| [1] |
陈珙新,祝红,熊进. 三峡工程F215断层复合灌浆处理试验研究[J].长江科学院院报,2000,17(6):9-11.(CHEN Gongxin,ZHU Hong,XIONG Jin. Experimental research on compound grouting treatmentat fault F215of TGP[J]. Journal of Yangtze River Scientific Research Institute,2000,17(6):9-11.(in Chinese))
|
| [2] |
董建军,魏涛,吕书云. 三峡工程f1096断层复合灌浆处理技术[J]. 长江科学院院报,2005,22(2):35-38.(DONG Jianjun,WEI Tao,LU Shuyun. Treating technique on composite grouting at fault f1096of TGP[J]. Journal of Yangtze River Scientific Research Institute,2005,22(2):35-38.(in Chinese))
|
| [3] |
陈秋华,邵敬东,赵永刚,等. 复杂地基条件下的拱坝基础处理资料汇编[R]. 成都:国家电力公司成都勘测设计研究院,2001.(CHENQiuhua,SAOJingdong,ZHAOYonggang,et al. Compilationof foundation treatmentof arch dam under complex foundationcondition[R]. Chengdu:Chengdu Hydroelectric Investigation and Design Institute of State Power Corporation,2001.(in Chinese))
|
| [4] |
陈秋华. 复杂地基条件下的高拱坝基础处理思路及技术实践[C]// 混凝土坝筑坝技术——锦屏一级工程专辑. 北京:中国水利水电出版社,2013:21-29.(CHENQiuhua. Managementand engineering practiceof foundation treatmentof high arch dam under complexfoundationcondition[C]// Proceedings of DammingTechniqueof Concrete Dam—Special Issueof Jinping I Project. Beijing:ChinaWaterPowerPress,2013:21-29.(in Chinese))
|
| [5] |
中国水电顾问集团成都勘测设计研究院. 雅砻江锦屏一级水电站化学灌浆试验效果评价及应用设计报告[R]. 成都:中国水电顾问集团成都勘测设计研究院,2010.(PowerChina Chengdu Engineering CorporationLimited. Effectivenessevaluationandapplicationdesignand presentation of test of chemicalgroutingon JinpingIhydropower station of Yalungriver[R]. Chengdu:PowerChina Chengdu Engineering CorporationLimited,2010.(in Chinese))
|
| [6] |
中国水电顾问集团成都勘测设计研究院. 雅砻江锦屏一级水电站化学灌浆招标设计报告[R]. 成都:中国水电顾问集团成都勘测设计研究院,2010.(PowerChina Chengdu Engineering CorporationLimited. Design report for bid of chemicalgroutingon JinpingIhydropower stationof Yalungriver[R]. Chengdu:PowerChina Chengdu Engineering CorporationLimited,2010.(in Chinese))
|