaryof engineering hydrogeology and its applicationin hydropower engineering[J]. Journal of Engineering Geology,2003,11(4):396-401.(in Chinese))
|
| [10] |
刘庶华,何国连.株树桥水库大坝渗漏原因初步分析[J].水力发电,2003,29(2):65-68.(LIU Shuhua,HEGuolian.Analysis on the seepage causes of the dam of Zhushuqiao Reservoir[J]. HydroelectricPower,2003,29(2):65-68.(in Chinese))
|
| [11] |
熊德森.水工建筑物岩溶渗漏问题综述[J].贵州地质,2003,20(2):106-110.(XIONG Desen. Summary on karst leakage problems of hydraulic structures[J]. Guizhou Geology,2003,20(2):106-110.(in Chinese))
|
| [12] |
彭仕雄,杨建,梁杏,等.紫坪铺坝址左岸邻谷渗漏问题分析[J].水电站设计,2006,22(2):100-104.(PENGShixiong,YANG Jian,LIANG Xing,et al.Analysis ofseepage problem on the left bank adjacent in Zipingpu dam[J]. Design of Hydroelectric Power Station,2006,22(2):100-104.(in Chinese))
|
| [13] |
范素芳. 坝堤渗漏监测关键技术及方法研究[硕士学位论文][D]. 湘潭:湖南科技大学,2012.(FAN Sufang.Research on the key technology and method of dam seepage monitoring[M. S. Thesis][D]. Xiangtan:Hunan University of Science and Technology,2012.(in Chinese))
|
| [14] |
肖万春.水库岩溶渗漏勘察技术要点与方法研究[J].水力发电,2008,34(7):101-105.(XIAO Wanchun.Keystones and methods study of karst reservoir leakage investigation[J].Hydroelectric Power,2008,34(7):101-105.(in Chinese))
|
| [15] |
卫爱民,陈晓霞.复杂岩溶地区麒麟观水库渗漏分析研究[J].低温建筑技术,2005,(4):102-106.(WEI Aimin,CHEN Xiaoxia.Analysis of reservoir conditions about karst leakage in Qilinguan reservoir[J]. LowTemperatureArchitectureTechnology,2005,(4):102-106.(in Chinese))
|
| [16] |
郑玉元,李景阳,周丕康. 松柏山水库库首左岸岩溶渗漏及防渗处理研究[J]. 中国岩溶,1999,(1):98-102.(ZHENG Yuyuan,LI Jingyang,ZHOU Pikang.Research on karst leakage and antiseepage measurement on left bank of head of songbaishan reservoir[J]. Carsologica Sinica,1999,(1):98-102.(in Chinese))
|
| [17] |
黄静美. 岩溶地区水库渗漏问题及坝基防渗措施研究[硕士学位论文][D]. 成都:四川大学,2006.(HUANGJingmei. Study onreservoir leakage and antiseepage measurement of dam foundation in karst region[M. S. Thesis][D]. Chengdu:Sichuan University,2006.(in Chinese))
|