|
[1] 陈珙新,祝 红,熊 进. 三峡工程F215断层复合灌浆处理试验研究[J]. 长江科学院院报,2000,17(6):9–11.(CHEN Gongxin,ZHU Hong,XIONG Jin. Experimental research on compound grouting treatment at fault F215 of TGP[J]. Journal of Yangtze River Scientific Research Institute,2000,17(6):9–11.(in Chinese))
[2] 董建军,魏 涛,吕书云. 三峡工程f1096断层复合灌浆处理技术[J]. 长江科学院院报,2005,22(2):35–38.(DONG Jianjun,WEI Tao,LU Shuyun. Treating technique on composite grouting at fault f1096 of TGP[J]. Journal of Yangtze River Scientific Research Institute,2005,22(2):35–38.(in Chinese))
[3] 陈秋华,邵敬东,赵永刚,等. 复杂地基条件下的拱坝基础处理资料汇编[R]. 成都:国家电力公司成都勘测设计研究院,2001.(CHEN Qiuhua,SAO Jingdong,ZHAO Yonggang,et al. Compilation of foundation treatment of arch dam under complex foundation condition[R]. Chengdu:Chengdu Hydroelectric Investigation and Design Institute of State Power Corporation,2001.(in Chinese))
[4] 陈秋华. 复杂地基条件下的高拱坝基础处理思路及技术实践[C]// 混凝土坝筑坝技术——锦屏一级工程专辑. 北京:中国水利水电出版社,2013:21–29.(CHEN Qiuhua. Management and engineering practice of foundation treatment of high arch dam under complex foundation condition[C]// Proceedings of Damming Technique of Concrete Dam—Special Issue of Jinping I Project. Beijing:China Water Power Press,2013:21–29.(in Chinese))
[5] 中国水电顾问集团成都勘测设计研究院. 雅砻江锦屏一级水电站化学灌浆试验效果评价及应用设计报告[R]. 成都:中国水电顾问集团成都勘测设计研究院,2010.(PowerChina Chengdu Engineering Corporation Limited. Effectiveness evaluation and application design and presentation of test of chemical grouting on Jinping I hydropower station of Yalung river[R]. Chengdu:PowerChina Chengdu Engineering Corporation Limited,2010.(in Chinese))
[6] 中国水电顾问集团成都勘测设计研究院. 雅砻江锦屏一级水电站化学灌浆招标设计报告[R]. 成都:中国水电顾问集团成都勘测设计研究院,2010.(PowerChina Chengdu Engineering Corporation Limited. Design report for bid of chemical grouting on Jinping I hydropower station of Yalung river[R]. Chengdu:PowerChina Chengdu Engineering Corporation Limited,2010.(in Chinese))
|